SUPPORT is a 2012 passenger vessel (inspected). The Coast Guard has recorded 8 inspections since 2018, most recently in June 2026, along with 4 deficiencies.

Records from 2018 to 2026. Most recent: inspection, 23 June 2026.

Built
2012
Last inspected
23 June 2026
Documentation
Case Pending · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 23 June 2026
Operational controls None recorded without a removal date
Years with a record 8 calendar years (2018–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDK7370
1211014
Flag
UNITED STATES
Maury page id
psix-1211014

Documentation record

Registered dimensions (L × B × D)47.0 ft × 12.0 ft × 4.0 ft
Registered tonnagegross 18 / net 18
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGAUDET'S ALUMINUM BOATS LLC · SORRENTO, LA, UNITED STATES · built 2012
Hull materialAluminum
PropulsionGasoline Outboard
Hull shapeBox
Hull configurationMonohull
Hailing portKALAMA, WA
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationCase Pending · issued 24 June 2025 · expires 30 June 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it18 - Simplified, Gross Ton
18 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 8

23 June 2026 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8418785
23 June 2025 DAPI Audit · Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8162212
24 June 2024 COI Inspection · Drydock Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7938598
23 June 2023 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7720954
22 June 2022 Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7482963
17 July 2020 Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7145858
21 May 2019 COI Inspection · Hull Examination · Simplified Stability Test
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6697031
3 December 2018 Construction Oversight
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6592774

Deficiency record · 4

07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 June 2024 Resolved
46 CFR 181.500(b) - Table 181.500(b) of this section indicates the minimum required classification for each space listed. Portable extinguisher installed in the accommodation space was a 1-A 10 B:C. Replace with a 2-A extinguisher or larger and provide evidence to the marine inspector.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2024
Resolved 2 July 2024
Resolution: Owner provided photo evidence of new extinguisher that meets the minimum requirements of the regulation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 June 2024 Resolved
46 CFR 182.520(a)(7) - A submersible electric bilge pump may be used as a power bilge pump required by Table 182.520(a) only on a vessel of not more than 19.8 meters (65 feet) in length carrying not more than 49 passengers, other than a ferry, provided that: A positive shutoff valve is installed at the hull penetration. Bilge lines for all compartments did not have positive shutoff valves installed in line. Install positive shutoff valves and provide evidence of such to the marine inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2024
Resolved 2 July 2024
Resolution: Owner provided photo evidence of positive shut off valves installed at shell penetrations of each bilge line.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 24 June 2024 Resolved
46 CFR 184.420(a)(3) - As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: Coast Guard Light List. The light list on-board was dated 2019. Place updated Light List on-board and provide evidence of such to the marine inspector.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2024
Resolved 2 July 2024
Resolution: Owner provided photo evidence of up to date light list on-board.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 22 June 2022 Resolved
46 CFR 181.420: A pre-engineered fixed gas fire extinguishing system must be able to automatically shutdown all power ventilation systems and provide an audible alarm that sounds upon discharge. VSL does not have a preengineered system with a functioning ventilation shutdown or audible alarm. Provide ventilation shutdown and audible alarm.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 5 July 2022
Resolution: Operator submitted video evidence of ventilation shutdown and visible/audible alarm at operating station upon simulating discharge of installed pre-engineered firefighting system.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.