MAURY USCG vessel records Sign in
← All vessels

LADY BERNADETTE III

LADY BERNADETTE III is a 1960 freight ship. The Coast Guard has recorded 45 inspections since 2002, most recently in July 2008, along with 100 deficiencies and 26 operational controls.

Records from 2002 to 2008. Most recent: inspection, 29 July 2008.

Built
1960
Last inspected
29 July 2008
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

5031901 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
E5U2062
Flag
COOK ISLANDS
—
Maury page id
psix-11985

Inspections, by type

…with no type recorded29
Years with a record 7 calendar years (2002–2008)
The 45 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 18 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it259 - Convention (Subpart B), Net Ton
640 - Dead Weight, Ton
259 - Regulatory (Subpart C or D), Net Ton
524 - Convention (Subpart B), Gross Ton
499 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 45

29 July 2008 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3283067
14 July 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3268439
11 July 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3264765
21 April 2008 ISPS I Exam · MARPOL Annex I Examination · PI Safety Exam · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3186801
21 April 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3189033
15 April 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3184859
9 October 2007 Type not recorded
No type recorded · Maritime Safety & Security Team Miami (91114) · Activity 3076588
22 June 2007 Type not recorded
No type recorded · USCGC VALIANT (WMEC 621) · Activity 2974144
21 June 2007 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2969701
19 March 2007 PII Safety Exam · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2890471
23 July 2006 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2722702
29 November 2005 ISPS II Exam · NPV Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2542692
17 October 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2516380
19 September 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2497466
16 September 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2494441
14 August 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2462609
5 July 2005 PII Safety Exam · ISPS I Exam · ISM Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2414988
29 June 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2407707
29 June 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2408091
6 June 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2381879
4 June 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2379007
3 May 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2348178
5 April 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2327366
8 March 2005 PI Safety Exam · Ballast Water Examination · MARPOL Annex I Examination · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2305696
4 March 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2303774
1 March 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2301209
3 December 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2252940
30 November 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2250153
8 November 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2238264
5 November 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2235652
5 October 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2214531
27 August 2004 ISPS I Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2178307
23 August 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2175901
20 August 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2171321
1 July 2004 ISPS II Exam · Random ISPS/MTSA/PSC
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2117483
24 June 2004 Type not recorded
No type recorded · GROUP MIAMI · USCG Southeast District (CGD-SE) · Activity 2109277
26 May 2004 Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2079109
10 May 2004 Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2063663
5 April 2004 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2037502
9 February 2004 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2003074
21 January 2004 Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1989355
18 August 2003 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1879809
3 July 2003 Annual Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1833751
22 July 2002 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1655763
14 May 2002 Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1616915

