← All vessels
LALE S
LALE S is a 2011 freight ship. The Coast Guard has recorded 12 inspections since 2011, most recently in August 2025, along with 2 deficiencies and 2 operational controls.
Records from 2011 to 2025. Most recent: inspection, 1 August 2025.
- Built
- 2011
- Last inspected
- 1 August 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 2 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9603051 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
V7TB6
1160262
Flag
MARSHALL ISLANDS
—
Maury page id
psix-1160262
Inspections, by type
…with no type recorded4
Years with a record
5 calendar years (2011–2025)
The 12 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it32839 - Convention (Subpart B), Gross Ton
19559 - Convention (Subpart B), Net Ton
68970 - Displacement, Metric Ton
57970 - Dead Weight, Metric Ton
19559 - Convention (Subpart B), Net Ton
68970 - Displacement, Metric Ton
57970 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 12
1 August 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8200063
24 July 2025
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8187557
9 September 2021
PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7306257
7 September 2021
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7302789
25 July 2016
Ballast Water Examination · ISPS II Exam · NPV Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5947256
4 July 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5929051
18 August 2014
ISPS I Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4948948
9 August 2014
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4949020
14 December 2011
Ballast Water Examination · ISPS III Exam · PI Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4207565
13 December 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4207624
13 December 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4208749
5 December 2011
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4197354
Deficiency record · 2
Deck/Cargo › Mooring/Anchoring › Brake
Issued 14 December 2011
Resolved
1320 - Starboard Anchor - Forward pin on the brake band of the starboard anchor is broken. Starboard anchor cannot be operated safely in the free fall mode. Provide report from the [name withheld] attesting to the proper operation of the anchor system in all modes of operation. SOLAS 74(a) I/11
Engineering › Lubricating Oil Service System › Valve, Control
Issued 14 December 2011
Resolved
1410 - Propulsion main engine - Vessel experienced power irregularity at MM 88, Lower Mississippi River. Power failure was due to an Auto slow down generated by the cylinder lubricator monitoring system. Chief Engineer was unable to identify the exact cause of the alarm, nor which component was faulty. Chief Engineer was unable to recreate the alarm for PSCO's. SOLAS 74(a) I/11
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.