Records from 2016 to 2019. Most recent: inspection, 7 February 2019.
Inspection history · 11
7 February 2019
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6622027
13 November 2018
Drydock Exam · Internal Structural Exam
Physical examination · Activities Europe · Activity 6575286
21 September 2018
Administrative Inspection · Annual Inspection
Physical examination · Activities Europe · Activity 6545429
28 November 2017
Administrative Inspection
Administrative · Activities Europe · Activity 6314033
6 June 2017
MTSA/ISPS Verification · MARPOL Annex II Examination · MARPOL Annex VI Survey · MARPOL Annex I Examination · MARPOL Annex IV Survey · Annual Inspection
Physical examination · Activities Europe · Activity 6167042
6 April 2017
Administrative Inspection
Administrative · Activities Europe · Activity 6120170
18 November 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6044022
27 September 2016
In-Service Inspection
Physical examination · Activities Europe · Activity 6010284
16 August 2016
Administrative Inspection · In-Service Inspection
Physical examination · Activities Europe · Activity 5973995
22 July 2016
Administrative Inspection · Internal Structural Exam · Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5949703
21 July 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5947892
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 19 October 2018
Resolved
Vessel's rescue boat engine was replaced with non-type approved diesel outboard engine. Provide verification that intalled engine is appropriate for application in compliance with rescue boat type approval.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 November 2018
Resolved 14 November 2018
Resolution: Replaced rescue boat engine with original USCG type approved engine. Tested operation to the satisfaction of the USCG.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 19 October 2018
Resolved
Junction box serving e-light at liferaft embarkation station at port bridge wing produced smoke during inspection. Repair box and subject affected light to satisfactory test on e-power.
Action required: 10 - Deficiency Rectified
Due 19 October 2018
Resolved 19 October 2018
Resolution: Tested sat
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 19 October 2018
Resolved
Ship staff training should include familiarization in the operation and maintenance of oil filtering equipment. C/E was unfamiliar with pulling up history of OCM/OWS operations.
Action required: 10 - Deficiency Rectified
Due 19 October 2018
Resolved 19 October 2018
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 19 October 2018
Resolved
Rescue boat davit winch is powered by electric motor IAW 46 CFR 160.115-7. Electric motor is inoperable. Repair or replace motor to comply with winch approval and demonstrate recovery capability IAW SOLAS III/Reg 17.
Action required: 705 - Other - as specified
Due 16 December 2018
Resolved 14 November 2018
Resolution: Rescue boat davit winch motor was tested satisfactory during drydock and witnessed by USCG.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 28 November 2017
Resolved
Missing packing/cutless bearing due to earlier damage.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 December 2017
Resolved 15 December 2017
Resolution: Rcvd ABS Class report that shaft and cutless has been replaced.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 6 June 2017
Resolved
Existing oil content meter installed on the oily water separator display is faulty. Visible for data recoding but very difficult to read. Provide evidance of replacement with a calibrated and fully functional unit. MARPOL Annex I Reg 14 / MEPC 107.
Action required: 705 - Other - as specified
Due 13 August 2017
Resolved 3 August 2017
Resolution: Received pictures and a copy of the calibration certificate for the replaced BILGMON oil content meter. Calibration Certificate dated 1JUN17
Construction/Loadline › Markings › Load Line Mark
Issued 6 June 2017
Resolved
Vessels displayed plimsoll marks and draft marks on hull are fadded/illegible. Provide evidence that they have been repainted and legibility restored. 46CFR42.13-40
Action required: 705 - Other - as specified
Due 13 October 2017
Resolved 22 July 2017
Resolution: Recieved an email from the master on 22JUL17 attesting to the correction of loadlines and hull markings.
Lifesaving › Emergency Outfit › Breathing Apparatus
Issued 6 June 2017
Resolved
Bessel is without portable means to test atmosphere of enclosed spaces as require for carrage of NLS and enclose space entry. Provide evidence that required instruments are on board and calibrated. IMO A.673(16)3.12.4, 74SOLAS(14) III/19.3.6.2.3.
Due 13 August 2017
Resolved 3 August 2017
Resolution: Received images and calibration certification dated 20APR17.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 18 November 2016
No resolution recorded
Provide plan detailing correction of deficiencies noted in MSC letter C1-1603666.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 18 December 2016 — due date passed with no resolution recorded
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 21 July 2016
Resolved
Space containing emergency fire pump has direct access to category "A" machinery space. SOLAS II-2 Reg 10/2.2.3.2.2.2 Alterations to be made prior to international voyage.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 27 July 2016
Resolution: Properly installed per approved plans submitted to MSC.
Electrical › Electrical Distribution System (emergency) › Switchboard
Issued 21 July 2016
Resolved
Emergency 208/120V switchboard is not easily accessible. SOLAS II-1 Regs 43.5.1 and 45.2 Alterations to be made prior to international voyage.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 27 July 2016
Resolution: Properly installed per approved plans submitted to MSC.
Electrical › Electrical Distribution System (emergency) › Circuit Breaker
Issued 21 July 2016
Resolved
Emergency ventilation and fuel pump stops will not stop equip if damage to wiring occurs. Alterations to be made prior to operation.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 27 July 2016
Resolution: Properly installed per approved plans submitted to MSC.
Electrical › Electrical Distribution System (emergency) › Cable
Issued 21 July 2016
Resolved
Emergency power cables run through category "A" machinery space and generator space.SOLAS II-1 Reg 43.1.3 Alterations to be made prior to international voyage.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 27 July 2016
Resolution: Properly installed per approved plans submitted to MSC.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 21 July 2016
Resolved
General Arrangement/Fire Control plan must be updated. Alterations to be made prior to operation.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 27 July 2016
Resolution: Walked and approved updated fire plan.