Deficiency record · 100

Personnel › Certificates/Documents/Licenses › STCW Endorsement
Issued 18 April 2008 Resolved
Chief Engineer and Chief Mate do not have valid Cook Islands Endorsement
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2008
Resolution: Chief Engineer and Chief Mate provided valid licenses and valid Cook Islands endorsement.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 18 April 2008 Resolved
Master does not have a valid Master's license/Cert, GMDSS Certificate of competency, Basic safety course, and Cook Islands endorsement
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2008
Resolution: Master provided valid license, GMDSS certificate, basic safety certificates, and endorsements from Cook Island.
Electrical › Electric Generation Source (emergency) › Generator
Issued 18 April 2008 Resolved
Emergency Generator inoperable. Electrical switchboard failing to provide power for emergency generator start.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2008
Resolution: Emergency Generator operating properly. Crewmembers started E-Generator via electrical switchboard.
Lifesaving › Launching Appliances › Winch
Issued 18 April 2008 Resolved
Winch for rescue boat inoperable, can not deploy rescue boat.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2008
Resolution: Witnessed lowering of rescue boat to water''s edge.
Accommodation/Occupational Safety › Potable Water System › General
Issued 18 April 2008 Resolved
Potable fresh water pump inoperable. Water not able to cycle throughout ship.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2008
Resolution: Verified proper operation of potable water pump. Water sufficiently provided throughout the ship.
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 29 March 2007 Resolved
Emergency firepump inoperable (could not prime).
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 29 March 2007 Resolved
Oily Water Separator inoperable
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Engineering › Steering Gear System › Piping
Issued 29 March 2007 Resolved
Hydraulic leak on helm
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Engineering › Steering Gear System › Rudder
Issued 29 March 2007 Resolved
Port rudder stop chain is broken.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 29 March 2007 Resolved
Tide tables are outdated and need to be replaced.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 29 March 2007 Resolved
Provisions for voyage missing.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 29 March 2007 Resolved
Port anchor inoperable.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 29 March 2007 Resolved
Forward deck lights inoperable.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 29 March 2007
Electrical › Lighting (service) › Lighting Feeder
Issued 29 March 2007 Resolved
Accomidation lighting in crew mess inoperable.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 29 March 2007 Resolved
Vessel has no Chief Engineer.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Documentation › Markings/Placards › Lifejacket Placard
Issued 29 March 2007 Resolved
Port aft lifebuoy placard needs replacing
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 29 March 2007 Resolved
Buoyant line on port aft lifebuoy needs replacing.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Electrical › Electric Supply System (service) › Cable
Issued 29 March 2007 Resolved
Shoretie outlet needs a cover
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 29 March 2007 Resolved
2 crew heads inoperable.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 29 March 2007 Resolved
Smoke detectors throughout vessel inoperable (dead batteries).
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 29 March 2007 Resolved
Fuel fill containment pipe missing plug and threads.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 29 March 2007 Resolved
Port and stbd running lights need hatch covers.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Lifesaving › Rescue Boat › Hull (rigid)
Issued 29 March 2007 Resolved
Fiberglass is exposed on the stem of the rescue boat.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Lifesaving › Rocket Parachute Flares › General
Issued 29 March 2007 Resolved
Vessel missing 01 required parachute flare.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 29 March 2007 Resolved
No hydrostatic dates provided for compressed gas cylinders stored on deck.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Deck/Cargo › Cargo Stowage › General
Issued 29 March 2007 Resolved
Canvas protecting cargo hold is not weathertight.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Operations/Management › Pollution › Control of Discharge of Oil
Issued 29 March 2007 Resolved
Vessel's crane is leaking oil onto the deck
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Construction/Loadline › Structures › Superstructure
Issued 29 March 2007 Resolved
Forward mast supports are wasted away and/or missing
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Construction/Loadline › Structures › Superstructure
Issued 29 March 2007 Resolved
Stbd support fitting on main mast rusted through
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Lifesaving › Launching Appliances › Davit
Issued 29 March 2007 Resolved
Exposed wiring on davit arm of rescue boat crane needs to be secured.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Accommodation/Occupational Safety › Washroom/Toilet › Hot and Cold Running Water
Issued 29 March 2007 Resolved
Vessel has no hot running water.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Documentation › Logs/Records › Enhanced Survey Report File
