Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it75485 - Dead Weight, Metric Ton 88535 - Displacement, Metric Ton 40913 - Convention (Subpart B), Gross Ton 25963 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.
Inspection history · 6
31 July 2026Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8438765
Fire Fighting › Firemans Outfit › Self-Contained Breathing Apparatus
Issued 31 October 2016Resolved
0735 PERSONAL EQUIPMENT-FIRE FIGHTING. A FIRE FIGHTER'S OUTFIT SHALL CONSIST OF A SET OF PERSONAL EQUIPMENT AND A BREATHING APPARATUS. SCBA REGULATOR WAS NOT OPERABLE. FSS CODE 3.2.1 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 31 October 2016
Resolved 31 October 2016
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. A new SCBA (SN: 9952713) was delivered to the vessel.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 31 October 2016Resolved
0618 STOWAGE OF RESCUE BOATS. RESCUE BOAT SHALL BE STOWED IN A STATE OF CONTINUOUS READINESS FOR LAUNCHING AND RECOVERY. LIMIT SWITCH WIRE ON DAVIT IS BROKEN. SOLAS 74(14CONS) CH. III/14 (17ac)
Action required: 17 - Rectify deficiencies prior to departure
Due 31 October 2016
Resolved 31 October 2016
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. The limit switch wire was replaced and tested.
1499 PROP. AUX MACHINERY. THE MACHINERY SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. THE #3 GENERATOR HAS A SIGNIFICANT OIL LEAK COMING FROM A BOLT ON THE BOTTOM OF THE LOW PRESSURE OIL PUMP. SOLAS 74(14 CONS) CH. II-1/26.1 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 October 2016
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. The loose bolt that led to oil leakage was replaced. Pump test carried out and found in order.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.