GAS ALKHALEEJ is a 2008 tank ship. The Coast Guard has recorded 10 inspections since 2019, most recently in February 2026, along with 10 deficiencies and 1 operational control.
Records from 2019 to 2026. Most recent: inspection, 20 February 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
The counts in the strip above are the same counts; this table splits the inspections by
the kind of activity recorded. A blank resolution means none was recorded in this data; it
does not establish that a deficiency is outstanding. Years with a record are calendar
years in which a record exists, not years in service.
What Maury does not do.
Documentation record
Tonnage as PSIX records it47072 - Regulatory (Subpart C or D), Gross Ton 47072 - Convention (Subpart B), Gross Ton 15845 - Regulatory (Subpart C or D), Net Ton 54495 - Dead Weight, Ton 15845 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
What it gives that this page does not: the whole record in one
dated, citable document — every line with its Coast Guard activity id, the retrieval
date on the cover, built to print to PDF with its page breaks — that a surveyor can
attach and a lender can file. The same facts as this page, complete and in one file.
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
A request, not a checkout: leave an email and Maury replies once, with
the dated document for this hull and a Stripe invoice for $299. Nothing is charged before
the document is in your hands.
Used only to answer this request.
Not shared, not sold, and not added to a mailing list.
Inspection history · 10
20 February 2026COC-GAS Renew · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8313254
4 August 2024PSC B · COC-GAS Renew
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7973857
7 March 2023COC-GAS Renew · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7640021
9 November 2020COC-GAS Annual · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7090228
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 7 March 2023Resolved
EACH RELIEF VALVE MUST NOT BE SET FOR A HIGHER PRESSURE THAN THE MARVS. USCG PORT STATE CONTROL EXAMINER NOTED MISSING VALVE TAGS FOR #1 CARGO TANK MARVS. VESSEL COULD NOT PRODUCE THE TAGS AND COULD NOT PRODUCE THE MARV SET AND SEAL DOCUMENTATION FOR THE HARBOR SETTINGS (400 MBAR)
46 CFR 154.801(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2023
Resolved 10 March 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 February 2020Resolved
To discharge ballast water into the United States, the master owner, operator, agent or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030(a). Use an AMS as described in 151.2025(a) (3) or ballast with water from a U.S. public water system, according to the schedule in paragraph (b) of this subpart.
Subject vessel of a keel laid date 12FEB2008 with a ballast water capacity of 23714 cubic meters. Vessel was found past its compliance date per implementation schedule in 33CFR151.2035 (b). Vessels current ballast water management method is exchange and discharge, which is not authorized. Vessel has no BWTS installed.
Vessel is not authorized to discharge untreated ballast into U.S. waters.
This deficiency will not be cleared until CG examiners receive documentation that the vessel has installed a BWTS, has decided to use public water from the U.S. public water system or has updated its ballast water management plan to state that the vessels ballast water management method in U.S. water is no discharge. - 33CFR 151.2035
Condition: Invalid
Action required: 15 - Rectify deficiencies by next port
Resolved 3 March 2020
Resolution: Vessel provided extension of implementation schedule for approved ballast water management methods from USCG.
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 3 November 2019Resolved
A permanently installed system of gas detection and audible and visual alarms should be provided for other enclosed spaces in the cargo area where vapour may accumulate including hold spaces and interbarrier spaces for independent tanks other than type [13.6.7]. For spaces listed in 13.6.7, alarms should be activated for flammable products when the vapour concentration reaches 30% of the lower flammable limit [13.3.10].
When testing the fixed gas detection for the cargo tank hold spaces, crewmember supplied 50% LEL propane test gas directly to the catalytic gas sensor and the digital LEL readout stabilized at 24% LEL. Crewmembers then tried carrying out tests from different hold space sampling lines and internal gas cabinet sampling line with no successful LEL readings on the display.
74 SOLAS (14) VII/13.1
IGC (93) 13.6.7
IGC (93) 13.3.10
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Resolved 6 November 2019
Resolution: LR Class Report and confirmation of operation by USCG Sector Houston examiners
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 3 November 2019Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the acquisitions of the relevant rules and regulations and with any additional requirements which may be established by the company.
