Records from 2012 to 2024. Most recent: inspection, 5 November 2024.
Inspection history · 16
5 November 2024
Administrative Inspection
Administrative · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 8029880
26 February 2024
Administrative Inspection
Administrative · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7870419
23 June 2023
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7780878
31 October 2022
COI Inspection · MTSA Verification · Drydock Exam · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7580407
26 April 2021
MTSA Verification · Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7184790
14 January 2021
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 7124472
10 July 2020
Examination of Repairs · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7007776
15 May 2019
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6685459
1 March 2019
Deficiency Check · In-Service Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6635205
5 November 2018
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6576606
10 May 2018
Administrative Inspection · Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6410924
22 August 2017
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6248560
27 July 2016
Administrative Inspection · MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5954759
7 July 2015
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5177060
18 September 2014
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4985409
11 June 2012
Internal Structural Exam · Welding Related Inspections Qualification Testing · Cargo Tank Internal · Construction Oversight · Initial Certification · Drydock Exam · Administrative Inspection · Plan Review (Other than "T") · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4340520
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 1 March 2019
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern; Port and STBD Vapor headers are missing studs. Barge is not authorized to load cargo using Vapor Collection until studs are installed and MI clears def.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 5 March 2019
Resolution: Received satisfactory photographic evidence that pins are installed
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 10 May 2018
Resolved
Due to Owner/Operator and Vessel Name change, the VRP on board is not currently correct. Require updated VRP to be placed onboard vessel to the satisfaction of the attending CG Marine Inspector.
Vessel authorized continued full operations, route and service with current valid COI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2018
Resolved 6 March 2019
Resolution: Confirmed Vessel VRP is valid for Owner and Operator in VRP Database