PURSE PRINCESS is a passenger vessel (inspected). The Coast Guard has recorded 17 inspections since 2017, most recently in February 2026, along with 17 deficiencies — 5 with no resolution recorded —.

Records from 2017 to 2026. Most recent: inspection, 16 February 2026.

Built
Not recorded
Last inspected
16 February 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 16 February 2026
…past their stated due date1
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2017–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDH4882
1178693
Flag
UNITED STATES
Maury page id
psix-1178693

Documentation record

Registered dimensions (L × B × D)49.0 ft × 14.5 ft × 5.3 ft
Registered tonnagegross 14 / net 12
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCHANTIERS JEANNEAU · LES HERBIERS, FRANCE
Hull materialFRP (Fiberglass)
PropulsionAuxiliary Sail
Hull shapeSail (Faired Keel)
Hull configurationMonohull
Hailing portBARRINGTON, RI
Trade endorsementsCoastwise, restricted
DocumentationValid · issued 3 July 2025 · expires 31 July 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it14 - Simplified, Gross Ton
12 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 17

16 February 2026 Administrative Inspection · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8311224
2 October 2025 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8245261
28 July 2025 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8196308
15 July 2024 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7956602
7 May 2024 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7903375
13 April 2023 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7668539
29 April 2022 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7440801
5 April 2022 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7424026
26 April 2021 COI Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7183077
28 May 2020 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6965172
26 March 2020 Internal Structural Exam · Drydock Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6931775
1 May 2019 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6673566
1 April 2019 In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6683110
18 June 2018 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6447807
13 April 2018 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6398302
9 May 2017 Simplified Stability Test
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6142332
8 May 2017 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6141794

