SW MISTRAL I is a 2011 freight ship. The Coast Guard has recorded 5 inspections since 2017, most recently in October 2025, along with 2 deficiencies and 1 operational control.
Records from 2017 to 2025. Most recent: inspection, 4 October 2025.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it32305 - Regulatory (Subpart C or D), Gross Ton 67802 - Displacement, Metric Ton 58110 - Dead Weight, Metric Ton 32305 - Convention (Subpart B), Gross Ton 19458 - Regulatory (Subpart C or D), Net Ton 19458 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.
Inspection history · 5
4 October 2025Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8246076
30 August 2024Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7992649
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 25 November 2021Resolved
CG006 - POLLUTION PREVENTION/BALLAST WATER/BWMS - THE ARRANGEMENT OF THE BILGE AND BALLAST PUMPING SYSTEM SHALL BE SUCH AS TO PREVENT THE POSSIBILITY OF WATER PASSING FROM THE SEA AND FROM WATER BALLAST SPACES INTO THE CARGO AND MACHINERY SPACES. PSCO OBSERVED WATER LEAKING FORM SEAL ON NUMBER 2 BALLAST PUMP. - 74SOLAS(20)II-1/35-1.2.4 - 10C
Action required: 10 - Deficiency Rectified
Due 25 November 2021
Resolved 25 November 2021
Resolution: CREW RECTIFIED LEAK.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 25 November 2021Resolved
09211 - STEAM PIPES AND PRESSURE PIPES - EVERY STEAM PIPE AND EVERY FITTING CONNECTED THERETO THROUGH WHICH STEAM MAY PASS SHALL BE SO DESIGNED CONSTRUCTED AND INSTALLED AS TO WITHSTAND THE MAXIMUM WORKING STRESSES TO WHICH IT MAY BE SUBJECTED. PSCO OBSERVED LEAKING STEAM VALVE ON STEAM LINE LEADING FROM MAIN STEAM LINE TO DIESEL OIL COOLER. - 74SOLAS(20)II-1/33/1 - 10C
Action required: 10 - Deficiency Rectified
Due 25 November 2021
Resolved 25 November 2021
Resolution: CREW REPLACED GASKET AND RECTIFIED LEAK.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.