Records from 2016 to 2026. Most recent: inspection, 8 January 2026.
Documentation record
Registered dimensions (L × B × D)60.0 ft × 19.0 ft × 4.0 ft
Registered tonnagegross 30 / net 24
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCHESAPEAKE BOATS, INC. · CRISFIELD, MD, UNITED STATES · built 2011
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portHYPOLUXO, FL
Trade endorsementsCoastwise, unrestricted, Recreational, Registry
DocumentationValid · issued 25 June 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it24 - Simplified, Net Ton
30 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 15
8 January 2026
Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8291431
7 January 2025
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8059494
26 September 2024
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8009770
10 January 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7846574
10 January 2023
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7623279
5 October 2022
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7630214
24 September 2021
DAPI Audit · COI Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7319484
14 January 2021
Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7123753
28 September 2020
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7066598
8 January 2020
Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6884829
21 October 2019
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6838908
22 October 2018
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6565616
12 January 2018
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6336926
26 September 2017
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6275587
14 October 2016
COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6022518
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 14 January 2021
Resolved
Vessel life float found with deteriorated life lines and nylon webbing that has sever UV damage. Operator opted to remove life float instead of replacing. Vessel operating in LBS+LC in warm water restricted to 3 miles from shore equipped with float free EPIRB not required to carry primary life saving equipment.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 January 2021
Resolution: Operator decided to keep life float. Operator made proper repairs to life float.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 January 2021
Resolved
Observed many electrical wiring in engine room with zip ties. Install proper metal support brackets for electrical wiring at 24" intervals.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 January 2021
Resolution: Operator installed metal support brackets at 24" intervals.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 January 2021
Resolved
Aft watertight bulkhead in engine room compromised watertight integrity in way of fuel line penetration in bulkhead. Make proper repairs to bulkhead penetrations to maintain watertight integrity.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 January 2021
Resolution: Made proper repairs to bulkhead to maintain watertight integrity.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 14 January 2021
Resolved
Captains could not provide marine radio operator permits. Provide marine radio operator permits for your licensed captains.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 January 2021
Resolution: Operator provided copies of marine radio operator permits for both captains.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 14 October 2016
Resolved
Satisfactorily undergo required annual inspection to renew COI. COI issued 05OCT2011.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 October 2016
Resolved 14 October 2016
Resolution: completed annual inspection.
Documentation › Logs/Records › MIS Form
Issued 14 October 2016
Resolved
Obtain a copy of the latest MIS report from drug consortium. 46CFR16.500
Condition: Invalid
Due 1 November 2016
Resolved 24 October 2016
Resolution: obtained missing MIS report from the drug consortium.
Engineering › Bilge Water Management System › Pump
Issued 14 October 2016
Resolved
Bilge light for Aft Forward compartment not lighting. Repair or replace light.
Condition: Improper/Lack of Maintenance
Due 25 October 2016
Resolved 24 October 2016
Resolution: light tested and working as designed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 14 October 2016
Resolved
Wing nuts are not authorized on battery terminals. Replace wing nuts with bolt nuts or other secure means not capable of backing off. 46CFR183.350(d)
Due 25 October 2016
Resolved 24 October 2016
Resolution: wing nuts replaced with bolt nuts and secured properly.
Electrical › Electric Supply System (service) › Battery Installation
Issued 14 October 2016
Resolved
Battery box cover missing from battery box on the starboard side of the engine room. Replace battery cover. 46CFR183.350(b)
Due 25 October 2016
Resolved 24 October 2016
Resolution: battery box cover now in place on starboard side battery box.