Records from 2016 to 2026. Most recent: inspection, 19 February 2026.
Inspection history · 30
19 February 2026
Annual Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8312148
7 February 2026
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8307471
9 June 2025
Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8156038
12 February 2025
Annual Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8078440
8 October 2024
Deficiency Check · Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8013951
8 February 2024
Annual Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7851763
18 October 2023
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7811067
10 September 2023
Damage Survey · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7788941
9 September 2023
Damage Survey · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7734797
9 September 2023
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7804476
3 May 2023
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7686881
10 January 2023
DAPI Audit · COI Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7618363
15 August 2022
Deficiency Check · Drydock Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7534309
23 March 2022
Annual Inspection · Deadweight Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7417066
2 February 2021
Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7134435
9 September 2020
Hull Examination · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7053325
26 May 2020
Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6961054
10 April 2020
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6937765
20 December 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6877588
23 August 2019
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6792580
5 August 2019
Damage Survey · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6774289
26 June 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6726568
13 February 2019
DAPI Audit · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6624468
17 September 2018
Deficiency Check · Drydock Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6540417
16 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6513757
10 January 2018
Deficiency Check · COI Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6335380
30 September 2017
Administrative Inspection · In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6288663
7 March 2017
Annual Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6100107
13 September 2016
Deficiency Check · Hull Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5999420
12 April 2016
Annual Inspection · DAPI Audit
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5852670
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 19 February 2026
Resolved
The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. Portside main diesel engine and generators fuel shut off valves were found inoperable due to a copper piping was preventing its operation by blocking its closure caused by a negligent operation. 46 CFR 182.455(4)/ 46 CFR 176.830 (a).
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 February 2026
Resolution: Corrected on the Spot 10C.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 19 February 2026
Resolved
Boundaries that separate machinery spaces from accommodation spaces, service spaces, and control spaces must be lined with noncombustible panels or insulation approved in accordance with § 164.009. A small segment of the non-combustible panels was found deteriorated in the portside engine room, below the engine access hatch. 46 CFR 177.410 (4).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2026
Resolved 27 February 2026
Resolution: Replaced.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 February 2026
Resolved
All observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. The portside main diesel engine oil breather hose was found leaking, with a paper towel acting as a plug, and leaking oil on top of the battery, posing a fire risk. 46 CR 176.830.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2026
Resolved 27 February 2026
Resolution: Cap and closing valve installed, and moved to a different location out of the batteries.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 19 February 2026
Resolved
The equipment required for lifefloats and buoyant apparatus must meet the following specifications: Each paddle must be of at least 4 feet in length, lashed to the life float to which it belongs and buoyant. All 06 paddles were found fractured and deteriorated. 46 CFR 180.175 (f)(2).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2026
Resolved 4 March 2026
Resolution: All damaged paddles have been replaced with new ones.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 February 2026
Resolved
A vessel of more than 65 feet in length must carry a minimum of three life buoys of not less than 24 inches in diameter. 02 lifering buoys were found with the grab-line deteriorated and faded.46 CFR 180.70 (a)(3).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2026
Resolved 27 February 2026
Resolution: 02 new liferings were installed with markings and retroreflective material.
01 - Certificates & Documentation › 013 - Documents › Fire safety operational booklet
Issued 19 February 2026
Resolved
The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. If any of the equipment or records have not been properly maintained, a qualified servicing facility may be required to perform the required inspections, maintenance procedures, and hydrostatic pressure tests. Provide a current pre-engineered fixed fire extinguishing system servicing report in compliance with NFPA 10 standard from a qualified servicing facility. 46 CFR 176.810 (2).
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2026
Resolved 27 February 2026
Resolution: Report was provided and verified.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 February 2026
Resolved
All observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Properly repair dead-ending wires under the operating station.46 CFR 176.830.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2026
Resolved 27 February 2026
Resolution: Safe electrical junction box was installed islolating the wires.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 February 2026
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. Starter failed while vessel was moored.
