Records from 2014 to 2025. Most recent: inspection, 17 December 2025.
Documentation record
Registered dimensions (L × B × D)184.3 ft × 48.0 ft × 16.0 ft
Registered tonnagegross 99 / net 67
ITC dimensions (L × B × D)184.3 ft × 48.0 ft × 16.0 ft
ITC tonnagegross 1,158 / net 347
BuilderMASTER BOAT BUILDERS INC · CODEN, AL, UNITED STATES · built 2013
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 17 August 2026 · expires 31 August 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1158 - Convention (Subpart B), Gross Ton
99 - Regulatory (Subpart C or D), Gross Ton
347 - Convention (Subpart B), Net Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 24
17 December 2025
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8284809
16 December 2025
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8275608
12 December 2025
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8283571
20 December 2024
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8049601
5 October 2023
COI Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7798936
30 August 2023
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7778338
21 December 2022
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7611673
28 September 2021
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7321991
8 September 2021
Drydock Extension
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7307658
29 December 2020
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7117273
6 December 2019
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6868990
26 October 2019
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6846388
18 June 2019
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6717528
25 October 2018
Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6596382
28 September 2018
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6565775
10 September 2018
Administrative Inspection · Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6536725
24 October 2017
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6293855
20 October 2016
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6026644
2 August 2016
Internal Structural Exam · Administrative Inspection · Hull Examination · Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5960807
7 December 2015
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5776921
14 October 2014
Type not recorded
No type recorded · Station Lake Charles · USCG Heartland District (CGD-H) · Activity 5005414
11 August 2014
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4948101
6 August 2014
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4946279
25 March 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4822884
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 17 December 2025
Resolved
Except as otherwise provided in this section, on a documented vessel, each unlicensed seaman must be: a citizen of the US, an alien lawfully admitted to the US for permanent residence; or a foreign national who is enrolled in the US MMA; and not more than 25% of the total number of unlicensed seamen on the vessel may be alien lawfully admitted to the US for permanent residence. Vessel had a foreign national without being a permanent residence working as a rigger.
17 - Vessel may not depart Port Fourchon until all persons onboard are either US Citizen or lawfully admitted to the US for permanent residence IAW 46 USC 8103.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 December 2025
Resolution: Individual was removed from vessel.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 15 December 2025
Resolved
Each vessel subject to load line requirements shall carry on board a valid certificate attesting to compliance with such requirements. Vessel has an overdue load line survey with the 90 days window expiring after 10DEC2025. Vessel canceled the scheduled survey for 15DEC2025 and proceeded beyond the boundary line. Vessel shall return to port immediately and not depart Port Fourchon until survey successfully completed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 December 2025
Resolution: Vessel had required survey and ILLC was endorsed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 21 December 2022
Resolved
Each vessel with watertight doors must be made watertight. Watertight doors in engine room were not watertight. Emergency escape hatch, aft dog cup was wasted. Make engine watertight doors watertight and make weld repairs to emergency escape hatch dog cup.
46 CFR 174.210(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 21 December 2022
Resolved 22 December 2022
Resolution: Repairs were verified by MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 December 2022
Resolved
Propulsion systems and their necessary auxiliaries and control systems and steering and steering control systems are vital systems to a vessel’s survivability and safety. The following items were discovered and need to be repaired/replaced. Fuel oil leak on starboard prime mover return valve, replace fuel oil return hose on stbd main engine, and replace steering unit hoses.
46 CFR 128.130(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 January 2023
Resolved 18 January 2023
Resolution: Received photo evidence of repair to specified machinery.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 29 December 2020
Resolved
The following tests and inspections of fire-extinguishing equipment must be performed by the owner or a qualified facility, to verify compliance with paragraph (a) of this section: Each fire hose must be subjected to a test pressure equivalent either to teh maximal pressure to which it may be subejected or to 100 psi, whichever is greater; 01 fire hose leaked during pressure test onboard.
Action required: 10 - Deficiency Rectified
Due 11 January 2021
Resolved 11 January 2021
Resolution: Hose was removed from service and destroyed in presence of [name withheld] hose was brought aboard prior to team departure from vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 December 2020
Resolved
Tests and inspections of lifesaving equipment shall be carried out during each inspection for renewal of certification and shall demonstrate, as applicable: The proper condition of floatation equipment such as ring buoys; Ring buoy grab lines need to be re-spliced.
Action required: 10 - Deficiency Rectified
Due 11 January 2021
Resolved 11 January 2021
Resolution: Vessel crew properly connected all lights and throwing lines around the body of the ring buoy prior to team departing the vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2019
Resolved
Replace wasted fuel hoses (supply and return lines) for the number 1 and number 2 generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2019
Resolved 9 December 2019
Resolution: Fuel hoses replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 December 2019
Resolved
Replace synchroscope on the main generator switchboard. View of synchroscope is obstructed due to dirt and debris.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2020
Resolved 9 December 2019
Resolution: Synchroscope replaced.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 20 October 2016
Resolved
Rescue platform was insufficent to recover personel in the water and sat about 3 feet out of the water during the drill. required vessel rep to " provide a rescue platform able to recover a man overboard in all conditons of loading.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2016
Resolution: cleared via picture of new platform