Records from 2016 to 2025. Most recent: inspection, 18 April 2025.
Inspection history · 23
18 April 2025
Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8113939
24 June 2024
Internal Structural Exam · Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7939804
4 April 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8101605
26 June 2023
Deficiency Check · Internal Structural Exam · Administrative Inspection · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7721754
1 March 2023
Liferaft Servicing
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7656514
1 September 2022
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7549280
22 April 2022
Deficiency Check · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7436041
11 April 2022
Hull Examination · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7429571
9 August 2021
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7281576
19 April 2021
Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7178620
7 July 2020
Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6999541
9 October 2019
Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6831582
27 September 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6822752
17 September 2019
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6814453
21 August 2019
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6792017
16 May 2019
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6688723
16 May 2019
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6703546
5 March 2019
Annual Inspection · DAPI Audit · Hull Examination · Deficiency Check · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6636888
24 April 2018
Internal Structural Exam · Annual Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6398389
2 October 2017
Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6280643
18 April 2017
Administrative Inspection · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6111261
12 May 2016
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5879101
15 January 2016
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5798412
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 April 2025
Resolved
Each battery must be located as high above the bilge as practicable, secured to protect against shifting with the roll and pitch of the vessel. Secure midship battery with provided strap, secure port side battery lid with provided hardware.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 April 2025
Resolution: Batteries secured
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 April 2025
Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. Cover open switch location on distribution panel in head to prevent accidental contact with energized wiring.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 April 2025
Resolution: Rectified to the satisfaction of attending marine inspector
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 June 2024
Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level in a machinery space bilge. Machinery space bilge high level alarm inop.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 June 2024
Resolution: High level bilge alarm float switch replace and demonstrated to the satisfaction of the attending marine inspector.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 24 June 2024
Resolved
The owner shall provide satisfactory evidence of required servicing by a qualified servicing facility. Vessel did not have current annual servicing certificate for fixed fire fighting system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2024
Resolution: Annual servicing report provided and reviewed; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 24 June 2024
Resolved
Each inflatable lifesaving appliance must be servided within 12 months of its initioal packing and within 12 months of each subsequent servicing. Provide current servicing report for liferaft.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 June 2024
Resolution: Liferaft servicing report provided; all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 June 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to minimixe accudental personnel contact with energized parts. Properly dead-end wiring on bulkhead aft of center Diesel engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 June 2024
Resolution: Attended and veirified proper securing of dead end wires.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 24 June 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Install chaffing gear on flexible fuel hoses in machinery space.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 June 2024
Resolution: Chaffin gear added; all sat.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 24 June 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Install chaffing gear on raw water hose on center MDE.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 June 2024
Resolution: Chaffin gear added; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2024
Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. DC panel in head is not properly protected. Properly blank open space on DC panel.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 June 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2024
Resolved
Each battery must be secured to protect against shifting with the roll and pitch of the vessel. Properly secure center MDE battery.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 June 2024
Resolution: Strap on battery installed; all sat.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 24 June 2024
Resolved
A vessel must carry a first-aid kit approved under 46 CFR 160.041 or ISO 18813:2006 (E) paragraph 4.12. First aid kit does not meet inventory or expiry-dated requirements.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 June 2024
Resolution: First aid kid updated to reflect new standard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 June 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to protech from machinery failure and personnel injury. Center main diesel engine cooling water pump housing leaking. Repair water pump housing leak.
Action required: 10 - Deficiency Rectified
Resolved 24 June 2024
Resolution: Rectified during inspection.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 26 June 2023
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. Original COD was kept in the office and a copy was kept onboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2023
Resolved 10 July 2023
Resolution: Original COD onboard.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 26 June 2023
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Vent covers were available for use, however, full closure could not be made because there was a lack of velcro on all sides of the vent opening. Install velcro on all four sides of the vent opening to allow for proper closure.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2023
Resolved 10 July 2023
Resolution: Velcro re-installed. Vent covers allowed for full closure.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 26 June 2023
Resolved
The owner or managing operator or a qualified servicing facility must conduct the following inspections: portable extinguishers must be inspected monthly required by NFPA. The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. Monthly inspections were not being completed on portable extinguishers. Conduct inspections and provide evidence to the CG MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2023
Resolved 10 July 2023
Resolution: Monthly inspections completed.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 26 June 2023
Resolved
