Records from 2014 to 2019. Most recent: inspection, 25 August 2019.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 4
25 August 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6792506
7 September 2016
Deficiency Check · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5994405
29 August 2016
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5979927
4 March 2014
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4810228
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 29 August 2016
Resolved
1020 - Fire Alarm - The detection system shall initiate audible and visual alarms distinct in both respects from the alarms of any other system not indicating fire. Eight alarm panels did not indicate either audible or visual fire alarms when smoke detectors tested. - 74 SOLAS (04) II-2/7.4.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 September 2016
Resolution: Vessel's class report attests to repair.
Engineering › Diesel Engine (auxiliary) › Emergency shutdown
Issued 29 August 2016
Resolved
1430 - Auxillary Engines - In multi-engine installations which are supplied from the same fuel source, means of isolating the fuel supply and spill piping to individual engines shall be provided. No. 1 Auxillary generator fuel remote shut off was circumvented via a bolt inserted that would not allow it to operate in the event of an emergency. - 74 SOLAS (04) II-2/4.2.2.5.5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 September 2016
Resolution: Vessel's class report attests to repair.
Fire Fighting › Combustible Materials › Linings
Issued 29 August 2016
Resolved
0750 - Fire Prevention - means shall be provided to control leaks of flammable liquids. No. 2 cylinder fuel oil injector pump heavily leaking fuel oil. - 74 SOLAS (04) II-2/4.1.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 September 2016
Resolution: Vessel's class report attests to repair.
Fire Fighting › Combustible Materials › Linings
Issued 29 August 2016
Resolved
0750 - Fire Prevention - means shall be provided to control leaks of flammable liquids. No. 2 boiler fuel transfer pump seal heavily leaking fuel oil. - 74 SOLAS (04) II-2/4.1.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 September 2016
Resolution: Vessel's class report attests to repair.
Fire Fighting › Combustible Materials › Linings
Issued 29 August 2016
Resolved
0750 - Fire Prevention - means shall be provided to control leaks of flammable liquids. Cycle oil head tank mixing line flange heavily leaking fuel oil. - 74 SOLAS (04) II-2/4.1.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 September 2016
Resolution: Vessel's class report attests to repair.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 4 March 2014
Resolved
THE MAINTENANCE PLAN SHALL BE KEPT ON BOARD THE SHIP AND SHALL BE AVAILABLE FOR INSPECTION WHENEVER REQUIRED BY THE ADMINISTRATION. CREW COULD NOT PROVIDE MANUAL FOR FIRE FIGHTING EQUIPMENT MAINTENANCE
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2014
Resolution: Class Society, ABS, provided class report after attending vessel and providing it with a new manual.
Fire Fighting › Self-contained Breathing Apparatus › Approval
Issued 4 March 2014
Resolved
THE COMPANY SHOULD ENSURE THAT ALL PERSONNEL INVOLVED IN THE COMPANY'S SAFETY MANAGEMENT SYSTEM HAVE AN ADEQUATE UNDERSTANDING OF RELEVANT RULES, REGULATIONS, CODES, AND GUIDELINES. FIRE FIGHTING EQUIPMENT (SCBA'S) FOUND WITH NO DOCUMENTATION ATTESTING TO OPERATTIAL READINESS
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2014
Resolution: Class society provided report that FPS attended the vessel and serviced 3 breathing apparatus. Vessel has obtained necessary documentation.