Records in 2014. Most recent: inspection, 28 March 2014.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Inspection history · 7
28 March 2014
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4824700
18 March 2014
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4818025
17 March 2014
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4818101
16 March 2014
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4816790
16 March 2014
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4824679
15 March 2014
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5766561
13 March 2014
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4811193
Engineering › Diesel Engine (propulsion-direct drive) › Pump, High Pressure (fuel injection)
Issued 18 March 2014
Resolved
1410-Propulsion Main Engine- The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship is safe to proceed to sea without danger to the ship or persons onboard. Vessel experienced a propulsion loss due to a sticking puncture valve on NR4 fuel injection pump.
Action required: 705 - Other - as specified
Due 18 March 2014
Resolved 18 March 2014
Resolution: Received and accepted class report from KRS attesting to the renewal and operational testing of new puncture valve on NR4 fuel injection pump.
Engineering › Engine Controls (Electric/Electronic) › Circuit Board
Issued 18 March 2014
Resolved
1410-Propulsion Main Engine-The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship is safe to proceed to sea without danger to the ship or persons onboard. Vessel received a low piston cooling oil press alarm and slow down alarm. Problem could not be identified. See narrative for details. SOLAS 74a I/11.
Action required: 705 - Other - as specified
Due 18 March 2014
Resolved 18 March 2014
Resolution: Received tech report stating problem could not be recreated. All alarms tested satisfactorily. Amended COTP requiring tug assistance during outbound transit.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 13 March 2014
Resolved
2420 - Change-over Procedures - Ships using separate fuel oils to comply w/ paragraph 4 of this reg. shall carry a written procedure showing how the fuel oil changeover is to be done. PSCO observed that Chief Engineer did not have written procedure for HS to LS changeover. Action plan approved by company w/ concurrence from flag attesting to proper written procedures. - MARPOL Annex VI 14/6
Due 27 March 2014
Resolved 28 March 2014
Resolution: Received documentation from Panama Maritime Authority satisfying requirement.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 13 March 2014
Resolved
0715- Detection- Maintenance, testing and inspections, shall be carried out based on the guidelines developed by the Organization. Smoke detector test was being conducted with a blow torch. Chief showed proof of submitting requisition form for testing aid and still has not received it. Submit new requisition form and provide proof of receiving tester on board. - SOLAS(a) II-2/14.2.2.1
Due 13 April 2014
Resolved 28 March 2014
Resolution: Received documentation from Panama Maritime Authority satisfying requirement.
Operations/Management › Navigation Safety › Arrival/Departure Tests
Issued 13 March 2014
Resolved
0936 - Steering Gear - 12 hours before entering or getting underway in the U.S the operation of the main steering gear shall be tested on alternative power. Vessel was not familiar w/ U.S regulation to test steering gear by means of alternative supply. Provide corrective action plan approved by company w/ concurrence from flag attesting to test procedures. - SOLAS(a) V/26 33 CFR 164.25(a)(1)(iii)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 March 2014
Resolved 28 March 2014
Resolution: Received documentation from Panama Maritime Authority satisfying requirement.
Operations/Management › Pollution › Control of Discharge of Oil
Issued 13 March 2014
Resolved
1720 - Control of Discharge of Oil - Transfer pipe system must not leak under static liquid pressure at least 1.5 times the maximum allowable working pressure. Vessel could not provide documentation of hydrostatic test for bunkering lines. Provide proper documentation of conducting a hydrostatic test. - 33 CFR 156.170
Action required: 705 - Other - as specified
Due 13 March 2014
Resolved 28 March 2014
Resolution: Received documentation from Panama Maritime Authority satisfying requirement.