MAURY USCG vessel records
← All vessels

HERCULES

HERCULES is a 2012 offshore supply vessel. The Coast Guard has recorded 4 inspections in 2023, along with 10 deficiencies and 2 operational controls.

Records in 2023. Most recent: operational control imposed, 15 March 2023.

Built
2012
Last inspected
15 March 2023
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 2016.

Inspection record

Last inspected 15 March 2023
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 1 calendar year (2023)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9483047
1215995
Flag
MEXICO
Maury page id
psix-1215995

Documentation record

Tonnage as PSIX records it4860 - Convention (Subpart B), Gross Ton
774 - Displacement, Ton
3144 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 4

15 March 2023 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7651717
15 March 2023 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7654595
7 March 2023 MARPOL Annex I Examination · PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7644216
30 January 2023 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7630907

Deficiency record · 10

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 9 March 2023 Resolved
15109 - The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations, and with any additional requirements which may be established by the company. Due to the objective evidence detailed in the below deficiencies, the vessel is not in substantial compliance with the relevant conventions, calling into question the adequacy and implementation of the vessel's SMS under the ISM code. An external audit conducted by the Flag or RO is required to determine whether the ship is operating in accordance with the ISM Code. Provide a copy of the completed audit report to USCG prior to departure from port. 74 SOLAS (20) IX / REG 3.1 ISM A/10.1 30ABC
Action required: 30 - Ship detained
Resolved 15 March 2023
Resolution: DNV auditor issued 04 NC ISM due 13JUN23.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 9 March 2023 Resolved
01315 - Any discharge into the sea of oil or oily mixtures from ships of 400 GT and above shall be prohibited. PSCO discovered that only 02 OCM entries were made for the year 2022, both exceeding the max throughput as indicated on the IOPP form A. The certificate indicates the OWS should not have a throughput exceeding 1 cubic meter per hour. The first oil record book (ORB) entry from 10MAY22 indicates the OWS was operated from 1900 to 2230 GMT with 5 cubic meters overboard, a rate of 1.42 cubic meters per hour. The second entry in the ORB from 24MAY22 indicates the OWS was operated from 1130 to 1150 GMT with 0.5 cubic meters overboard a rate of 1.50 cubic meters per hour. MARPOL ANNEX I / REG 15.3 30ABC
Action required: 30 - Ship detained
Resolved 15 March 2023
Resolution: DNV auditor issued 04 NC ISM due 13JUN23. ORB issue addressed through ISM audit.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 9 March 2023 Resolved
01315 - Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the ORB part I, so that all entries in the book appropriate to that operation are completed. PSCO discovered the following issues (a-d): (a) 05 entries are missing for the use of the oily water separator as per the ORB and OCM data (74.3hrs unaccounted for). ORB entries not found in OCM: 10MAY22 and 24MAY22. OCM entries not found in ORB: 20APR22, 12DEC22, 27JAN23. (b) All ORB entries for the offload of oily waste in 2022 did not match the offload receipts provided by the vessel. (c) 26 offloads in drums of waste oil are not logged in the ORB and corresponding receipts were provided by the vessel. (d) ORB does not include any weekly sounding of the sludge settling tank as required. MARPOL ANNEX I / REG 17.4 30ABC
Action required: 30 - Ship detained
Resolved 15 March 2023
Resolution: DNV auditor issued 04 NC ISM due 13JUN23. ORB issue addressed through ISM audit.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 9 March 2023 Resolved
14104 - Oil filtering equipment referred in paragraph 1 of his regulation shall be of a design approved by the administration… PSCO discovered a drain line forward of the three-way valve before overboard discharge valve. As per ships drawing, no such drain line exists. MARPOL ANNEX I / REG 14.6 30ABC
Action required: 30 - Ship detained
Resolved 15 March 2023
Resolution: Valve removed. Class approved survey
01 - Certificates & Documentation › 011 - Ships Certificates › International Oil Pollution Prevention (IOPP)
Issued 9 March 2023 Resolved
01117 - An IOPP certificate shall be issued; after an initial or renewal survey in accordance with the provisions of regulation 6 of this annex. PSCO discovered inaccuracies regarding sludge tanks found on the vessel. Both the IOPP and Ship's Arrangements plan lists 04 sludge tanks: PSCO and crew were unable to locate sludge settling tank. MARPOL ANNEX I / REG 7.1 30 ABC
Action required: 30 - Ship detained
Resolved 15 March 2023
Resolution: IOPP updated to reflect unused tank
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 9 March 2023 Resolved
07126 - Means shall be provided to control leaks of flammable liquids. PSCO discovered diesel fuel oil leak on #1, #2, and #3 SSDG forward engine pipe fittings. PSCO observed an approximate rate of one drop per three seconds, creating excessive risk for main space fire. PSCO also observed lube oil pipe leak on port azimuthing thruster. 74SOLAS(2009) II-2 / REG 4.1.1 30 ABC
Action required: 30 - Ship detained
Resolved 15 March 2023
Resolution: All leaks have been repaired as per Class survey
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 March 2023 Resolved
13104 - An efficient bilge pumping system shall be provided capable of pumping from and draining any watertight compartment... PSCO observed bilge pump leaking through the shaft seal at an approximate rate of one cup per minute. 74SOLAS (2004) II-1 / REG 21.1.1 17ABC
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2023
Resolution: New bilge pump installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 March 2023 Resolved
13108 - Associate piping systems and fittings shall be of a design and construction adequate for the service. PSCO observed the following leaks and unauthorized repairs (a-h): (a) Soft patches found and actively leaking on potable water pipe above #2 and #3 SSDG. (b) Active leak found on hydrophore pump II. Forward of #3 SSDG. (c) Soft patch found on the flange to hydrophore pump I . (d) Steady water leak coming from the pipe flange inboard/aft of #4 SSDG. (e) Soft patch found on the potable water pipe above MSD forward port side engine room. (f) Soft patch found on the waterline to RO aft of bulkhead pump room. (g) Repair on fire hydrant #30 pipe aft ballast manifold space. (h) Pipe clamps missing on port azimuthing thruster oil pipes. 74SOLAS (2004) II-1 / REG 26.1 17ABC
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2023
Resolution: All repairs approved by Class.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 March 2023 Resolved
02108 - All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. PSCO observed unsecured electrical connections to the motor control junction box for the A and B cooling standby pumps. 74SOLAS (2004) II-1 / REG 45.1.3 17ABC
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2023
Resolution: All repairs approved by Class survey
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 9 March 2023 Resolved
01310 - The placard required by paragraph (a) of this section must be printed in the language of the crew. PSCO observed “discharge of oil prohibited” placard is in English and the official language of the crew is Spanish. 33CFR155.450 (c) 40ABC
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 March 2023
Resolution: New Spanish language signed installed.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.