The owner, charterer, master or managing operator shall instruct each crew member, upon first being employed and prior to getting underway for the first time on a particular vessel and at least once every three months, as to the duties that the crew member is expected to perform in an emergency. The training shall be logged or otherwise documented for review by the Coast Guard. Drill logs were provided, but crew training logs specific to emergency duties were not provided. Prepare and provide appropriate logs to the satisfaction of the CG MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2023
Resolved 10 July 2023
Resolution: Training logs provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 June 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Port side engine room battery selector switch terminal board missing cover over positive leads. Provide protection over positive leads to reduce shock hazard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2023
Resolved 10 July 2023
Resolution: Cover provided over positive leads.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 26 June 2023
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Potable water tank retaining strap is missing attaching hardware. Install proper hardware to prevent tank from shifting.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2023
Resolved 10 July 2023
Resolution: Hardware installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 June 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Properly terminate dead end wires found on MSD tank and in starboard aft amidship void red wire bundle.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2023
Resolved 12 July 2023
Resolution: Properly terminated wire.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 25 April 2022
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. The aft engine room ventilation cover was missing velcro and could not be closed. 46 CFR 182.465(h)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2022
Resolution: Witnessed vent closure.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 25 April 2022
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. Original COD was not on board. 46 CFR 67.313(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2022
Resolution: COD placed on board.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 25 April 2022
Resolved
A hatch exposed to the weather must be watertight. The aft portion of the deck surrounding the engine room
hatch appears to be leaking (approx 1 drop/sec) at the
stbd, aft most corner. 46 CFR 179.360
Action required: 705 - Other - as specified
Resolved 1 September 2022
Resolution: Operator re sealed all three bolted engine covers leak tested - all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 22 April 2022
Resolved
The marine employer must have a sufficient number of alcohol testing devices readily accessible on board the vessel to determine the presence of alcohol in the system of each individual who was directly involved in an SMI. No alcohol test strips on board. 46 CFR 4.06-15(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2022
Resolved 27 April 2022
Resolution: Alcohol test strips placed on board.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 11 April 2022
Resolved
A watertight hatch must be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent loss. The aft deck watertight hatches covers are loose and unhinged while open. Install captive chains or other device to prevent loss of the hatch cover. 46 CFR 179.360
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2022
Resolved 25 April 2022
Resolution: Proper device installed to prevent loss of hatch.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 9 August 2021
Resolved
Provide updated charts and nautical publications.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 August 2021
Resolved 18 August 2021
Resolution: Received email from vessel operator with pictures of new chart and pubs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 August 2021
Resolved
The automatic bilge pump in the #1 void is not operating in the automatic mode as designed. Repair/renew to original condition.
Condition: Unknown
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 August 2021
Resolved 25 August 2021
Resolution: Picture of installed bilge pump submitted for def check.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 17 September 2019
Resolved
Install guards on all rotating machinery in the engine room. All three main engines need the flywheels covered and both outboard main engines the drive shafts need covered.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 September 2019
Resolution: Vessel has installed Guards over all three flywheels and both outboard shafts.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 April 2019
Resolved
Replaced Expired Battery in Life ring buoy light prior to night or during low visibility .
Action required: 705 - Other - as specified
Resolved 1 May 2019
Resolution: Vessel has replaced expired battery.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 April 2019
Resolved
Correctly attached Life ring light/throwing line to life ring buoys
Action required: 10 - Deficiency Rectified
Resolved 1 May 2019
Resolution: Vessel correct throwing light/ light arrangement
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 30 April 2019
Resolved
Fix Anchor light prior to anchoring at night or during
low visibility
Action required: 705 - Other - as specified
Resolved 2 May 2019
Resolution: Vessel has fixed anchor light.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 30 April 2019
Resolved
Provide a written garbage management plan from the
company
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 May 2019
Resolution: Vessel has post company waste management plan
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 30 April 2019
Resolved
Display and distribution of a community service hot-
line telephone number for crewmember assistance.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 May 2019
Resolution: Vessel has posted local hotline numbers
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 24 April 2018
Resolved
The operator must secure the overboard discharge of a Type III sewage system in a manner which prevents discharge of sewage. The valve handle is not secured. 33 CFR 159.7(c)
Action required: 10 - Deficiency Rectified
Resolved 24 April 2018
Resolution: Verified handle was removed from the overboard discharge valve.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 24 April 2018
Resolved
Crew training and drills must be logged. 46 CFR 185.420(c)
Monthly EPIRB testing must be logged. 46 CFR 185.728(c)
Verify at next Annual.
Action required: 705 - Other - as specified
Due 8 August 2019
Resolved 30 April 2019
Resolution: Vessel has loged all drills and EPRIB testing for the last year and started the log for this year.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 April 2018
Resolved
All alcohol testing dvices for use during post-casualty testing must be currently listed on the Conforming Products List published by the National Highway Traffic Safety Administration.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 May 2018
Resolution: Verified compliant alcohol screening devices were provided.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 18 April 2017
Resolved
Restore covers for ventilation to machinery vents. Make provisions to stay in place, VELCRO was suggested. Three vents covers two forward P/S & one aft step. Photos will satisfy this requirement.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 24 April 2017
Resolution: New velcro straps insatlled, sat.
Fire Fighting › Fire Bucket › Quantity
Issued 12 May 2016
Resolved
Provide x3, 2.5 gallon fire buckets with line attached stenciled fire bucket. (missing one bucket)
Action required: 705 - Other - as specified
Due 26 May 2016
Resolved 13 May 2016
Resolution: Owner purchased a new fire bucket, attached line, and stenciled fire bucket onto the same -SAT.