Records from 1988 to 1990. Most recent: inspection, 11 May 1990.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 12
11 May 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1216811
11 April 1990
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 904581
2 April 1990
COI Inspection · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 906332
8 February 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 910404
18 December 1989
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1282241
31 March 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 893776
10 March 1989
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1208433
18 January 1989
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 893115
28 November 1988
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 897483
3 May 1988
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1037472
18 April 1988
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1036374
20 January 1988
Initial Certification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1017274
Construction/Loadline
Issued 2 April 1990
Resolved
REPAIR DETERIORATED PLANKING IMMEDIATELY FORWARD OF AND ABOVE AFT STARBOARDPORT LIGHT.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Construction/Loadline
Issued 2 April 1990
Resolved
REPAIR DETERIORATED FRAME PORT/STARBOARD OF KEEL IN BILGE AT GALLEY ENTRANCE.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Construction/Loadline
Issued 2 April 1990
Resolved
REPAIR DETERIORATED PLANK PORT SIDE ABOVE FORWARD PORT LIGHTS.
Condition: Unknown
Due 2 April 1990
Resolved 2 April 1990
Construction/Loadline
Issued 18 December 1989
Resolved
CONDUCT U/W EXAM OF VSL WITH CG MARINE INSPECTOR ONBAORD. U/W EXAM WAS NOT POSSIBLE ON DAY OF LAST EXAM DUE TO ICE IN WATER. THIS REQUIREMENT IS TO BE COMPLETED PRIOR TO THE CARRIAGE OF PASSENGERS FOR HIRE.
Condition: Unknown
Due 18 December 1989
Resolved 18 December 1989
Navigation
Issued 18 December 1989
Resolved
DEMONSTRATE PROPER OPERATION OF VSL'S VHF- FM RADIO WHILE U/W.
Condition: Unknown
Due 18 December 1989
Resolved 18 December 1989
Engineering
Issued 18 December 1989
Resolved
REPAIR LEAKAGE 2 1/2" SEA COCK VALVE TO MAIN DIESEL ENGINE.
Condition: Unknown
Due 18 December 1989
Resolved 18 December 1989
Navigation
Issued 18 December 1989
Resolved
PROVIDE CURRENT UP TO DATE NAVIGATION CHARTS OF OPERATING AREA MOST RECENT CHART ABOARD WAS DATED 1980.
Condition: Unknown
Due 18 December 1989
Resolved 18 December 1989
Lifesaving
Issued 18 December 1989
Resolved
PROVIDE 5 APPROVED ADULT LIFE PRESERVERS FOR A TOTAL OF 53 ABOARD, UNTIL THIS REQUIREMENT IS MET, VESSEL IS RESTRICTED TO A MAXIMUM OF 44 PASSENGERSAND A TOTAL OF 48 PERSONS ABOARD.
Condition: Unknown
Due 18 December 1989
Resolved 18 December 1989
Navigation
Issued 18 December 1989
Resolved
REPAIR OR REPLACE STARBOARD NAVIGATION LIGHT SCREEN.
Condition: Unknown
Due 18 December 1989
Resolved 18 December 1989
Navigation
Issued 10 March 1989
Resolved
PROVIDE PROOF THAT STERNLIGHT INSTALLATION IS IN ACCORDANCE WITH COLREGS (IE. THAT LIGHT HAS A TWO MILE RANGE)
Condition: Unknown
Due 10 March 1989
Resolved 10 March 1989
Lifesaving
Issued 10 March 1989
Resolved
PROVIDE ONE ADULT LIFE PRESERVER. VESSEL RESTRICTED TO NOT MORE THAN 52 PERSONS ON COASTWISE ROUTES UNTIL THIS REQUIREMENT IS SATISFIED
Condition: Unknown
Due 10 March 1989
Resolved 10 March 1989
Lifesaving
Issued 10 March 1989
Resolved
PROVIDE SIX HAND HELD ORANGE FLARES.
Condition: Unknown
Due 10 March 1989
Resolved 10 March 1989
Navigation
Issued 18 January 1989
Resolved
PROVIDE APPROVED STERN LIGHT PRIOR TO OPERATING VESSEL.
Condition: Unknown
Due 18 January 1989
Resolved 18 January 1989
Fire Fighting
Issued 18 January 1989
Resolved
PROVIDE APPROVED 50' FIRE HOSE PRIOR TO OPERATING VESSEL.
Condition: Unknown
Due 18 January 1989
Resolved 18 January 1989
Lifesaving
Issued 18 January 1989
Resolved
PRIOR TO OPERATING VESSEL WITH MORE THAN 47 PERSONS ON BOARD, PROVIDE SIX ADDITIONAL ADULT PFD'S AND ONE CHILD PFD.
Condition: Unknown
Due 18 January 1989
Resolved 18 January 1989
Lifesaving
Issued 18 January 1989
Resolved
PROVIDE 6 PARACHUTE FLARES AND 3 HANDHELD DISTRESS SIGNALS, PRIOR TO OPERATING VESSEL.
Condition: Unknown
Due 18 January 1989
Resolved 18 January 1989
Electrical
Issued 18 January 1989
Resolved
MAKE APPROPRIATE REPAIR TO GENERATOR SEA SUCTION HOSE WHERE CRACKED AT THE ENGINE FITTING, PRIOR TO OPERATING VESSEL.
Condition: Unknown
Due 18 January 1989
Resolved 18 January 1989
Construction/Loadline
Issued 18 April 1988
Resolved
INSTALL (12) TWELVE INCH TRUNK, TO RAISE WEATHER TIGHT HATCH OFF THE MAIN DECK (FORWARD)
Condition: Unknown
Due 18 April 1988
Resolved 18 April 1988
Construction/Loadline
Issued 20 January 1988
Resolved
RESEAL THE ENTIRE MAIN DECK TO MAKE IT WATERTIGHT. PRESENTLY IT IS LEAKING.
Condition: Unknown
Due 20 January 1988
Resolved 20 January 1988
Documentation
Issued 20 January 1988
Resolved
PROVIDE A VALID RADIO TELEPHONY FCC CERTIFICATE.
Condition: Unknown
Due 20 January 1988
Resolved 20 January 1988
Engineering
Issued 20 January 1988
Resolved
REPLACE THE MISSING HEAT DEFLECTOR SHIELD FOR THE RACOR FUEL FILTER TO THE MAIN ENGINE.
Condition: Unknown
Due 20 January 1988
Resolved 20 January 1988
Engineering
Issued 20 January 1988
Resolved
INSTALL INSULATION ON MAIN DIESEL ENGINE VERTICAL EXHAUST, OR ON THE HYDRAULIC LINES IN WAY OF EXHAUST, WHERE MISSING.
Condition: Unknown
Due 20 January 1988
Resolved 20 January 1988
Engineering
Issued 20 January 1988
Resolved
CONDUCT A 5 PSI HYDROSTATIC TEST OF THE TWO TANKS, IN THE PRESENCE OF A USCG MARINE INSPECTOR NO LATER THAN THE VESSEL'S NEXT CREDIT DRYDOCK.
Condition: Unknown
Due 20 January 1988
Resolved 20 January 1988