MAURY USCG vessel records Sign in
← All vessels

SOUTH LOYALTY

SOUTH LOYALTY is a 2011 tank ship. The Coast Guard has recorded 4 inspections since 2012, most recently in April 2026, along with 1 deficiency.

Records from 2012 to 2026. Most recent: inspection, 8 April 2026.

Built
2011
Last inspected
8 April 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9537769 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
V7A5672
1168572
Flag
MARSHALL ISLANDS
—
Maury page id
psix-1168572

Inspections, by type

Years with a record 4 calendar years (2012–2026)
The 4 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it164641 - Convention (Subpart B), Gross Ton
164641 - Regulatory (Subpart C or D), Gross Ton
110440 - Convention (Subpart B), Net Ton
110440 - Regulatory (Subpart C or D), Net Ton
314000 - Dead Weight, Ton
358735 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 4

8 April 2026 COE-Administrative
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8344706
18 August 2025 COC-TVE Renew · PSC B
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8212538
15 January 2017 ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6062884
7 June 2012 ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4335631

Deficiency record · 1

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Documentation-ISM
Issued 18 August 2025 Resolved
EVERY COMPANY SHOULD IMPLEMENT A SAFETY MANAGEMENT SYSTEM WHICH INCLUDES INSTRUCTUONS AND PROCEDURES ENSURE SAFE OPERATION OF SHIP. FIXED GAS SAMPLING WAS FOUND DISCONNECTED FROM BALLAST TANKS THAT WERE EMPTY, NOT FOLLOWING MANUFACTURER'S INSTRUCTIONS. 74SOLAS(24)IX/3.1 ISM CODE 1.4.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 20 August 2025
Resolved 20 August 2025
Resolution: IT WAS RECONNECTED ON THE SPOT

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.