← All vessels
SEAWAYS ATHENS
SEAWAYS ATHENS is a 2012 tank ship. The Coast Guard has recorded 14 inspections since 2016, most recently in April 2026, along with 3 deficiencies and 1 operational control.
Records from 2016 to 2026. Most recent: inspection, 13 April 2026.
- Built
- 2012
- Last inspected
- 13 April 2026
- Documentation
- Not in the documentation file of 10 August 2026
- Deficiencies
- 3 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9470260
V7WR9
1140383
Flag
MARSHALL ISLANDS
Maury page id
psix-1140383
Inspections, by type
The 14 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Documentation record
Tonnage as PSIX records it13574 - Convention (Subpart B), Net Ton
60976 - Displacement, Metric Ton
50341 - Dead Weight, Metric Ton
30066 - Convention (Subpart B), Gross Ton
60976 - Displacement, Metric Ton
50341 - Dead Weight, Metric Ton
30066 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.
Inspection history · 14
13 April 2026
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8346862
10 January 2026
COC-CHEM & TVE Annual · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8289824
30 December 2024
PSC B · COC-TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8050483
17 January 2024
COC-CHEM & TVE Annual · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7847695
8 November 2022
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7591285
15 June 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7480078
4 November 2021
PSC B · Ballast Water Examination · COC-CHEM Annual
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7339559
16 October 2020
PSC A · COC-CHEM Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7078418
29 February 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6917999
13 October 2019
ISPS II Exam · COC-CHEM & TVE Annual · Ballast Water Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6832418
1 September 2018
COC-CHEM & TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6527336
27 September 2017
Ballast Water Examination · ISPS II Exam · Deficiency Check · COC-CHEM & TVE Annual
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6273635
21 August 2016
ISPS II Exam · COC-CHEM & TVE Renew · Ballast Water Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5975468
17 August 2016
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5975394
Deficiency record · 3
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 8 November 2022
Resolved
THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTENS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. [name withheld] #1 SOLENOID INOPERABLE.
74 SOLAS (20) II-1 / 26.1
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 13 October 2019
Resolved
Means shall be provided to control leaks of flammable liquids. The forward high pressure fuel injector on the #1 cylinder of the ship's main engine was leaking fuel on top of the cylinder and accumulating around the main engine.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 27 September 2017
Resolved
1870-Special Requirements- The inert gas system shall be capable of delivering inert gas with an oxygen content of not more than 5% by volume. Inert gas system was unable to produce inert gas with oxygen content below 5%. 74 SOLAS (14) II-2/5.5 - FSS 15.2.2.1.3 - 17a/c
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.