Inspection history · 10
4 May 2026
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8355603
24 August 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8216725
17 October 2024
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8020615
27 September 2024
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8010247
16 March 2023
Administrative Inspection · MARPOL Annex VI Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7650890
6 June 2022
PSC B · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7459486
9 December 2019
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6870481
2 December 2019
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6861133
9 September 2017
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6263072
27 August 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6252518
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 27 September 2024
Resolved
The machinery, boilers, and other pressure vessels, associated piping systems fittings shall be of a design and construction adequate for theservice for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards.
74 SOLAS (04) II-1/26.1
PSCO observed the packing gland on the ballast water pump leaking, packing gland on the HFO pump leaking, generator #1 jacket water leaking, and a leak on the main engine fuel return line.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 17 October 2024
Resolution: Packing glands replaced, leaks repaired. All certified by Bureau Veritas.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 September 2024
Resolved
Electrical installations shall be such that: the safety of the passengers, crew, and ship from electrical hazards will be ensured.
74 SOLAS (20) II-1/40.1.3
PSCO observed exposed wires on the light fixture above the switchboard in the emergency generator room and the circuit breaker in ECR for BWTS control cabinet was a higher rating than what was indicated on the panel.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2024
Resolved 17 October 2024
Resolution: The split wiring at light fixture for the emergency generator was replaced for a cable wiring. The labelling for the circuit breaker showing 15A was replaced to show 30A as indicated on the breaker. Examined satisfactorily by BV.
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 27 September 2024
Resolved
Master, owner, operator, agent, or person in charge of a vessel equipped with ballast tanks that operates in the waters of the United States must employ one of the following ballast water management system (BWMS)that has been approved by theCoast Guard...the master, owner, operator, agent, or person in chargeof vessles employing a Coast Guard approved BWMS must meet the applicable ballast water discharge standard (BWDS).
33CFR 151.2025 (a)(1)
PSCO observed BWTS exhibiting "UV intensity USCG low, system flow maintained at 50%, Process not compliant." which indicates system may not be operating as intended.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 October 2024
Resolution: Sensor was replaced as a preventative measure. The captain confirmed that they have
reached out to the system manufacturer to get their response on the matter of compliance.
14 - Pollution Prevention › 148 - Ballast Water › Ballast water discharge
Issued 6 June 2022
Resolved
Unless otherwise expressly provided for, the master, owner, operator, agent or person in charge of vessels employing a coast guard approved BWMS must meet the applicable ballast water discharge standard, at all times of discharge into the waters of the United States. Vessel discharged approx. 20396m3 of untreated ballast water into local waters due to inoperable BWTS. Vessel was unable to treat ballast water due to bypassing U/V filters.
33CFR151.2025(a)(1)
Action required: 10 - Deficiency Rectified
Resolved 6 June 2022
Resolution: Vessel repaired inoperable system.
Stability › Watertight Integrity › General
Issued 9 September 2017
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. USCG SECTOR MARYLAND-NCR WAS NOTIFIED THAT THE VESSEL BUMPED BOTTOM WHILE CONDUCTING CARGO OPERATIONS AT SPARROWS POINT TERMINAL. 74SOLAS(2014 CONS) I/11(A)
Action required: 17 - Rectify deficiencies prior to departure
Due 9 September 2017
Resolved 9 September 2017
Resolution: RCVD CLASS RPT STATING VESSEL IS FIT TO PROCEED TO SEA.