Records from 2016 to 2026. Most recent: inspection, 31 July 2026.
Inspection history · 6
31 July 2026
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8451224
23 April 2025
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8117783
23 April 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8117943
15 October 2021
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7320210
2 March 2017
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6095296
1 February 2016
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5807224
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 October 2021
Resolved
07109 - FIXED FIRE EXTINGUISHING INSTALLATION - CARGO SPACES ON CARGO SHIPS OF 2000 GT AND UPWARDS SHALL BE PROTECTED BY A FIXED CARBON DIOXIDE... FIRE EXTINGUISHING SYSTEM COMPLYING WITH THE... FSS CODE. THE PIPING FOR THE DISTRIBUITION OF FIRE EXTINGUISHING MEDIUM SHALL BE ARRANGED... AND SO POSITIONED THAT A UNIFORM DISTRIBUTION OF THE FIRE EXTINGUISHING MEDIUM IS OBTAINED. PSCO IDENTIFIED HOLED CO2 PIPING ON AFT PORT SIDE OF #2 CARGO HOLD, PREVENTING UNIFORM DISTRIBUITION OF CARBON DIOXIDE.
74SOLAS(09)II-2/10.7.1.3
FSS CODE 5.2.1.2.1
17AC
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 15 October 2021
Resolved 20 October 2021
Resolution: Received, reviewed and accepted class report from DNV stating the deficiency was rectified. Crew removed section of piping and welded in new pipe, as verified by class surveyor.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 15 October 2021
Resolved
07117 - JACKETED HIGH PRESSURE LINES AND OIL LEAKAGE ALARM - EXTERNAL HIGH PRESSURE FUEL DELIVERY LINES BETWEEN THE HIGH PRESSURE FUEL PUMPS AND FUEL INJECTORS SHALL BE PROTECTED WITH A JACKETED PIPING SYSTEM CAPABLE OF CONTAINING FUEL FROM A HIGH PRESSURE LINE FAILURE. PSCO OBSERVED MODIFIED JACKETING ON MDE NO.2 CYLINDER HIGH PRESSSURE FUEL LINE.
74SOLAS(09)II-2/4.2.2.5.2 - 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2021
Resolved 20 October 2021
Resolution: Received, reviewed and accepted class report from DNV stating the deficiency was rectified. Proper insulation was installed on the MDE No. 2 cylinder high pressure fuel line.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 15 October 2021
Resolved
14199 - OTHER - AFTER ANY SURVEY OF THIS SHIP.. NO CHANGE SHALL BE MADE IN THE STRUCTURE, EQUIPMENT, SYSTEMS, FITTINGS, ARRANGEMENTS OR MATERIAL... WITHOUT THE SANCTION OF THE ADMINISTRATION. PSCO OBSERVED MODIFIED BILGE SEPARATOR NAME PLATE WITH EQUIPMENT SPECS. PERMANENTLY REMOVED.
MARPOL I/6.4.2 - 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2021
Resolved 20 October 2021
Resolution: Received, reviewed and accepted class report from DNV stating the deficiency was rectified. Class surveyor verified name plate was legible and accurate.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 15 October 2021
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 10 - Deficiency Rectified
Resolved 28 October 2021
Resolution: Crew removed modified hose.
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 1 February 2016
Resolved
74SOLAS (2014 CONS) CH II-2 REG 10.1.1 FSS CH 3.2.1.1.1 17ac Fire fighter's outfit shall comply with the Fire Safety Systems Code. Personal equipment shall consist of the following: protective clothing of material to protect the skin from heat radiating from the fire and from burns and scalding by steam. The outer surface shall be water-resistant. SEE NARRATIVE FOR ADDITIONAL INFORMATION
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 February 2016
Resolution: VESSEL RECIEVED NEW FIREFIGHTING OUTFITS.