While carrying out tests of the cargo tank high pressure alarms, the crew did not use the appropriate hand pump [Yokogawa BT200] as required by ship's established SMS [Ship work order/requisition form No:3011893 dated 20-10-2019]. While testing, the crew seemed unfamiliar with how to use the test equipment and instead used a bottle with compressed nitrogen to carry out local tests.
74 SOLAS (14) IX/3.1
ISM Code 10.1
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Resolved 6 November 2019
Resolution: Based on ABS Audit report HS375585 dtd 5 Nov 2019 and issuance of Short-term Safety Management Certificate requiring response from company within 30 days and additional audit within 90 days.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 3 November 2019Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company.
The vessel documented deck water spray system testing and servicing on 07 Oct 2019 and 31 Oct 2019. While testing the deck water spray during the COC examination, PSCOs observed inadequate coverage over the number 2/3/4 cargo tank domes, port/starboard manifolds, forward of the compressor room and over the cargo booster pumps and vaporizer.
74 SOLAS (14) IX/3.1
ISM Code 10.1
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Resolved 6 November 2019
Resolution: Based on ABS Audit report HS375585 dtd 5 Nov 2019 and issuance of Short-term Safety Management Certificate requiring response from company within 30 days and additional audit within 90 days.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 3 November 2019Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provision of the relevant rules and regulations and with any additional requirements which may be established by the company.
When questioned about the ship's procedures for carrying out tests of the fixed gas detection, the ship's crew informed the PSCOs that there were no written procedures for carrying out tests. When asked to test the fixed gas detection, the crew was not following ship or manufacturer procedures.
74SOLAS(14)IX/3.1
ISM Code 10.1
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Resolved 6 November 2019
Resolution: Based on ABS Audit report HS375585 dtd 5 Nov 2019 and issuance of Short-term Safety Management Certificate requiring response from company within 30 days and additional audit within 90 days.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 November 2019Resolved
On ships carrying flammable or toxic products or both, a water-spray system for cooling, fire prevention and crew protection should be installed to cover: exposed cargo tank domes and any exposed parts of cargo tanks; exposed on-deck storage vessels for flammable or toxic products; [and,] cargo liquid and vapour discharge and loading manifolds and the area of their control valves and any other areas where essential control valves are situated and which should be at least equal to the area of the drip trays provided.
During a test of the Deck Water Spray, PSCOs observed inadequate coverage over the number 2/3/4 cargo tank domes, port/starboard manifolds, forward of the compressor room and over the cargo booster pumps and vaporizer.
74SOLAS(14) VII/13.1
IGC(93) 11.3.1
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Resolved 6 November 2019
Resolution: Review of LR Class report and verification by USCG Sector Housotn examiners.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 3 November 2019Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with any additional requirements which may be established by the company [10.1]. In meeting these requirements, the company should ensure that any non-conformity is reported [10.2.2] and appropriate corrective action is taken[10.2.3].
As detailed in defs #01, #02, #03, #04 and #5, objective evidence exists that the ship is not being maintained in conformity with the provisions of the relevant rules (IGC Code). PSCOs noted in review of the SMS procedures, testing of cargo control systems are contradicted by the condition of the systems observed by attending PSCOs.
74SOLAS(14)IX/3.1
ISM Code 10.1
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Resolved 6 November 2019
Resolution: Based on ABS Audit report HS375585 dtd 5 Nov 2019 and issuance of Short-term Safety Management Certificate requiring response from company within 30 days and additional audit within 90 days.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 3 November 2019Resolved
Emergency shutdown valves in liquid piping should fully close under all service conditions within 30 s of actuation. Information about the closing time of the valves and their operating characteristics should be available on board and the closing time should be verifiable and reproducible.
While testing the emergency shutdown at the port side manifold, the forward liquid line took 43 seconds to close.
74SOLAS(14) VII/13.1
IGC(93) 5.6.4
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 November 2019
Resolution: review of LR Class Report and verification by USCG Sector Houston examiners
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 November 2019Resolved
Electrical installations should be such as to minimize the risk of fire and explosion from flammable products.
PSCOs found flameproof deck lights on the #3 and #2 cargo tank dome that had broken/cracked lenses and broken latches, making the lights no longer fitted with explosion protection.
74SOLAS(14) VII/13.1
IGC(93) 10.1.2
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 November 2019
Resolution: Review of LR Class report and verification by USCG Sector Housotn examiners.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.