Records in 2016. Most recent: inspection, 18 April 2016.
Engineering › Steam System (auxiliary) › Lagging/Insulation
Issued 13 March 2016
Resolved
0750 - Fire Prevention - In a ship which fuel oil is used, the arrangements for the storage, distribution and utilization of the oil fuel shall be such to ensure the safety of the ship. PSCO noted oil soaked lagging on the vessels #2 boiler piping. SOLAS 74 am I/11a 17a
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 13 March 2016
Resolved 16 March 2016
Resolution: PSC NOLA received BV Class Report satisfying the requirement.
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 13 March 2016
Resolved
0999 - Other (safety) - The operator of a vessel with the capacity of 250 or more barrels of oil, hazardous material, or liq gas, shall provide transfer procedures. PSCO noted the vessel did not have any cargo transfer procedures. 33 CFR 155.720 c
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 March 2016
Resolved 14 March 2016
Resolution: PSC NOLA received documentation satisfying the requirement.
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 13 March 2016
Resolved
0999 - Other (safety) - The operator of a vessel with the capacity of 250 or more barrels of oil, hazardous material, or liq gas, shall provide transfer procedures. PSCO noted the vessel did not have any transfer procedures for bunkering. 33 CFR 155.720 c
Condition: Placed in Improper Service
Action required: 703 - Prior to bunkering operations
Due 13 March 2016
Resolved 14 March 2016
Resolution: PSC NOLA received documentation satisfying the requirement.
Electrical › Electric Supply System (service) › Cable
Issued 13 March 2016
Resolved
1870 - Special req - The condition of the ship and its equipment shall be maintained to conform with the present regs. PSCO noted two junction boxes at the vessels #1P & #3P cargo pumps that were not electrically sealed and missing bolts. Additionally, the starboard embarkation ladder limit switch was broken and that had chaffed/exposed wires. SOLAS 74am I/11a See narrative for details. a
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 13 March 2016
Resolved 16 March 2016
Resolution: PSC NOLA received documentation satisfying the requirement.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 13 March 2016
Resolved
0725 - Fixed Fire - The condition of the ship and its equipment shall be maintain. PSCO noted the vessels fixed CO2 room had multiple minor cracking on hoses that connects the bottles together for discharging. SOLAS 74am I/11a 50a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 April 2016
Resolved 8 April 2016
Resolution: PSC NOLA received a class report from Bureau Veritas satisfying the requirement.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 13 March 2016
Resolved
1835 - Cargo vent system - The owners/Operators of a foreign flag vessel may submit certification by the classification society which classes the vessel that the vessel meets the requirement of this part. PSCO noted the vessel could not produce a statement of compliance for it vapor control system. 46 CFR 39.10-13(c) 50a
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 April 2016
Resolved 16 March 2016
Resolution: PSC NOLA received documentation satisfying the requirement.
Documentation › Logs/Records › Logbook (official)
Issued 13 March 2016
Resolved
0999 - Safety - No person may cause a vessel to enter into or get underway on the navigable waters of the United States unless no more than 12 hours before entering. PSCO noted that vessels pre-arrival checklist did not meet the requiements. 33 CFR 164.25a 10c
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 13 March 2016
Resolved 13 March 2016
Resolution: Educated Master and crew, carried out the proper checks and verfication, all found satisfactory this date.