Records from 2016 to 2026. Most recent: inspection, 7 July 2026.
Documentation record
Registered dimensions (L × B × D)278.8 ft × 60.0 ft × 24.0 ft
Registered tonnagegross 3,400 / net 1,426
ITC dimensions (L × B × D)278.8 ft × 60.0 ft × 24.0 ft
ITC tonnagegross 3,400 / net 1,426
BuilderBOLLINGER MARINE FABRICATORS LLC · AMELIA, LA, UNITED STATES · built 2014
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portGALLIANO, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 25 September 2025 · expires 31 October 2026
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1426 - Convention (Subpart B), Net Ton
3400 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 28
7 July 2026
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8432156
5 July 2026
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8434376
13 February 2026
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8305889
1 October 2025
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8243735
29 July 2025
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8197249
10 July 2025
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8179657
16 September 2024
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8007777
12 July 2024
COI Inspection · Drydock Exam · Internal Structural Exam · In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7956800
8 January 2024
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7846297
28 December 2023
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7843224
26 December 2023
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7847209
21 March 2023
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7654168
14 September 2022
Cargo Tank Internal · Administrative Inspection · Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7558257
28 June 2022
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7492346
2 December 2021
MTSA/ISPS Verification · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7360952
12 January 2021
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7123109
11 June 2020
Appeal · Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6974315
21 May 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6957115
27 January 2020
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6897295
7 January 2020
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6884263
24 October 2019
MTSA Verification · Hull Examination · COI Inspection · Administrative Inspection · Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6841236
29 October 2018
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6570561
10 July 2018
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6474693
8 December 2017
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6322883
5 October 2017
Annual Inspection · MARPOL Annex I Examination · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6281288
3 October 2017
Cargo Tank Internal · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6281533
14 April 2017
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6126564
15 September 2016
ACP Annual Oversight · Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6001846
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 July 2026
Resolved
The owner or operator of an OSV shall make the vessel available for inspection by a marine inspector each time an accident occurs, or a defect is discovered that affects the safety of the vessel; or the effectiveness or completeness of its lifesaving, fire-fighting, or other equipment. The vessel experienced a failure of the port main engine due to #4 cylinder head overheating. Vessel will return to Port Fourchon to undergo repairs prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 July 2026
Resolved 9 July 2026
Resolution: Received ABS and tech report stating repairs were completed.
14 - Pollution Prevention › N/A - No Subsystem › VGP: General
Issued 1 October 2025
Resolved
No person shall conduct an oil or hazardous material transfer unless a drain is closed by mechanical means. Small discharge containments around hose connection/vents on both port and starboard sides were missing or provided with non-mechanical means for closure. Mechanical means to close containment drains were obtained and put into place.
33 CFR 156.120
Action required: 10 - Deficiency Rectified
Due 1 October 2025
Resolved 1 October 2025
Resolution: Mechanical means to close containment drains were obtained and put into place.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 September 2024
Resolved
Marine Inspections identified multiple emergency remote fuel shut-off valves inoperable. Vessel is to rectify deficiency prior to departure.
46CFR56.50-60 {d) 3 (ii
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 September 2024
Resolution: System bleed and tested infront of CG attending inspector
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 4 September 2024
Resolved
Electric installations on vessels must ensure: Protection of passengers, crew, other persons, and the vessel from electrical hazards. Two dead end cable in tank farm overhead;
STBD main diesel engine open per-heater control box; Faulty receptacle on STBD deck cargo rail.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 September 2024
Resolution: Verified on scene cables in tank farm secured in a junction box; pre-heater box block off plate; deck cargo receptacles replaced.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 September 2024
Resolved
A main transverse watertight bulkhead may not have non-watertight penetrations below the bulkhead deck. Non-watertight penetration identified behind port MDE.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 September 2024
Resolution: Penetration properly sealed
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 4 September 2024
Resolved
Equipment in support of the normal operation of the emergency power source includes, but is not limited to sound powered phones. E-generator room has a deteriorated sound powered phone cable.
46 CFR 112.05-5 (d)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 23 September 2024
Resolution: Sound powered phone replaced
14 - Pollution Prevention › 142 - MARPOL Annex II › Other (MARPOL Annex II)
Issued 4 September 2024
Resolved
If the unloading of a substance of category Y or Z is not carried out in accordance with the Manual, a prewash shall be carried out before the ship leaves the port of unloading, unless alternative measures are taken. The vessel has consistently offloaded drilling mud and stated in their cargo record book that tank stripping did not occur. The Cargo Record Book instructs the master when tank cleaning occurs labeled under section E that a receipt must be obtained. There are no receipts on board of discharges of liquid mud residue cleaning to shore side facilities. MARPOL Annex II Reg. 13.7.1.2
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 4 September 2024
Resolution: Corrected on scene
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 4 September 2024
Resolved
Maintain a ballast water management (BWM) plan that has been developed specifically for the vessel and that will allow those responsible for the plan’s implementation to understand and follow the vessel’s BWM strategy and comply with the requirements of this subpart. The BWM plan states that a specific form shall be used and maintained for 2 years of each ballast water operation, however the crew is not using the provided form and not following the ship specific plan.
