Inspection history · 10
14 August 2025
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8209663
19 October 2024
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8021595
14 August 2024
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7977357
8 August 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7977378
3 January 2024
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7842333
17 August 2021
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7289091
11 August 2021
COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7284036
14 July 2019
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6741729
29 August 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6249685
20 June 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5908988
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 19 October 2024
Resolved
When operating a vessel on a body of water where the discharge of treated or untreated sewage is prohibited by the EPA under 40 CFR 140.3 or 140.4, the operator must secure each type II device in a manner which prevents discharge of treated or untreated sewage. PSCO discovered the vessel performing a transfer of treated sewage from the grey water holding tank to the hold cleaning bilge tank(p) and sewage leaked into the water through overboard valve BG-32.
33 CFR 159.7(b) 10c
Action required: 10 - Deficiency Rectified
Resolved 19 October 2024
Resolution: crew secured valve to prevent further discharge
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 3 January 2024
Resolved
Oil fuel pipes, which, if damaged, would allow oil to escape a storage, settling or daily service tank having a capacity of 5001 and above situated above the double bottom, shall be fitted with a cock or valve directly on the tank capable of being closed from a safe position outside the space in which such tanks are situated. PSCO observed a wooden block placed in the MGO Service Tank (F-103V) fuel valve preventing the closing in the event of emergency. Chief Engineer stated the valves in the G/E Group were tested on 31 DEC 2023 and the block for valve F-103V was not removed after testing. SOLAS (2020) II-2/4.2.2.3.4 40ac
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 August 2024
Resolution: Fuel valves were observed to be unobstructed and in good working order.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 3 January 2024
Resolved
The company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel. PSCO observed ships procedures indicated that valves should be reset to the original position after test. PSCO requests an internal audit addressing the testing of remote fuel valves. SOLAS (2020) IX/3.1 and ISM CODE (2018) 7 40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 August 2024
Resolution: Internal audit inspected and found satisfactory.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 3 January 2024
Resolved
Oil filtering equipment referred to in paragraph 2 of this regulation shall comply with the paragraph 6 of this regulation. In addition, it shall be provided with alarm arrangements to indicate when this level cannot be maintained. The system shall also be provided with arrangements to ensure that any discharge of oily mixtures is automatically stopped when the oil content of the effluent exceeds 15 parts per million. In considering the design of such equipment and approvals, the Administration shall have regard to the specification recommended by the Organization. PSCO observed that during an operation of the Oily Water Separator on 10 AUG 2023 from 09:39L/T to 11:39L/T, as logged in the Oil Record Book, approximately 11.8 m3 of water was processed through the system and discharged overboard. The maximum throughput of the Oily Water Separator as stated on the IOPP Form A is 5 m3 per hour, therefore calling into question the validity of the throughput of the Oily Water Separator. MARPOL 73/78 (2022) Annex I/14.7 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 August 2024
Resolution: ORB was inspected dating back to time of deficiency noted and found to be in compliance with regulation.