Issued 29 March 2007 Resolved
Ship missing drydock report.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Deck/Cargo › Cargo Stowage › General
Issued 29 March 2007 Resolved
Crew cargo improperly stowed in forepeak area.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Navigation › Piloting/Steering › Marine Charts
Issued 29 March 2007 Resolved
Ship is missing chart correction log.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Navigation › Piloting/Steering › Notices to Navigation
Issued 29 March 2007 Resolved
Electronic Notice to Mariners receiver is broken.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Navigation › Emergency Steering › Communications to Emergency Steering
Issued 29 March 2007 Resolved
Emergency manuevering directions not on bridge.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Communications › Audible Communications › Horn/Whistle
Issued 29 March 2007 Resolved
Ship's horn is broken.
Action required: 705 - Other - as specified
Due 29 March 2007
Resolved 9 April 2007
Lifesaving › Rescue Boat › Hull (combination rigid/inflated)
Issued 5 July 2005 Resolved
Rescue boat port side sponson valve is broken. Sponson found defated. Rescue boat not availible for rescue. CCSSC code 4.10.2.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 July 2005
Resolution: Vessel mad permanent repiars to rescue boat.
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 5 July 2005 Resolved
Upn questioning the master about the rescue boat, he was unfamiliar with the vessels safety management procedures and his responsiblities. Non conformity was not addressed in the SMS. Procedures not known for reporting the non conformity. Master could not provide proof that a non conformity report was made regarding rescue boat sponson valve.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 July 2005
Resolution: Vessel conducted ISM training.
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 5 July 2005 Resolved
Master thought the company security officer was the designated person ashore. Master not familiar with SMS.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 July 2005
Resolution: Amster received security training.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 5 July 2005 Resolved
Vessel does not have safety management manual . Can not refer to emergency procedures or maintenace needs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 July 2005
Resolution: Vessel has an safety management manual.
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 5 July 2005 Resolved
Vessel has no records that any ISM training has been conducted for the crew
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 July 2005
Resolution: Vessel has ISM records.
Operations/Management › Vessel Safety Management › External Certification/Verification/Control
Issued 5 July 2005 Resolved
Provide safety management certificate and document of compliance with correct place of business address.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 July 2005
Resolution: Vessel provided correct certificates.
Operations/Management › Vessel Safety Management › External Certification/Verification/Control
Issued 5 July 2005 Resolved
USCG OCMI doubts the validity of teh vessels safety management system. USCG requests that the vessels flag administration require a third party audit of the vessels safety management system be conducted
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 July 2005
Resolution: Vessel conducted ISM Audit.
Navigation › Electronic Positioning › GPS/DGPS Receiver
Issued 8 March 2005 Resolved
Radar and GPS inoperable.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2005
Pollution Prevention/Response › Prevention Equipment › Sewage System Tank
Issued 8 March 2005 Resolved
Prove proper operation of sewage system.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 March 2005 Resolved
Exposed wires throghout the machinery spaces and arc welding equipment.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2005
Engineering › Fuel Oil Service System › Piping
Issued 8 March 2005 Resolved
Leaking fuel lines throughout lower engine room.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2005
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 8 March 2005 Resolved
Missing Chief engineer.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2005
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 8 March 2005 Resolved
Excessive oily water found in machinery compartment bildge.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2005
Engineering › Sea-water System (primary cooling) › Pump
Issued 8 March 2005 Resolved
Raw water cooling pump inoperable and pipeing for cooling system running through the firepump.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 June 2005
Accommodation/Occupational Safety › Other Accommodation Spaces › Insect Screen
Issued 8 March 2005 Resolved
Insects found in all Accomidation spaces.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2005
Documentation › Certificates/Documents
Issued 19 May 2004 Resolved
NO SHORE BASED PROGRAMS FOR SAFETY RADIO CERTIFICATE. LEGACY COMPONENT DESC: Cargo Ship Safety Radio Certificate
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Personnel › Training
Issued 19 May 2004 Resolved
[name withheld], TWO STCW TRAINING CERTIFICATES: ADVANCED FIRE FIGHTING, PERSONAL SURVIVAL AT SEA. LEGACY COMPONENT DESC: Fire Fighting Advanced
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Personnel › Training
Issued 19 May 2004 Resolved
COOK NEEDS STCW TRAINING. LEGACY COMPONENT DESC: Watchkeeping