33 CFR 151.2050(g)
Action required: 10 - Deficiency Rectified
Resolved 4 September 2024
Resolution: Corrected on scene
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 September 2024
Resolved
Machinery spaces of category A above 500m3 in volume shall, in addition to the fixed fire-extinguishing system requited in paragraph 5.1.1, be protected by an approved type of fixed water-basted or equivalent local application fire-extinguishing system, based on the guidelines developed by the organization. MSC.1/Circ. 1387 section 3.1.6 states “operating instructions for the system should be displayed at each operating position.” The fire control plan on board states the valves outside of the machinery space located in the passageway of the tank farm is a “remote release station” for water mist in the engine room. The instructions are not clear on how to operate the system and the control for the pump starting is located in the forward bow thruster room.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 1 October 2024
Resolution: New instruction plaques installed
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 2 December 2021
Resolved
Fire detection and fire alarm systems shall be kept in good working order. Fire detection panel shows a fault for the port engine smoke detector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 December 2021
Resolution: Fault was corrected by technician and cleared to the satisfaction of attending ABS Surveyor.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 2 December 2021
Resolved
All lifesaving appliances shall be in working order and ready for immediate use. The rescue boat engine would not start. 74SOLAS(20) III/20.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 December 2021
Resolution: The spark plug for the rescue boat engine is to be replaced and the engine tested to the satisfaction of the attending ABS Surveyor.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 2 December 2021
Resolved
Any ship of 400 gross tons and above but less than 10000 gross tons shall be fitted with oil filtering equipment. The oily water seperator was inoperable.
705 - Vsl shall not sail international unitl OWS is operable and IOPP valid.
Action required: 705 - Other - as specified
Resolved 11 January 2022
Resolution: Technition replaced bad sensor and certified OWS. ABS Surveyor witness test of OWS and endorsed IOPP for annual survey. MI accepts technition and ABS report as satisfactory evidence.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 12 January 2021
Resolved
Each embarkation station must be adequately illuminated by lighting supplied from the emergency source of electrical power. Observed two embarkation station lights out on the port side on e-power.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 January 2021
Resolved 12 January 2021
Resolution: Verified by pictures of lights on.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 12 January 2021
Resolved
The means of control of any fixed gas fire extinguishing system shall be ready accessible and operable. The master shall ensure the appropriate tests and inspections of fire extinguishing equipment. Observed emergency generator room fixed CO2 control cylinder that is in need of recharge of control gas. (FSS Code 5.2.1.3.3 & 46 CFR 132.350(a))
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2021
Resolved 12 January 2021
Resolution: Verified by pictures of new control cylinder.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 December 2019
Resolved
Fire doors on 01 deck did not self-close as required by 74 SOLAS 14 (Consolidated) Chapter II-2/9.4.1.1.5.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2019
Resolved 3 December 2019
Resolution: Fire doors properly close.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 2 December 2019
Resolved
An illuminated magnetic steering compass, that can be read at the vessel's main steering stand, was not present. 74 SOLAS 14 (consolidated)/Chapter V, Regulation 19.2.1.1
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 December 2019
Resolved 7 January 2020
Resolution: Magnetic compass light repaired and mirrors in tube cleaned
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo Securing Manual
Issued 2 December 2019
Resolved
Vessel did not have Cargo Securing Manual available for inspection. 74 SOLAS 14/Chapter VI/Regulation 5.6
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 3 December 2019
Resolution: Vessel found Cargo Securing Manual, with ABS approval stamp.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 December 2019
Resolved
Vessel did not have Ballast Water Management Plan, ballast water treatment system approval letter or ballast water records.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 January 2020
Resolved 27 January 2020
Resolution: Vessel rep submitted copy of ballast water recordkeeping log entry.
Electrical › Electric Generation Source (service) › Generator
Issued 14 April 2017
Resolved
Provide proper repairs to port shaft generrator
Action required: 705 - Other - as specified
Due 14 April 2017
Resolved 19 April 2017
Resolution: ABS Rep inspected and test ran stbd shaft generator.