Records from 2012 to 2014. Most recent: inspection, 28 May 2014.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Fire Fighting › Fire Hydrants › Condition
Issued 3 February 2012
Resolved
Arrange fire main to comply with SOLAS II-2 reg 10.2.1.1 with respect to allowing a means to drain the fire to avoid freezing.
Due 3 March 2012
Resolved 8 February 2012
Resolution: Email by the master to verify completion.
Fire Fighting › Portable Foam Applicators › General
Issued 3 February 2012
Resolved
Provide adequate portable foam extinguishers in engineering space to comply with SOLAS II-2 reg 10.5.2.2.
Due 3 March 2012
Resolved 5 February 2012
Resolution: Email by the master to verify completion.
Documentation › Certificates/Documents › Stability Letter
Issued 3 February 2012
Resolved
Post stability letter on bridge.
Due 3 March 2012
Resolved 24 April 2012
Resolution: Email by the master clears this item.
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 3 February 2012
Resolved
Provide oil transfer procedures in accordance with 33CFR155.720 and 750.
Due 3 March 2012
Resolved 8 May 2012
Resolution: Cleared by email from the Master.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 3 February 2012
Resolved
Remove legacy oil containment drums from the vessel.
Due 3 March 2012
Resolved 5 February 2012
Resolution: Master''s email clears this item.
Documentation › Logs/Records › Logbook (official)
Issued 3 February 2012
Resolved
Prove proper use of official log book and ORB iaw 46CFR14.303 and 36USC10318.
Due 3 March 2012
Resolved 24 April 2012
Resolution: Master''s email clears this item.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 3 February 2012
Resolved
Complete DAPI audit forms provided IAW 46CFR16.
Due 3 March 2012
Resolved 1 March 2012
Resolution: Master''s email with document clears this item.
Navigation › Collision/Grounding Avoidance › Searchlight
Issued 3 February 2012
Resolved
Prove operation of spotlights on pilot house.
Due 3 March 2012
Resolved 6 February 2012
Resolution: Master''''s email clears this item.
Documentation › Certificates/Documents › Safety Management Certificate (ISM)
Issued 3 February 2012
Resolved
Provide a copy of valid ISM Safety Management Certificate.
Due 3 March 2012
Resolved 6 February 2012
Resolution: Master''s email and proof of cert. onboard.
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 3 February 2012
Resolved
Provide enclosure in engineering space for propellants or remove same to paint locker.
Due 3 March 2012
Resolved 24 April 2012
Resolution: Email from the master clears this item.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 3 February 2012
Resolved
Provide manufacturer recommended maintenance procedure for of Thermal Fluid Heater safeties.
Due 3 March 2012
Resolved 26 April 2012
Resolution: Master''s email clears this item.
Communications › Audible Communications › SPD (Other)
Issued 3 February 2012
Resolved
Repair Sound Powered Phone station in engine room.
Due 3 March 2012
Resolved 6 February 2012
Resolution: Cleared via email from Master.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 3 February 2012
Resolved
Provide tide tables, current tables, and rules of the road.
Due 3 March 2012
Resolved 6 February 2012
Resolution: Cleared via email from Master.
Navigation › Piloting/Steering › Compass Deviation Table
Issued 3 February 2012
Resolved
Provide updated compass deviation table iaw 33CFR164.35(c).
Due 3 March 2012
Resolved 29 February 2012
Resolution: Master''s email clears this item.
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 3 February 2012
Resolved
Provide emergency instructions on the GMDSS table as required by SOLAS and CFR's.
Due 3 March 2012
Resolved 6 February 2012
Resolution: Master''s email clears this item.
Communications › Radio Communications › EPIRB
Issued 3 February 2012
Resolved
Provide EPIRB registration, sticker, marking.
Due 3 March 2012
Resolved 3 February 2012
Resolution: Master''s email clears this item.
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 3 February 2012
Resolved
Prove proper operation toilet in hospital space.
Due 3 March 2012
Resolved 3 February 2012
Resolution: Cleared by master''s email.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 3 February 2012
Resolved
Inventory engineering manuals and provide in the language of the crew.
