Records from 2012 to 2026. Most recent: inspection, 19 March 2026.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCONRAD SHIPYARD LLC · MORGAN CITY, LA, UNITED STATES · built 2012
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 28 April 2026 · expires 30 April 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
19 March 2026
Administrative Inspection · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8328625
26 March 2025
Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8100022
18 August 2024
Examination of Repairs · Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7984020
9 January 2024
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7845270
16 June 2023
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7716469
25 October 2022
Internal Structural Exam · Drydock Exam · Examination of Repairs · COI Inspection · Cargo Tank Internal · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7581592
3 September 2022
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7552730
3 September 2022
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7588750
28 October 2020
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7083383
9 September 2019
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6807172
16 May 2019
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6684959
7 May 2019
Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6678985
23 January 2019
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6614093
13 October 2017
MTSA Verification · COI Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6286664
8 December 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6052986
20 July 2015
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5176469
21 July 2014
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4924766
31 October 2013
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4743786
7 August 2013
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4676805
17 October 2012
Construction Oversight · Internal Structural Exam · Hull Examination · Drydock Exam · Initial Certification · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4466156
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 May 2019
Resolved
#1 Port Cargo tank outboard blkhd has damage in way of 02 cracks of less than 1 inch. Cargo Seeped into the adjacent void. Provide marine chemist certification that affected tanks are gas free and safe for entry for further evaluation. Permanent repairs are to be made prior to loading cargo in the #1 Port Cargo tank.
46 CFR 32.60-5
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2019
Resolution: Dye Penetrant testing of Cargo Tank Weld Repairs
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 23 January 2019
Resolved
46CFR31.10-17a.Vessel must undergo an annual inspection within 3 months before or after each anniversary date. Vessel went beyond 3 months of anniversary date before undergoing annual inspection. A valid COI was not maintained.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 January 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 23 January 2019
Resolved
46CFR31.05-1 COI for tank vessels shall be appropriately endorsed, and such endorsement shall serve as a permit for vessel to operate. Vessel was conducting cargo operations with an invalid COI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 January 2019
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 23 January 2019
Resolved
46CFR35.35-70(b) Cargo pump relief valves shall be tested at least once each year. The cargo pump relief valves were not tested annually.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 January 2019
Resolution: NICHOLAS RAY provided proof that the cargo pump relieve valves were tested on 24JAN2019.
Documentation › Manuals/Policy Documentation › Company Action Plan (SIP)
Issued 8 December 2016
Resolved
Vessel did not have a benzene program to mitigate exposure. Provide benzene program prior to loading cargoes with more than %5 benzene.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 December 2016
Resolved 8 December 2016
Resolution: Vessel rep was able to locate a digital copy of the program on the tug towing the vessel. The rep printed out that plan and placed it on the barge.