Records from 2016 to 2017. Most recent: inspection, 30 November 2017.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 August 2016
Resolved
Vessel must navigation lights that compliance with Navigation rules as required by 46 CFR 183.420. Repair inoperable red running light.
Due 29 August 2016
Resolved 23 August 2016
Operations/Management › Drills/Instruction › Not Conducted
Issued 23 August 2016
Resolved
Crew training shall be logged or documented for review by the Coast Guard when requested as required by 46 CFR 185.420. Provide proof of quarterly training conducted by the crew.
Due 29 August 2016
Resolved 26 August 2016
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 23 August 2016
Resolved
Emergency instruction must be mounted at the operating station as required by 185.510
Due 29 August 2016
Resolved 26 August 2016
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 19 August 2016
Resolved
Missing bolts on the rear axle must be corrected as required by 46 CFR 176.800. Missing 2 bolts on the rear axle cover. Install in-kind bolts.
Due 29 August 2016
Resolved 26 August 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 15 August 2016
Resolved
Engine turbo loacated close to FGFE heat sensor must be insulated as required by 46 CFR 176.830. Insulate engine turbo charger.
Due 29 December 2016
Resolved 23 August 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 August 2016
Resolved
All cables and wires must be installed with metal support spacer of not more than 24 inches as required by 46 CFR 183.340. Install wire supports through out the vessel.
Due 29 August 2016
Resolved 23 August 2016
Engineering › Steering Gear System › Hand Pump
Issued 15 August 2016
Resolved
Vessel must be provided with an auxiliary means of steering as required by 46 CFR 182.620. Show proper operation of the auxiliary steering.
Due 29 August 2016
Resolved 26 August 2016
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 15 August 2016
Resolved
Show proper oepration of the installed Higgins bilge pump as required by 46 CFR 182.520
Due 29 August 2016
Resolved 23 August 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 15 August 2016
Resolved
All oil leaks must be corrected as required by 46 CFR 176.830. Repair oil leak from oil level stick on the engine.
Due 29 August 2016
Resolved 26 August 2016
Stability › Watertight Integrity › Weathertight Enclosure
Issued 15 August 2016
Resolved
Hatch exposed to weather must be watertight as required by 46 CFR 179.360. Replace deteriorated gaskets on engine room hatch and void forward of engine room.
Due 29 August 2016
Resolved 26 August 2016
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 9 August 2016
Resolved
Vessel must have permanent Freeboard marks on both sides as required by stability letter. Re- paint the Freeboard marks.
Due 19 August 2016
Resolved 26 August 2016