Records from 2016 to 2024. Most recent: inspection, 20 March 2024.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 5 September 2018
Resolved
1499-OTHER (PROP. & AUX. MACHINERY)- A SECOND SOURCE OF ENERGY SHALL BE PROVIDED FOR AN ADDITIONAL THREE STARTS WITHIN 30 MINUTES UNLESS MANUAL STARTING CAN BE DEMONSTRATED TO BE EFFECTIVE.
MANUAL CRANK START SPRING BROKE WHILE TESTED RENDERING THE SECOND START TO BE INOPERABLE. 74 SOLAS(14)II-I/44.2-17ac
Action required: 17 - Rectify deficiencies prior to departure
Due 5 September 2018
Resolved 7 September 2018
Resolution: Received and verified class report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 September 2018
Resolved
1499- OTHER (PROP. & AUX. MACHINERY)- THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MIMIMUM ANY DANGER TO PERSONS ON BOARD.
THE GASKET TO THE TOPSIDE ACCESS OF THE MARINE SANITATION DEVICE WAS FOUND TO BE ROTTED OUT AND ACTIVELY LEAKING SEWAGE VAPOR INTO THE SPACE. 74 SOLAS(14)II-I/26.1-40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 September 2018
Resolution: Received and verified class report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 5 September 2018
Resolved
1499-OTHER (PROP. & AUX. MACHINERY)- THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MIMIMUM ANY DANGER TO PERSONS ON BOARD.
THE HIGH STEAM PRESSURE GUAGE LINE EXITING THE TOP OF THE BOILER WAS FOUND TO BE ACTIVELY LEAKING. ADDITIONALLY, A FITTING ON THE WATER FEED LINE FOR THE BOILER ON THE STARBOARD SIDE, SECOND DECK OF THE ENGINE ROOM WAS FOUND ACTIVELY LEAKING AND SOAKING THE SURROUNDING LAGGING.
74 SOLAS(14)II-I/26.1-40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 September 2018
Resolution: Received and verified class report.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 September 2018
Resolved
0999-OTHER (SAFETY IN GENERAL)-DOORS REQUIRED TO BE SELF CLOSING SHALL NOT BE FITTED WITH HOLD-BACK HOOKS.
HOLD-BACK HOOKS WERE FOUND TO BE INSTALLED ON 11 SELF-CLOSING DOORS ON THE "A" DECK. 74 SOLAS(09)II-2/0.4.2.2-17ac
Action required: 17 - Rectify deficiencies prior to departure
Due 5 September 2018
Resolved 7 September 2018
Resolution: Received and verified class report.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 7 November 2016
Resolved
0660 - Lifejackets - Before the ship leaves port and at all times during the voyage, all life saving appliances shall be in working order and ready for immediate use. 35 (all) of the ship's lifejackets were found torn open on the left-chest area exposing buoyancy material where manufacturers lights were sewn in (removed due to expiry of lights). 74SOLAS14 III/20.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 November 2016
Resolution: Replaced Lifejackets
Fire Fighting › International Shore Connection › Bolts
Issued 7 November 2016
Resolved
Ships of 500GT and upwards shall be provided with at least one International Shore Connection complying with the fire safety systems code. Ships International Shore Connection missing 04 bolts and 01 washer.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 November 2016
Resolved 7 November 2016
Resolution: Witnessed acquisition of bolts and washers and nuts. Verified quantity, material and size and witnessed satisfactory hydrostatic testing of International Shore Connection via firehose.