← All vessels
UNISON POWER
UNISON POWER is a 2012 freight ship. The Coast Guard has recorded 8 inspections since 2014, most recently in March 2022, along with 13 deficiencies and 2 operational controls.
Records from 2014 to 2022. Most recent: inspection, 25 March 2022.
- Built
- 2012
- Last inspected
- 25 March 2022
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 13 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9579406 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
3FDD2
1166603
Flag
HONG KONG
—
Maury page id
psix-1166603
Inspections, by type
Years with a record
5 calendar years (2014–2022)
The 8 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it24735 - Convention (Subpart B), Gross Ton
12342 - Convention (Subpart B), Net Ton
47128 - Displacement, Metric Ton
38145 - Dead Weight, Metric Ton
12342 - Convention (Subpart B), Net Ton
47128 - Displacement, Metric Ton
38145 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 8
25 March 2022
Administrative Inspection · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7418368
14 July 2020
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7005922
14 July 2020
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7006306
10 July 2020
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6992895
31 May 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6144609
5 June 2016
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5898010
19 April 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5857661
6 August 2014
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4946389
Deficiency record · 13
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 25 March 2022
Resolved
AFTER ANY SUVEY OF THE SHIP UNDER ARTICLE 14 HAS BEEN COMPELTED, NO CHANGE SHALL BE MADE IN THE STRUCTURE, EQUIPMENT, ARRANGEMENTS, MATERIAL OR SCANTLINGS COVERED BY THE SURVEY, WITHOUT THE SANCTION OF THE ADMINISTRATION.
PSCO OBSERVED CREW FABRICATION OF GUARDRAIL AFTER SUSTAINING DAMAGE AT SEA. PROVIDE CLASS REPORT ATTESTING TO THE ADEQUACY OF WELD REPAIR ON GUARDRAIL ADJACENET TO CARGO HOLD #1, STARBOARD SIDE.
ICLL (88 PROT) ARTICLE 15
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 July 2020
Resolved
For maintaining and monitoring the effectiveness of the fire safety measures the ship is required with, the following functional requirements shall be met: fire protection systems and firefighting systems shall be maintained ready for use.
PSCO observed rags stuffed into all of the sprinkler heads of the fixed water sprinkling firefighting system in the paint locker, rendering the system inoperable and unable to comply with intended use. Additionally, PSCO observed flammable liquids stowed above the sprinkler heads, out of protection of the fixed firefighting system. 74SOLAS(2009)II-2/14.1.1
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 July 2020
Resolved
For maintaining and monitoring the effectiveness of the fire safety measures the ship is required with, the following functional requirements shall be met: fire protection systems and firefighting systems shall be maintained ready for use.
PSCO observed a fixed carbon dioxide firefighting system nozzle in the lower level of the engine room was clogged and unable to comply with its intended use, rendering the space nearest the crankcase of the slow-speed diesel engine without adequate carbon dioxide extinguishing agent in event of activation. 74SOLAS(2009)II-2/14.1.1
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 10 July 2020
Resolved
Means shall be provided to control leaks of flammable liquids and ignition sources shall be separated from combustible materials and flammable liquids.
PSCO observed insufficiently clean engine room: excessive amount of oily-water mixture in bilge rendering one high level alarm inoperable, large number of oily rags tossed throughout including on fuel oil pumps & main engine cylinder tops, improperly stowed & unlabeled chemicals placed on the deck or adjacent to a heat source, and open containers of oil were observed haphazardly arranged throughout the engine room, including near running engines and areas of high heat.
74SOLAS(2009)II-2/4.1.1 & 4.1.5
10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 10 July 2020
Resolved
The administration shall be satisfied that adequate arrangements are in place to ensure that the performance of the equipment required by this chapter is maintained.
PSCO observed Voyage Data Recorder was exhibiting an "abnormal" message. Crew was unable to explain the reason for the abnormal condition or demonstrate proper operation to the PSCO. 74SOLAS(2014)V/16.1
Operations/Management › Drills/Instruction › Abandon Ship
Issued 31 May 2017
Resolved
2025 - Abandon Ship Drills - at least once every three months during an abandon ship drill the crew board the lifeboat. Rescue boats other than lifeboats which are also rescue boats shall be launched every month. Crew falsified records stating that they launched both life boat and rescue boat when no launches occured. 74 SOLAS (14) III/19.3.4.4 & 19.3.4.6 30ac
Operations/Management › Drills/Instruction › Abandon Ship
Issued 31 May 2017
Resolved
2540 - Emergency Preparedness - The Company should establish programmes for drills and exercises to prepare for emergency actions. Although schedules/check sheets for exercises have been established in the Safety Management System, the Master failed to implement established schedules. 74 SOLAS (14) IX-5 ISM Code A 8.2 30ac
Navigation › Piloting/Steering › Gryo Compass Repeater
Issued 31 May 2017
Resolved
1540 - Gyro Compass - A gyro-compass heading repeater, or other means, to supply heading information visually at the emergency steering position if provided. PSCO observed that the gyro-compass repeaters on the bridge wings and steering gear were off by 10-20 degrees. 74 SOLAS (14) V/19.2.5.2 16a
Fire Fighting › Ventilation Systems › Fans
Issued 19 April 2016
Resolved
9900 - Other Not Clearly Hazardous - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed fan for ventilation in the CO2 room was not able to run continuously.
74 SOLAS (14) CH I / 11 17a
Lifesaving › Launching Appliances › Davit
Issued 19 April 2016
Resolved
0615- rescue boats- All life saving appliances shall be in working order and ready for immediate use. PSCO observed that the crew was not able to demonstrate lowering and recovery of the rescue boat using the hydraulic unit. 74 SOLAS (14) Ch III / 20.2 17a
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 19 April 2016
Resolved
1730-Oily water seperating equipment- Oil filtering equipment referred to in paragraph 2 of this regulation shall comply with paragraph 6 of this regulation. Crew was unable to demonstrate the proper operation of the oily water separator. MARPOL Annex I / 14.7 17a
Engineering › Steam Boiler (propulsion) › Fan Motor
Issued 19 April 2016
Resolved
0830-Pipes wire (insul) accident prev- The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed boiler had exposed wires and a new motor for the blower was installed. 74 SOLAS (14) Ch I / 11 16a
Engineering › Lubricating Oil Storage/Transfer System › Gauge
Issued 19 April 2016
Resolved
0999- Other (safety in general)- The condition of the ship and its equipment shall be maintained to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed that the sight glass for the lube oil tank for the tail shaft was gagged open. 74 SOLAS (14) Ch I / 11 10c
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.