46 CFR 183.200(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 7 February 2026
Resolved 7 February 2026
Resolution: Video evidence of vessel running properly after starter replacemnt reviewed and found sufficient by Duty Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
FRP damage stbd side hull, forward fore foot under the stem. 46CFR176.600(d). Code 17.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Repaired in kind
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
FRP exposure damage stbd side inner side of the hull as marked.46 CFR 176.600 (d), code 17.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Repaired in kind.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
FRP exposure damage of 3 feet long, inner side of the stbd side hull with a 2" penetration, with foam core damage inside of the hull. 46 CFR 176.600(d) Code 17C.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Repaired in kind.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
FRP penetration damage found in stbd side in the hull as marked in pink color. 46CFR176.600 (d) Code 17C.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Repaired in kind.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
Provide a report assessing that stbd side shaft has been checked by a local technical shop to determine if damage was found and if it was repaired. 46CFR176.600(d) Code 17C.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Report indicated that the shaft was within tolerances.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
Repair or replace starboard side damaged propeller. 46 CFR176.600(d) Code 17C.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: A new prop was installed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
FRP damage with penetration in the stbd side, and outer side of the hull measuring 13.5'W X 1.5'L. 46CFR176.600(d) Code17.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Repaired in kind.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
FRP damage with penetration close to midship, outer side of the hull. 46 CFR 176.600 (d), Code 17.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Repaired in kind.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
FRP damage under shaft log trunnel, stud side hull. 46CFR176.600 (d) Code 17C.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Repaired in kind.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
FRP damage located at the stbd side hull, towards the outer side of the hull and adjacent to the shaft log. 46 CFR 176.600(d) Code 17.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Repaired in kind.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
Repair opening gap at the bottom of the rudder post, outside of the hull at the bottom as marked.46CFR176.600 (d) Code 17C.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2025
Resolution: Repaired in kind.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
Electrical wiring was found penetrating the void 2 watertight bulkheads (fwd and aft), Properly seal to make watertight and verify all other voids bulkheads. 46CFR176.600(d) Code 17C.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2025
Resolution: Both port and starboardside were corrected.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 February 2025
Resolved
Where a flexible fill pipe section is necessary, suitable flexible tubing or hose having high resistance to salt water, petroleum oils, heat and vibration, may be used. Such hose must overlap metallic pipe ends at the least 11/2 times the pipe diameter and must be secured at each end by clamps. The flexible section must be accessible and as near the upper end of the fill pipe as practicable. When the flexible section is a nonconductor of electricity, the metallic sections of the fill pipe separated thereby must be joined by a conductor for protection against generation of a static charge when filling with fuel. Connect conductor to port and starboard fuel fills prior to fueling to the satisfaction of the marine inspector.
46 CFR 182.445 (g)
16(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2025
Resolved 14 February 2025
Resolution: Grounding wires on both fuel fills have been reconnected and found satisfactory.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 8 February 2024
Resolved
A penetration in a watertight bulkhead (WTB) must be as high and as far inboard in the bulkhead as practicable, and made watertight. Both WTBs in FWD engine compartments have several screw holes from previously installed equipment (fans) in engine compartment. 11 holes in STBD, 9 holes in port side.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 February 2024
Resolved 22 February 2024
Resolution: penetrations filled with 3M fire barrier filler putty material
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 February 2024
Resolved
A vessel must comply with the structural design requirements of the standards listed for the hull material of the vessel. Upper 2nd transverse frame in port FWD compartment is dislodged from tabbing mounting frame to longitudinal frame.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 February 2024
Resolved 22 February 2024
Resolution: frame retabbed properly with composite reinforcement material
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 10 January 2023
Resolved
A vessel must be fitted with a FCC type accepted general marine radar system for surface navigation with a radar screen mounted at the primary operating station. Radar system on board is not operational. Vessel restricted to 49 passengers. 46CFR184.404.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2023
Resolved 13 January 2023
Resolution: Marine radar was found to be fully operational and tested.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 10 January 2023
Resolved
One ship station license will be granted for operation of all maritime services transmitting equipment on board a vessel. Vessel’s FCC Bridge to Bridge and Safety Radiotelephony Certificates have call signs that do not match the FCC Station License. 47CFR80.13.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2023
Resolved 20 January 2023
Resolution: FCC Radio safety and bridge to bridge certificates have been renewed and updated with new call sign.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 January 2023
Resolved
A vessel of more than 65 feet in length must carry a minimum of three life buoys of not less than 24 inches in diameter. Port aft life buoy grab line is wasted and requires replacement. Starboard aft life buoy drain plug is wasted and requires replacement. 46CFR180.70(a)(3).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2023
Resolved 24 January 2023
Resolution: Two new liferings have been placed in service.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 10 January 2023
