← All vessels
CYAN NOVA
CYAN NOVA is a 2011 tank ship. The Coast Guard has recorded 5 inspections since 2021, most recently in February 2025, along with 4 deficiencies.
Records from 2021 to 2025. Most recent: inspection, 23 February 2025.
- Built
- 2011
- Last inspected
- 23 February 2025
- Documentation
- Not in the documentation file of 10 August 2026
- Deficiencies
- 4 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9534004
D5YW9
1167531
Flag
SINGAPORE
Maury page id
psix-1167531
Inspections, by type
The 5 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Documentation record
Tonnage as PSIX records it164580 - Convention (Subpart B), Gross Ton
132497 - Regulatory (Subpart C or D), Gross Ton
366533 - Displacement, Ton
318663 - Dead Weight, Ton
108314 - Convention (Subpart B), Net Ton
132497 - Regulatory (Subpart C or D), Gross Ton
366533 - Displacement, Ton
318663 - Dead Weight, Ton
108314 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 5
23 February 2025
COC-TVE Annual
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8077267
1 January 2024
PSC B · COC-TVE Renew
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7841085
29 January 2023
COC-TVE Annual · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7621906
29 November 2021
COC-TVE Renew · PSC B · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7353604
18 November 2021
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7353608
Deficiency record · 4
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 January 2023
Resolved
Where cables are installed in hazardous areas introduce the risk of fire or explosion in the event of an electrical fault in such areas, special precautions against such risks shall be taken to the satisfaction of the Administration. PSCO observed multiple light fixtures with loose wiring in cable glands. Additionally, 01 light fixture was found to have a cracked lens/cover and 02 light fixtures missing gas-tight clamps.
74 SOLAS 20 Ch. II-1 / Reg. 45.5.4
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 November 2021
Resolved
Where cables which are installed in hazardous areas introduce the risk of fire or explosion in the event of an electrical fault un such areas, special precautions against such risks shall be taken to the satisfaction of the administration. PSCO found multiple electrical deficiencies in the cargo pump room. Temperature sensors on the #1 ballast pump and #3 cargo oil pump were found to have exposed wiring. Multiple lighting fixtures in the cargo pump room were found to have exposed electrical wiring. Electrical cabling along the cargo pump room bulkhead had exposed wiring due to nicks or cuts in cable insulation.
74 SOLAS (14) II-1/45.5.4
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 29 November 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulation to ensure that ship in all respects will remain fit to proceed to sea without danger to the ship or persons aboard. PSCO discovered a large steam leak in the steam piping near accommodation entrance within the engine room.
74 SOLAS (14) I/11
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 29 November 2021
Resolved
Fire fighting protection systems and fire-fighting systems and appliances shall be maintained ready for use. Ship's crew was unable to deliver sufficient quantity of water to foam line for demonstration of foam monitor usage.
74 SOLAS (14) II-2/14.1.1
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.