MAURY USCG vessel records
← All vessels

ORANGE TIGER

ORANGE TIGER is a 2011 freight ship. The Coast Guard has recorded 2 inspections since 2017, most recently in January 2025, along with 1 deficiency.

Records from 2017 to 2025. Most recent: inspection, 23 January 2025.

Built
2011
Last inspected
23 January 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 23 January 2025
Operational controls None recorded without a removal date
Years with a record 2 calendar years (2017–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9446611
1144865
Flag
PANAMA
Maury page id
psix-1144865

Documentation record

Tonnage as PSIX records it181395 - Dead Weight, Metric Ton
206429 - Displacement, Metric Ton
92752 - Convention (Subpart B), Gross Ton
60504 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 2

23 January 2025 Deficiency Check · PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8068790
29 March 2017 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6113498

Deficiency record · 1

07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 January 2025 Resolved
74 SOLAS (14)II-2/2.1.1.2 THE FOLLOWING FIRE PROTECTION SYSTEM SHALL BE KEPT IN GOOD ORDER SO AS TO ENSURE THEIR REQUIRED PERFORMACE IF FIRE OCCURS. FIRE DETECTION AND FIRE ALARM SYSTEMS. PSCO OBSERVED A FAULT ON THE FIRE DETECTION PANEL ON BRIDGE
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 January 2025
Resolution: Received, reviewed and accepted class report from NKK.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.