MAURY USCG vessel records
← All vessels

LOUISE

LOUISE is a 2012 freight ship. The Coast Guard has recorded 8 inspections since 2016, most recently in June 2026, along with 2 deficiencies.

Records from 2016 to 2026. Most recent: inspection, 3 June 2026.

Built
2012
Last inspected
3 June 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 3 June 2026
Operational controls None recorded without a removal date
Years with a record 6 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9470301
V7A5068
1175162
Flag
LIBERIA
Maury page id
psix-1175162

Documentation record

Tonnage as PSIX records it22863 - Regulatory (Subpart C or D), Gross Ton
12519 - Regulatory (Subpart C or D), Net Ton
22863 - Convention (Subpart B), Gross Ton
12519 - Convention (Subpart B), Net Ton
37207 - Dead Weight, Ton
45375 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 8

3 June 2026 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8390046
16 June 2023 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7716624
25 July 2022 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7508650
15 July 2022 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7506955
24 November 2020 Ballast Water Examination · PSC B
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7096308
11 January 2018 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6331861
22 August 2016 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5980230
27 July 2016 Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5949419

Deficiency record · 2

Operations/Management › Ballast Water Managment › Alternative Management Method
Issued 11 January 2018 Resolved
In order to discharge ballast water in the waters of the United States, the vessel must use a Ballast Water Management System (BWMS) type approved by the U.S. Coast Guard use an alternative Management System (AMS), or use a ballast with water from the U.S. Public Water System (PWS) according to the schedule in paragraph (b), This existing vessel, keel laid in 2010, with a ballast capacity of 14,305 cubic meters, has passed its compliance date and has not installed a BWMS or AMS. Prior to discharging untreated ballast waters of the U.S., the vessel must comply with one of the approved ballast water management methods listed in 33 CFR 151.2035(a). This deficiency will not be cleared until CG inspectors receive information that the vessel installs a BWTS, AMS, or decides to use only public waters for the U.S. Public Water System.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 January 2018
Resolution: Provided an approved Coast Guard Ballast Water Extention Letter from HQ, extending next drydock date. See documents.
Operations/Management › Ballast Water Managment › Ballast Water Discharge
Issued 11 January 2018 Resolved
The vessel equipped with ballast water tanks that operates in the waters of the U.S must: maintian a ballast water management plan that has been developed specifically for the vessel and that will allow those responsible for the plans implementation to understand and follow the vessel's ballast water management strategy and comply with the requirements of this subpart. Vessels ballast water managaement plan does not include any of the provisions listed in 33 CFR 151 Subpart D. Vessels ballast water management plan must include the provisions in 33 CFR 151.2050(g).
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 January 2018
Resolution: Provided an approved Coast Guard Ballast Water Extention Letter from HQ, extending next drydock date. See documents.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.