Deficiency record · 17

99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 February 2026 No resolution recorded
REPAIRS OR ALTERATIONS TO THE HULL, MACHINERY, OR EQUIPMENT THAT AFFECT THE SAFETY OF THE VESSEL MUST NOT BE MADE WITHOUT THE APPROVAL OF THE COGNIZANT OCMI. 46 CFR 176.700(a) IT WAS REPORTED THAT THE VESSEL SUSTAINED DAMAGE DUE TO A FIRE ONBOARD. RIOR TO COMMENCING REPAIRS, SUBMIT REPAIR PROPOSALS TO THE LOCAL OCMI FOR APPROVAL. THE VESSEL IS ALLOWED A ONE TIME TRANSIT TO LIBERY LANDING FOLLOWING THE SUBMITION AND APPROVAL OF A DEAD SHIP TOW PLAN.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 2 October 2025 No resolution recorded
PRIOR TO CARRIAGE OF PAX UNDER SAIL A vessel must be operated...in such a manner as to afford adequate precaution against hazards that might endanger the vessel and the persons being transported. The following sail rigging components have failed or show evidence of fatigue / stress and are of concern for failure. Repair / replace prior to carrying any passengers under sail (including less than 06 passengers). (1)Main-sheet blocks & attachment hard-ware (bails & beckets, eye straps, etc.), on boom & mast base. (2)Boom vang block & attachments (vang pins, tangs, bails, & associated hard-ware) (3)Main-sail out-haul control block(s) at mast base. (4)Incorrectly terminated upper attachment (dyneema) of jib / genoa halyard / furler (5) Port winch (6) Lower starboard main-sail furler base swivel mounting bolt (sheared) PRIOR TO CARRIAGE OF PAX UNDER SAIL 46CFR185.100 NVIC 02-16
Action required: 705 - Other - as specified
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 2 October 2025 No resolution recorded
he cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Written Maintenance Plan: All inspected sailing vessel owner/operators should have a written Preventive Maintenance Plan (PMP) that specifically addresses their vessel's sail rigging equipment and components. Re-establish and implement vessel's written preventative maintenance plan (PMP) within 30 days. 46CFR177.202(b)(12)(i) NVIC 02-16
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 October 2025 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 October 2025 No resolution recorded
PRIOR TO CREDIT DDX The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Vessel mast was last unstepped for USCG inspection in April 2019. Vessel will unstep / down-rig mast, spars, standing rigging components and make available for USCG inspection prior to Credit Dry-Dock. PRIOR TO CREDIT DDX 46CFR176.840 NVIC 02-16
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 October 2025 No resolution recorded
PRIOR TO CREDIT DDX A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Industry published guidelines for the replacement or renewal of stainless steel wire cable...notes the following life expectancy; Heat & water salinity medium (East / West Coast of U.S.) - 10 to 15 yrs. Fresh water climate - 15 to 20yrs. There is no provided evidence of stainless steel standing rigging (stays, shrouds, attachment hard-ware,etc.) being renewed since vessel construction in 2005. Replace standing rigging prior to Credit Dry-Dock. PRIOR TO CREDIT DDX 46CFR176.800(a) NVIC 02-16
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 27 August 2025 Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Vessel has not unstepped rig since April 2019 for USCG inspection. Prior to credit drydock, vessel will unstep rig. 46CFR176.840 NVIC 02-16
Action required: 705 - Other - as specified
Resolved 2 October 2025
Resolution: Resolved for admin, re-issued via MISLE No. 8245261 w/ consolidated CG-835.
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 28 July 2025 Resolved
A vessel must be operated...in such a manner as to afford adequate precaution against hazards that might endanger the vessel and the persons being transported. Listed components of the main sail control systems / running rigging were deformed and/or worn past their service-life and of concern for failure; (1)Main-sheet blocks & attachment hard-ware, on boom & mast base. (2)Boom vang block & attachment & internal sheave pin. (3)Main-sail out-haul control block(s) at mast base. Replace, prior to carrying passengers under sail power. 46CFR185.100 NVIC 02-16
Action required: 705 - Other - as specified
Resolved 2 October 2025
Resolution: Rescinded for admin, re-issued in Activity #8245261, w/ consolidated CG-835 and addtnl rigging components following 3rd party rig survey.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 July 2025 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: inspection of the condition of the superstructure, masts, and similar arrangements constructed on the hull, and on a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. Certain running rigging shows indications of age & wear expending service-life. Repair/replace within 14 days.(see photos) 46 CFR 176.802(a)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 October 2025
Resolution: Vsl O/O and 3rd Party Rig Survey (see Docs) provided satisfactory evidence of correction for these specific def items.
01 - Certificates & Documentation › 013 - Documents › Survey report file
Issued 28 July 2025 Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Provide 3rd Party Survey report attesting to condition of the rig with USCG Inspectors in attendance. Complete within 30 days. 46 CFR 176.840
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 October 2025
Resolution: 3rd Party Rig Survey by [name withheld] of HullSpeedRiggingCo. reviewed by this office. (see Docs)
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 28 July 2025 Resolved
In addition, the owner shall, prior to receiving a Certificate of Inspection, submit for approval to the cognizant OCMI, at least two copies of the following plans, manuals, analyses, and calculations that are applicable to the vessel as determined by the OCMI: On sailing vessels: Masts, including integration into the ship's structure. Re-establish vessel preventative maintenance plan (PMP) within 30 days. 46CFR177.202(b)(12)(i)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 October 2025
Resolution: Resolved for admin, re-issued via MISLE #8245261 & consollidated CG-835.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 July 2024 Resolved
Electrical equipment a vessel must be installed and maintained to... protect passengers, crew, other persons, and the vessel form electrical hazards... Attending marine inspectors identified the 50 AMP shore tie to not be properly terminated. Outfit vessel with safe way to terminate wiring. 46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 June 2025
Resolution: See documents, Shore tie terminated
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 July 2024 Resolved
Twist on type connectors may not be used for making joints in cables facilitating a conductor splice or extending the length of a circuit... Attending marine inspector identified a twist nut type connector on the 30 amp shore tie connection. Outfit vessel with safe way to connect the 30 amp shore tie connections. 46 CFR 183.340
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 June 2025
Resolution: See documents, Shore tie terminated
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 7 May 2024 Resolved
) Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction, and a uniform load of 74 kilograms per meter (50 pounds per foot) applied to the top rail in any direction... Deck railing's stanchion replacement/repair on port side and bow pulpit as they cannot currently withstand the minimum required loading by regulation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 May 2024
Resolution: Repairs complete.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 7 May 2024 Resolved
(a) A pre-engineered fixed gas fire extinguishing system must:...(4) Be installed in accordance with the manufacturer's instructions. Vessel's 02 pre-engineered fixed fire extinguishers have not been service since 2022. Must get annual servicing.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 May 2024
Resolution: Servicing Complete
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 26 April 2021 Resolved
46CFR177.330 Vessel mus conduct rigging inspection as per approved plan (every 02 months). Vessel has not inspected rigging as per plan and is restricted from carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 April 2021
Resolved 30 April 2021
Resolution: pictures uploaded to documents to satisfy rigging inspection requirement.
Operations/Management › Drills/Instruction › Not Conducted
Issued 18 June 2018 Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that abandon ship or man overboard drills be held under simulated emergency conditions specified by the inspector. Vessel did not have sufficient crew to complete underway drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 June 2018
Resolution: Conducted satisfactory person-overboard and firefighting drills with crew.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 18 June 2018 Resolved
A vessel must carry one floating water light (unless it is limited to daytime operations) that is approved under 161.010 of Subchapter Q of this chapter and that water light must be attached to the lanyard with a corrosion resistant clip. Vessel's water light is not approved under 161.010 and is improperly attached to ring life buoy. Restricted to daytime operation.
Action required: 705 - Other - as specified
Resolved 20 June 2018
Resolution: Verified new waterlight installation and operation.

Ownership record