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Documentation › Logs/Records
Issued 19 May 2004 Resolved
MIssing recepits for plastics transfering ashore LEGACY COMPONENT DESC: Garbage Recordkeeping
Due 19 June 2004
Resolved 7 June 2004
Resolution: Plastic not transferred, still held aboard ship.
Communications › Radio Communications
Issued 19 May 2004 Resolved
Missing call sign in GMDSS station LEGACY COMPONENT DESC: GMDSS
Due 19 June 2004
Resolved 7 June 2004
Fire Fighting › Structural - A Class Divisions
Issued 19 May 2004 Resolved
Ensure ladderway to the piolet house has class "A" boundry door leading to GMDSS room. LEGACY COMPONENT DESC: Openings - Fire Doors
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Navigation › Piloting/Steering
Issued 19 May 2004 Resolved
Ensure that all marine charts are valid. LEGACY COMPONENT DESC: Marine Charts
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Lifesaving › Line-Throwing Appliances
Issued 19 May 2004 Resolved
Need new line throwing devices
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Resolution: Two valid line throwing devices on board.
Construction/Loadline › Structures
Issued 19 May 2004 Resolved
boiler exhaust stack has holes. Have class address. renew structure LEGACY COMPONENT DESC: Superstructure
Due 19 July 2004
Resolved 7 June 2004
Fire Fighting › Fire Main
Issued 19 May 2004 Resolved
Missing check valve for firemain overboard LEGACY COMPONENT DESC: Valves
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Fire Fighting › Structural - A Class Divisions
Issued 19 May 2004 Resolved
Boundries in engine room do not meet A-class boundry LEGACY COMPONENT DESC: Bulkheads - Machinery Spaces
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Fire Fighting › Structural - A Class Divisions
Issued 19 May 2004 Resolved
A-class boundries are not met in galley have flag address repairs. Also address need for insulation LEGACY COMPONENT DESC: Bulkheads - Main Galleys
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Construction/Loadline › Structures
Issued 19 May 2004 Resolved
Class address holes in captains cabin adjacent to main deck. LEGACY COMPONENT DESC: Superstructure
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Construction/Loadline
Issued 19 May 2004 Resolved
Provide full description of last two dry docks by class society. LEGACY COMPONENT DESC: DRY DOCK DATES
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 June 2004
Deck/Cargo › Cargo Transfer (solid)
Issued 10 May 2004 Resolved
VSL is required not to load or unload or engage in any cargo operations until U.S. coast guard conducts a complete exam of the VSL.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2004
Operations/Management › Vessel Safety Management
Issued 10 May 2004 Resolved
VSL did not have enough personnel to properly man a inport bridgewatch according to STCW sec. (A) reg. VIII. LEGACY COMPONENT DESC: Emergency Preparedness
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2004
Deck/Cargo › Cargo Stowage
Issued 10 May 2004 Resolved
Cargo which is currently loaded is loaded improperly (blocking escape routes and ladder ways)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2004
Construction/Loadline › Structures
Issued 10 May 2004 Resolved
The vessel's pilot house has wood covering the decks which are covered by carpeting and the ovhd and blkhds have wood and are covered by sheet metal. Remove all wood as this is not a proper structural fire boundary. LEGACY COMPONENT DESC: piolot house construction
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2004
Construction/Loadline › Hull
Issued 9 February 2004 Resolved
Replace all wasted steel by port side door on main deck. Have flag state rep attest to proper repair.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 5 April 2004
Fire Fighting › Structural - A Class Divisions
Issued 21 January 2004 Resolved
Interior spaces within vsls Pilot House are lined with unapproved combustible material (plywood). CCSSC3.16.3.1 LEGACY COMPONENT DESC: Bulkheads - Sanitary Spaces
Action required: 705 - Other - as specified
Due 22 February 2004
Resolved 5 April 2004
Personnel › Training
Issued 18 August 2003 Resolved
Master and Chief Mate did not know how to use the vessel's GMDSS. Test and prove proper operation of GMDSS. LEGACY COMPONENT DESC: GMDSS
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2003
Personnel › Certificates/Documents/Licenses
Issued 18 August 2003 Resolved
Chief Mate does not have a flag state endorsement for his GMDSS license. Provide a flag state endorsement or application for endorsement. LEGACY COMPONENT DESC: License, GMDSS Radio Operator
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2003
Documentation › Certificates/Documents
Issued 18 August 2003 Resolved
Have the flag state rep. address the validity of the Loadline and Tonnage certificates due to vessel configuration changes i.e. installation of a steel wheelhouse and permanently affixed cargo crane. LEGACY COMPONENT DESC: International Load Line Certificate
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2003
Documentation
Issued 15 July 2003 Resolved
Provide surveyors report attesting to completion of installation of new steel wheelhouse prior to departure from next U.S. port call.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 21 October 2003
Documentation › Manuals/Policy Documentation
Issued 15 July 2003 Resolved
Provide approved stability book with updated information and calculations from tests conducted after completion of steel wheelhouse prior to departure from next U.S. port call. LEGACY COMPONENT DESC: Stability Instructions
