GEORGIA S is a 2011 freight ship. The Coast Guard has recorded 11 inspections since 2016, most recently in March 2025, along with 4 deficiencies and 2 operational controls.
Records from 2016 to 2025. Most recent: operational control imposed, 28 March 2025.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it41101 - Convention (Subpart B), Gross Ton 25643 - Convention (Subpart B), Net Ton 75081 - Dead Weight, Metric Ton 88800 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 11
28 March 2025Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8101615
26 March 2025Administrative Inspection · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8094881
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 March 2025Resolved
The machinery, boilers and other pressure vessel's associated piping systems and fittings shall be of design and construction for the service for which they are intended. PSCO observed excessive leakage of jacket water M/e cylinder #3. SOLAS 74 (CONS) II-1/26.1, PTM code 60 AC.
Condition: Design Flaw
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 March 2025
Resolution: Recieved class report attesting to the satisfactory repair and operation of the M/E No.3 cylinder.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 26 March 2025Resolved
Firefighting systems and appliances shall be kept in good working order and ready for immediate use. PSCO observed the solenoid valve disconnected from electrical supply for #1 A/E for the local water mist system. SOLAS 74 (CONS) II-2/14.2.1.2, Rectified, 10C
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 26 March 2025
Resolution: PSCO observed crew reinstall and secure electrical power to solenoid valve for #1 AE water mist system.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 8 September 2021Resolved
11110-Each liferaft or group of liferafts shall be stowed with a float-free arrangement complying with the requirements of paragraph 4.1.6 of the Code so that each floats free. PSCO observed starboard side liferaft was not properly connected to the weak link on the hydrostatic release preventing a float-free arrangement. 74 SOLAS (20) III/13.4.2-10c
Action required: 10 - Deficiency Rectified
Due 8 September 2021
Resolved 8 September 2021
Resolution: Crew corrected the liferaft's float-free arrangement prior to the end of the exam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 June 2021Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids. PSCO observed fuel leaks on the #3,4,5 main engine cylinders.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 June 2021
Resolution: Received, reviewed and accepted class report from BV stating crew cleaned fuel pump shock absorbers on all cylinders.Main engine test was conducted and no additional leaks were found.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.