Records from 2020 to 2025. Most recent: inspection, 24 October 2025.
Documentation record
Registered dimensions (L × B × D)25.3 ft × 14.0 ft × 5.0 ft
Registered tonnagegross 11 / net 9
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSISCO MARINE LLC · PANAMA CITY, FL, UNITED STATES · built 2012
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portBOSTON, MA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 16 March 2026 · expires 30 April 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it11 - Simplified, Gross Ton
9 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 9
24 October 2025
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8256218
27 August 2025
Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8215827
18 November 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8035362
25 October 2023
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7814738
12 January 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7620700
22 November 2022
Drydock Exam · Deficiency Check · Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7597808
1 September 2022
Drydock Extension
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7548512
6 October 2021
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7327498
20 July 2020
Deficiency Check · Initial Certification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7011913
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 29 August 2025
Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. Machinery space hatch cover hinge attachments have wasted and failed, and has no means of securing closed.
705: Rectify by next drydock.
46 CFR 144.320(b)
Action required: 705 - Other - as specified
Due 30 November 2025
Resolved 3 November 2025
Resolution: Machinery space hatch cover hinges renewed and a dog installed for securing in the closed position.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 29 August 2025
Resolved
Means must be provided for stopping each fan in a ventilation system serving machinery spaces and for closing, in case of fire, each doorway, ventilator, and annular space around funnels and other openings into such spaces. Vessel has no means of closing ventilation openings to the machinery space.
705: Rectify by next drydock.
46 CFR 144.605
Action required: 705 - Other - as specified
Due 30 November 2025
Resolved 3 November 2025
Resolution: Steel closures and guides installed for four engine compartment openings, providing means of closing ventilation to the machinery space.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 August 2025
Resolved
Electrical connections must be suitably installed to prevent them from coming loose through vibration or accidental contact. Port bilge high water alarm and port bilge submersible electric bilge pump have spliced connections that are not correctly installed to prevent loosening or accidental contact.
46 CFR 143.400(e)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2025
Resolved 4 September 2025
Resolution: Confirmed proper connections for bilge system wiring.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 August 2025
Resolved
If a towing vessel carries only one lifebuoy... the floating electric water light must be attached by the lanyard with a corrosion-resistant clip to allow the water light to be quickly disconnected from the lifebuoy. The clip must have a strength of at least 22.7 kilograms (50 pounds). The clip attaching the water light lanyard to the lifebuoy was not corrosion resistant and was beginning to corrode and seize.
46 CFR 141.360(c)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2025
Resolved 4 September 2025
Resolution: Floating waterlight lanyard clasp renewed.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 August 2025
Resolved
Each towing vessel must have a fire-detection system installed to detect engine room fires. The owner or managing operator must ensure system is installed, tested, and maintained in accordance with the manufacturer's design manual. The manufacturer's design manual for the installed fire-detection system was not maintained on the vessel or available for inspection, and system maintenance and testing IAW the manual could not be verified.
46 CFR 142.330(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2025
Resolved 30 September 2025
Resolution: Received manufacturer instructions and procedure established by owner/operator for the testing of the installed heat detector.
10 - Safety of Navigation › N/A - No Subsystem › Navigation records
Issued 18 November 2024
Resolved
The following list of items must be recorded in the TVR:(1) Personnel records;(2) Safety orientation;(3) Record of drills and instruction;(4) Examinations and tests;(5) Operative navigational safety equipment;(6) Navigation assessment;(7) Navigation safety training;(8) Oil residue discharges and disposals;(9) Record of inspection of towing gear; and(10) Fire-detection and fixed fire-extinguishing. Vessel was not documenting required items in TVR. Vessel will be reevaluated within 30 days to ensure recordings are taking place.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 December 2024
Resolved 18 December 2024
Resolution: Operator submitted objective evidence that records were being kept.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 18 November 2024
Resolved
The person in command of a documented vessel must produce the original Certificate of Documentation (COD) currently in effect for that vessel upon the demand of
any person acting in an official capacity. Operator was not able to produce the original Certificate of Documentation to marine inspector. Provide vessel with original copy of vessel's COD within 30 days,
Action required: 705 - Other - as specified
Due 18 December 2024
Resolved 7 January 2025
Resolution: Operator received original COD.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 November 2024
Resolved
Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. Waste receptacle on board was made of combustible material. O/O is to remove or replace receptacle.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 18 November 2024
Resolution: Operator removed the improper waste receptacle from the vessel.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 November 2024
Resolved
The frame or support of any semi-portable fire extinguisher fitted with wheels must be welded or otherwise permanently attached to a steel bulkhead or deck to prevent it from rolling under heavy sea conditions. The Vessel's 160-B semi-portable fire extinguisher was unsecured on deck. Permanently attached fire extinguisher to deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 December 2024
Resolved 18 December 2024
Resolution: Operator attached the semi portable fire extinguisher to the deck
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 12 January 2023
Resolved
The master of a towing vessel must ensure that each crewmember participates in fire-fighting drills and receives instruction at least once each month. The last logged drill was May 2022. Conduct Fire drill with 7 days.
Action required: 705 - Other - as specified
Resolved 23 January 2023
Resolution: Vessel conducted drills
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 January 2023
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must be maintained to ensure proper operation. The starboard main engine has a coolant leak from the expansion joint on the keel cooler.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 January 2023
Resolution: Keel Cooler pipe was re-sealed.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 1 September 2022
Resolved
The drydock examination must be conducted while the vessel is hauled out of the water or placed in a drydock or slipway. The Coast Guard inspector or surveyor conducting this examination must: Examine the exterior of the hull, including bottom, sides, stern, and examine all appendages for damage, fractures, wastage, pitting, or improper repairs. Integral keel coolers found with extensive coolant leaks and cracked welds. Clean all weld seams and make available for inspection in order to determine extent of needed repairs. Prepare repair proposal to attending Marine Inspector for making integral keel coolers watertight.
46 CFR 137.330 (a)(1)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2022
Resolved 22 November 2022
Resolution: All welds repaired and pressure tested.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 1 September 2022
Resolved
The drydock examination must be conducted while the vessel is hauled out of the water or placed in a drydock or slipway. The Coast Guard inspector or surveyor conducting this examination must: Examine each tail
shaft for bends, cracks, and damage, including the
sleeves or other bearing contact surfaces on the tail
shaft for wear. Evidence of wear and play at the tail
shaft where the tail shaft meets the cutlass bearing.
Pull tail shaft to the satisfaction of attending Marine
Inspector to determine extent of tail shaft wear.
46 CFR 137.330 (a)(2)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2022
Resolved 22 November 2022
Resolution: Shafts replaced in kind.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 1 September 2022
Resolved
The drydock examination must be conducted while the vessel is hauled out of the water or placed in a drydock or slipway. The Coast Guard inspector or surveyor conducting this examination must: Open and examine all sea chests, through-hull fittings, and strainers for damage, deterioration, or fouling. Sea valves were not available for inspection. Prepare and have available sea valves to show proper operation to attending Marine Inspector prior to credit dry-dock.
46 CFR 137.330(a)(6)
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 September 2022
Resolved 22 November 2022
Resolution: Sea valves satisfactorily inspected.