Due 3 March 2012
Resolved 8 May 2012
Resolution: Cleared via email from master.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 3 February 2012
Resolved
Provide a non-slip surface in aft steering.
Due 3 March 2012
Resolved 24 April 2012
Resolution: Cleared via email from master.
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers › Location
Issued 3 February 2012
Resolved
Provide wheeled foam fire extinguishers in Deck D Safety Store in accordance with Fire Control and Safety Plan (2 x 45L and 2 x 135L)
Due 3 March 2012
Resolved 8 May 2012
Resolution: Clerared via email from master.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 3 February 2012
Resolved
Repair emergency lighting for lifeboat embarkation deck.
Due 3 March 2012
Resolved 3 February 2012
Resolution: Cleared via email by master.
Lifesaving › Lifeboat › Hull
Issued 3 February 2012
Resolved
Repair gel coat chips on free fall lifeboat.
Due 3 March 2012
Resolved 8 May 2012
Resolution: Cleared via email from master.
Lifesaving › Launching Appliances › Davit
Issued 3 February 2012
Resolved
Provide davit launching instructions at the davit lauch life boat station that can be observed by davit operator iaw LSA Code.
Due 3 March 2012
Resolved 5 February 2012
Resolution: Cleared via email from masters.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 3 February 2012
Resolved
Ensure that floating lights are properly attached to liferings and iaw LSA Code.
Due 3 March 2012
Resolved 24 April 2012
Resolution: Cleared via master''s email.
Fire Fighting › Fire Main › Pressure
Issued 3 February 2012
Resolved
Prior to shifting berth prove that each fire pump can provide sufficient pressure at the most distant and highest fire stations relative to the the respective fire pump in the presence of GL surveyor.
Due 6 February 2012
Resolved 6 February 2012
Resolution: Cleared via conversation with the Master and email from the GL surveyor.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 3 February 2012
Resolved
Indicate actual stowage locations of immersion suits on Fire Control and Safety Plan.
Due 3 March 2012
Resolved 5 February 2012
Resolution: Cleared via email from master.
Documentation › Markings/Placards › Lifejacket Placard
Issued 3 February 2012
Resolved
Provide proper markings indicating immersion suit stowage.
Due 3 March 2012
Resolved 5 February 2012
Resolution: Cleared via email from master.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 3 February 2012
Resolved
Update Fire Control and Safety Plan to indicate the following:
1. wheeled foam fire extinguisher located in the incinerator room.
2. Foam eductor located in the boiler room
3. EEBD located in B Deck passageway
Due 3 March 2012
Resolved 5 February 2012
Resolution: Cleared via email from master.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 3 February 2012
Resolved
Provide Fire Control and Safety Plan in Engine Control Room as indicated on Fire Control and Safety Plan.
Due 3 March 2012
Resolved 24 April 2012
Resolution: Cleared via email from master.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 3 February 2012
Resolved
Remove hold back on the door from stair to rope store on main deck.
Due 3 March 2012
Resolved 5 February 2012
Resolution: Cleared via email from master.
Fire Fighting › Means of Escape › Blocked
Issued 3 February 2012
Resolved
Prove proper operation of emergency escape hatch from emergency generator room.
Due 3 March 2012
Resolved 6 February 2012
Resolution: Cleared via email from master.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 3 February 2012
Resolved
Door from stair to poop deck does not properly latch.
Due 3 March 2012
Resolved 5 February 2012
Resolution: Cleared from master''s email.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 3 February 2012
Resolved
Door leading from stair to emergency generator room does not latch properly.
Due 3 March 2012
Resolved 5 February 2012
Resolution: Cleared via master''s email.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 3 February 2012
Resolved
Revise Fire Control and Safety Plan and resubmit for approval.
Due 3 March 2012
Resolved 8 May 2012
Resolution: Cleared via email from master.
Documentation › Certificates/Documents › Engine IAPP Certificate
Issued 3 February 2012
Resolved
Upon receipt of EIAPP documentation from EPA inform [name withheld] for attendance and audit to issue a full term IAPP Certificate. This item is to be completed with in 90 days.
Due 3 May 2012
Resolved 9 March 2013