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 21 October 2003
Operations/Management
Issued 3 July 2003 Resolved
Provide surveyors report addressing completion of all items issued by surveyor on 12MAY03.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 July 2003
Resolved 15 July 2003
Operations/Management
Issued 3 July 2003 Resolved
Provide Flag State surveyors report addressing wooden pilot house.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Operations/Management
Issued 3 July 2003 Resolved
Provide proof from Flag State surveyor that main engine is only 300 Horsepower.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Fire Fighting › Fire Main
Issued 3 July 2003 Resolved
Permanently repair fire main where holed on main deck port side midships. LEGACY COMPONENT DESC: Condition
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Lifesaving › Rescue Boat
Issued 3 July 2003 Resolved
Replace retro-reflective tape on rescue boat with SOLAS approved tape. LEGACY COMPONENT DESC: Markings
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Construction/Loadline › Penetrations
Issued 3 July 2003 Resolved
Replace gasket material in hatch to forecastle. LEGACY COMPONENT DESC: Gasket
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Operations/Management › Drills/Instruction
Issued 3 July 2003 Resolved
Translate all emergency instructions and oil transfer procedures to working language of crew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Fire Fighting › Fire Main
Issued 3 July 2003 Resolved
Repair leaks on main fire pump and at main discharge line in way of bulkhead.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Engineering › Fuel Oil Storage/Transfer System
Issued 3 July 2003 Resolved
Provide proper piping from main generator day tank to main generator. LEGACY COMPONENT DESC: Piping
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Engineering › Diesel Engine (propulsion-direct drive)
Issued 3 July 2003 Resolved
Prove operation of main engine.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Navigation › Piloting/Steering
Issued 3 July 2003 Resolved
Repair rudder angle indicators so both bridge and steering gear room reflect proper angle.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 3 July 2003 Resolved
Provide means of securing fuel service tank between tank and day tank and from generator day tank to service tank.
Due 3 July 2003
Resolved 3 July 2003
Operations/Management › Drills/Instruction
Issued 3 July 2003 Resolved
Conduct Fire Drill in presence of USCG. LEGACY COMPONENT DESC: Fire
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 July 2003
Operations/Management › Drills/Instruction
Issued 3 July 2003 Resolved
Conduct abandon ship drill in presence of USCG. LEGACY COMPONENT DESC: Abandon Ship
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Fire Fighting › Fire Pumps
Issued 3 July 2003 Resolved
Demonstrate operation of main and emergency fire pumps with sufficient hose pressure. LEGACY COMPONENT DESC: Pressure
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 July 2003
Stability › Intact Stability (when using lifting gear)
Issued 3 July 2003 Resolved
Provide approved stability book and have Flag State surveyor address need to include current configuration with crane on deck. Current stability book is not approved and does not include measurements with crane. LEGACY COMPONENT DESC: Stability book
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2003
Navigation › Piloting/Steering
Issued 3 July 2003 Resolved
Provide updated deviation table upon completion of steel wheelhouse construction. LEGACY COMPONENT DESC: Deviation Table/Graph
Action required: 705 - Other - as specified
Resolved 8 August 2003
Documentation › Certificates/Documents
Issued 14 May 2002 Resolved
Provide COFR prior to 15MAY02 @1400 hours. LEGACY COMPONENT DESC: Certificate of Financial Responsibility
Action required: 705 - Other - as specified
Due 15 May 2002
Resolved 3 July 2003
Documentation › Certificates/Documents
Issued 14 May 2002 Resolved
Provide temp. Load Line certificate. LEGACY COMPONENT DESC: International Load Line Certificate
Action required: 17 - Rectify deficiencies prior to departure
Due 14 May 2002
Resolved 3 July 2003
Documentation › Safety/Response Plans/Programs
Issued 14 May 2002 Resolved
Provide towing plan to MSO Miami to include ships conditions, identify tugs and towing package/arrangement prior to towing operation. Ensure this is submitted in a timely manner. LEGACY COMPONENT DESC: Towing Plan
Action required: 17 - Rectify deficiencies prior to departure
Due 14 May 2002
Resolved 3 July 2003
Documentation › Certificates/Documents
Issued 14 May 2002 Resolved
Provide "Bill of Sale" and any/all current certificates (i.e. application for registation) ASAP. In addition, provide yard info (name, address and phone number) and contract. LEGACY COMPONENT DESC: Bill of Sale/All Certificates
Action required: 17 - Rectify deficiencies prior to departure
Due 14 May 2002
Resolved 3 July 2003
Documentation › Certificates/Documents
Issued 14 May 2002 Resolved
Provide Owner, Operator and surveyor name, address and phone numbers prior to 1430 hours 14MAY2002. LEGACY COMPONENT DESC: Owner/Operator
Action required: 705 - Other - as specified
Due 14 May 2002
Resolved 3 July 2003
Pollution Prevention/Response › Prevention Equipment
Issued 14 May 2002 Resolved
Remove all oil from bilges and maintain ship in dry condition.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 May 2002
Resolved 3 July 2003

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.