Records from 2012 to 2025. Most recent: inspection, 21 March 2025.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC PLANT 38 · MADISONVILLE, LA, UNITED STATES · built 2012
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 28 May 2026 · expires 30 June 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
21 March 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8097842
25 September 2023
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7798502
12 November 2022
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7593554
1 September 2022
Hull Examination · COI Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7548711
9 August 2022
Examination of Repairs · Internal Structural Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7528876
24 October 2018
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6631755
10 August 2017
MTSA Verification · Examination of Repairs · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6232982
24 January 2017
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6076396
22 December 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6061247
1 September 2016
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5997012
12 May 2015
Deficiency Check · Administrative Inspection · Periodic Inspection · MTSA Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5124082
15 May 2014
Administrative Inspection · Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4860004
2 July 2013
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4639589
13 August 2012
Damage Survey
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4409388
10 August 2012
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4423354
4 June 2012
Hull Examination · Initial Certification · Internal Structural Exam · Cargo Tank Internal · MTSA Verification · Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4357379
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 21 March 2025
Resolved
All tank vessels, the construction or conversion of which is started on or after July 1, 1951, shall conform to the requirements in this subpart in construction of hulls. Vessel reported collision on the starboard side, provide survey report attesting to structural integrity of affected cargo tanks and voids prior to loading cargo.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 March 2025
Resolution: Received surveyor report. No damage to barge
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 12 May 2015
Resolved
Hydro static test date on piping was stenciled with a 2016 date.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 June 2015
Resolved 15 June 2015
Resolution: Recieved email notification with photos identifying that the hydr date had been stenciled with correct date.