Records from 2016 to 2025. Most recent: inspection, 30 September 2025.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 14
30 September 2025
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8237424
2 October 2024
Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7991722
18 July 2024
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7941224
2 October 2023
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7800759
6 October 2022
Internal Structural Exam · Annual Inspection · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7568001
5 October 2021
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7318055
30 September 2020
Hull Examination · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7064041
22 August 2019
In-Service Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6792289
16 August 2019
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6795106
31 July 2019
Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6761348
25 September 2018
Hull Examination · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6547055
25 August 2017
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6256719
12 May 2017
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6144512
29 September 2016
Construction Oversight · Deficiency Check · Hull Examination · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6009304
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 2 October 2024
Resolved
An internal structural examination conducted in compliance with § 176.600 may be conducted while the vessel is afloat or out of the water and consists of a complete examination of the vessel's main strength members, including the major internal framing, the hull plating and planking, voids, and ballast, cargo, and fuel oil tanks. 02 veridical cracks were found on the stern transom by the outboard engine. Vessel to proved repair proposal to Marine Inspect for attended repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2024
Resolved 27 November 2024
Resolution: Rep provided photos of repaired/corrected hull damage, accepted by MI.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 18 July 2024
Resolved
The master of a vessel shall keep a correct, written count of all passengers that embark on and disembark from the vessel. Prior to departing on a voyage, the passenger count must be communicated verbally or in writing, and available ashore at the vessel's normal berthing location or with a representative of the owner or managing operator of the vessel. The passenger count shall be available to the Coast Guard upon request. Vessel does not take or record passenger counts.
Action required: 10 - Deficiency Rectified
Resolved 18 July 2024
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 18 July 2024
Resolved
The inspection and maintenance of the equipment listed in paragraph (a) of this section shall be logged or otherwise documented for review by the Coast Guard upon request. No record of maintenance was available upon request.
Action required: 10 - Deficiency Rectified
Resolved 18 July 2024
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 18 July 2024
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. Only one portable light was located on board the vessel.
Action required: 10 - Deficiency Rectified
Resolved 18 July 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 August 2019
Resolved
Propulsion machinery must be suitable in type and
design for propulsion requirements of the hull in which
it is installed and capable of operating.
Vessel’s outboard motor is missing propeller due to unknown cause. Vessel not to carry passengers until propeller is properly re-installed to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 August 2019
Resolution: Vessel rep submitted photo of new prop installed on motor and conducted satisfactory sea trials.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 31 July 2019
Resolved
The installation of fuel lines, including pipe, tube, and hose, must comply with the requirements of this paragraph. Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the machinery space, it must be located so that the operator does not have to reach more than (12 inches) into the machinery space and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material.
There is no fuel shutoff valve located at the tank connection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2019
Resolved 14 August 2019
Resolution: Vessel operator submitted evidence that a fuel shutoff with markings was added to fuel tank.
Accommodation/Occupational Safety › Ventilation › General
Issued 6 October 2016
Resolved
46 CFR 182.460 (a) (1): provide plans for the installation of enclosed space ventilation to [name withheld] by 01JAN17.
Action required: 705 - Other - as specified
Due 1 January 2017
Resolved 4 August 2017
Resolution: plans provided, approved and work in progress of completion.
Accommodation/Occupational Safety › Ventilation › General
Issued 6 October 2016
Resolved
46CFR 182.460: Not to carry more than 6 passengers until approved ventilation system installed to the satisfaction of [name withheld] by 01MAY17.
Action required: 705 - Other - as specified
Due 26 May 2017
Resolved 25 August 2017
Resolution: install fire suppression system in fuel tank compartment and ventilation system in fuel tank compartment. Both installed. Fire boy is HFC 227 5lb. VSL posted updated emergency instructions reflecting new systems.
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 6 October 2016
Resolved
46CFR 181.400 (a) (5): Provide calculations for total aggregate area (not to include fuel tank) beneath decking. Provide plans for the installation of fixed fire extinguishing system to cover enclosed space beneath decking to [name withheld] by 01JAN17.
Action required: 705 - Other - as specified
Due 1 January 2017
Resolved 4 August 2017
Resolution: plans provided, approved and work in progress of completion.
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 6 October 2016
Resolved
46 CFR 181.420 Not to carry more than 6 passengers until approved fixed gas extinguishing system installed to the satisfaction of [name withheld] 01MAY17.
Action required: 705 - Other - as specified
Due 26 May 2017
Resolved 25 August 2017
Resolution: install fire suppression system in fuel tank compartment and ventilation system in fuel tank compartment. Both installed. Fire boy is HFC 227 5lb. VSL posted updated emergency instructions reflecting new systems.
Engineering › Fuel Oil Service System › Hose
Issued 29 September 2016
Resolved
Gasoline fuel supply hose was not J-1942, required VSL to replace with approved hose and fittings by 15OCT16, 46 CFR 182-720.
Action required: 705 - Other - as specified
Due 15 October 2016
Resolved 4 August 2017
Resolution: new J-1942 hose replaced