Resolved
Boundaries that separate machinery spaces from accommodation spaces must be lined with noncombustible panels or insulation approved IAW 164.009. Port aft engine compartment overhead fire insulation is falling down and requires repair.46CFR177.414.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2023
Resolved 24 January 2023
Resolution: Insulation was replaced and installed in place.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 January 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew from electrical hazard. Operating station window allows water intrusion to drip down on electrical equipment and requires resealing.46 CFR 183.200.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2023
Resolved 25 January 2023
Resolution: Window was sealed and found no water intrusion.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 10 January 2023
Resolved
A hatch in a cabin top must be weathertight. An escape hatch in overhead of passenger accommodation near bar areas allows rainwater to leak into the passenger accommodation and requires resealing. 46CFR179.360 (a) (3).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2023
Resolved 24 January 2023
Resolution: Hatch was re-sealed and tested without water intrusion.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 10 January 2023
Resolved
Each window and its means of attachment to the hull must be capable of withstanding the maximum load from wave and wind conditions. The port and starboard forward most windows in the passenger accommodation allows rainwater intrusion into passenger accommodation and requires resealing. 46CFR177.1020.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2023
Resolved 25 January 2023
Resolution: Drainage holes found and cleared of obstructions, no water intrusion found.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 March 2022
Resolved
A suitable metal marine type strainer and strainer bowl, must be fitted in the fuel supply line in the engine compartment. Port and starboard machinery space fuel filters were missing strainer bowls.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2022
Resolved 27 June 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 March 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by electrical equipment. #1 Engine starting battery had exposed wiring near its positive terminal.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2022
Resolved 19 April 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 23 March 2022
Resolved
The number of penetrations in a watertight bulkhead must be minimized and watertight. Port void, bunker compartment was missing packing in the forward bulkhead penetration for wiring/cabling.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2022
Resolved 19 April 2022
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 February 2021
Resolved
Electrical equipment exposed to weather or corrosive environments must be watertight, of suitable construction and corrosion-resistant. Aft auxiliary steering operating station has opening on panel that exposes electrical wiring to a wet corrosive environment. Owner/operator is required to close and maintain as drip-proof for spaces containing electrical equipment.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 February 2021
Resolved 8 February 2021
Resolution: Opening on aft steering operating station covered with plate making space containing electrical equipment maintained as drip-proof. Photograph attached.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 May 2020
Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment. The port side aft bilge suction was inoperable when conducting a test.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 June 2020
Resolved 1 June 2020
Resolution: Vessel demonstrated the bilge system is operable by dewatering the port side stern void.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 May 2020
Resolved
Spanner wrenches must be provided where a 40mm (1.5") diameter firehose is required. The vessel did not have a spanner wrench at the firehose station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2020
Resolved 25 June 2020
Resolution: Required spanner wrench is mounted near the fire hose station.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 December 2019
Resolved
PORT main is not functioning. USCG needs to witness repairs after cause of the problem is discovered. vessel is not authorized to operate until clear by USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2020
Resolved 28 December 2019
Resolution: Cleared.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 13 February 2019
Resolved
VESSEL IS REQUIRED TO HAVE 02 VHF RADIOS INSTALLED.
1 VHF RADIO IS REQUIRED BY FCC AND THE SECOND VHF RADIO IS REQUIRED BY THE BRIDGE-TO-BRIDGE ACT. DURING EXAM IT WAS OBSERVED THAT THE VESSEL HAS ONLY ONE VHF RADIO INSTALLED. INSTALL ONE MORE VHF RADIO AS REQUIRED BY A CERTIFIED FCC TECHNICIAN.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 June 2019
Resolution: OCMI has determined that the vessel will be allowed to carry a hand-held VHF radio in leiu of second installed radio for compliance with the Bridge-to-Bridge Act.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 16 August 2018
Resolved
ZERO LENGTH OR BEAM: no dimension information (AIS Antenna Position ABCD values equals 0)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 January 2019
Resolved 13 February 2019
Resolution: Information has been updated and checked on VIVS with no errors showing.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 10 January 2018
Resolved
Radio Telephony Cert expired on 11Jan2018
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 16 January 2018
Resolution: Vessel rep provided the radio telephony certificate.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 10 January 2018
Resolved
01 ring life buoy is missing its labeling
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 16 January 2018
Resolution: New labels were placed on the life buoy.
Lifesaving › Lifefloat › Markings
Issued 10 January 2018
Resolved
All three (03) life floats need new labeling.
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 16 January 2018
Resolution: All three life floats were properly relabeled.
Lifesaving › Lifefloat › Float-free Link
Issued 7 March 2017
Resolved
Make each lifefloat attached to the painter individually.
Action required: 705 - Other - as specified
Due 14 March 2017
Resolved 8 March 2017
Resolution: Owner/operator properly connected lifefloats.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 7 March 2017
Resolved
Missing/expired ammonia inhalants in first aid kit.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 March 2017
Resolved 8 March 2017
Resolution: Owner/operator purchased new ammonia inhalants.