Records from 2016 to 2026. Most recent: inspection, 25 April 2026.
Inspection history · 7
25 April 2026
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8355634
16 April 2026
COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8351084
24 January 2024
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7846493
20 February 2022
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7391868
1 June 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6421618
24 May 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6422594
10 November 2016
PII Safety Exam · ISPS II Exam · Deficiency Check · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6038215
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 January 2024
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be installed and protected as to reduce to a minimum any danager to the persons on board,due regard being paid to movng parts, hot surfaces and other hazards. PSCO observed damaged exhaust lagging on the # 1 generator. 74 SOLAS (2020) II-I/26.1 Code 50 ac.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 6 May 2024
Resolution: Installed exhaust lagging
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 20 February 2022
Resolved
07113 - Fire Pumps and its Pipes - The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO observed an active leak on the starboard side amidship expansion joint, as well as a secondary active leak on the fire main between cargo hatches 01 and 02 - 74 SOLAS (20) II-1 / 26.1 - 50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2022
Resolved 15 March 2022
Resolution: Received, reviewed, and accepted NKK class report attesting to repair of deficiencies. Expansion joint overhauled, sealing faces cleaned, and reassembled. Secondary leak caused by corrosion under U-clamp; damaged section of pipe renewed. Op-tested, sat.
Lifesaving › Rescue Boat › Propulsion Engine
Issued 10 November 2016
Resolved
0618: Rescue Boat shall be stowed in a state of continuous readiness. During repeated attempts at operational tests, the rescue boat outboard motor failed to run for more than 30 seconds. Additionally PSC observed excessive smoke and no cooling water output. 74SOLAS(14)III/14.1; 17c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 November 2016
Resolved 12 November 2016
Resolution: Rescue Boat motor successfully fixed. Motor runs satisfactory in compliance with 74SOLAS(14) III/14.1; 17c
Documentation › Logs/Records › Ballast Water Logs/Records
Issued 10 November 2016
Resolved
2510: Vessel must maintain a Ballast Water Management Plan that has been developed specifically for the vessel that will allow those responsible to understand and follow it. Vessel currently is not following or not documenting items in the Ballast Water Management Plan, 33CFR151.2050(g), MEPC Res., 207(62), 10C.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 November 2016
Resolved 10 November 2016
Resolution: Spoke with the [name withheld] and Chief Engineer about proper documentation of Ballast Water and Bio-Fouling Plans.