Records from 2018 to 2026. Most recent: inspection, 21 March 2026.
Inspection history · 7
21 March 2026
PSC B · Administrative Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8313460
11 March 2024
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7873620
13 October 2021
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7327560
19 October 2020
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7079863
28 September 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7067232
31 March 2019
ISPS II Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6652831
18 January 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6339708
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 11 March 2024
Resolved
All lifesaving appliance and arrangements shall comply iwht the applicable requirements of the Code. The engine shall be capable of operating for not les than 5 minutes after starting from cold with the lifeboat our of the water. PSCO observed freefall lifeboat engine did not operate for more than 5 minutes after starting from cold.
74SOLAS(20) III/34
LSA Code 4.4.6.3
10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 March 2024
Resolution: Crew was able to start lifeboat from cold and the engine remained operational for more than 5 minutes.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 11 March 2024
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed rescue boat engine was not able to start.
74 SOLAS(20) III/ 20.2
10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 11 March 2024
Resolution: The crew conducted repairs and were able to start the rescue boat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 11 March 2024
Resolved
The machinery, associated piping systems and fittings shall be designed and constructed adequatly for the service for which they are intended and shall be so installed and protected aas to reduce to a minimum any danger to persons on board. PSCO observed a jacket water leak on the #1 cylinder of the M/E.
74 SOLAS (09) II-2/26.1
40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 3 April 2026
Resolution: PSC inspection found no leaks on #1 cylinder
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 11 March 2024
Resolved
Means shall be provided to control leaks of flammable liquids. PSCO observed oil soaked lagging on the high pressure fuel line going from the M/E fuel pump to the fuel distributon manifold.
74 SOLAS (09) II-2/ 4.1.1
40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 21 March 2026
Resolution: PSCO found no oil soaked lagging on
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 11 March 2024
Resolved
Means shall be provided to control leaks of flammable liquids. PSCO observed a fuel oil leak on the high presure fuel supply line on the #4 cylinder of the #1 D/G.
74 SOLAS(09) II-2/4.1.1
10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 March 2024
Resolution: Crew conducted repairs to stop the fuel oil leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 October 2020
Resolved
The machinery, boilers, and other pressure vsls, associated piping, systems and ftitings shall be of a design and construction adequate for intended service. It was reported by Pilot as the vsl was maneuvering out of anchorage that there was a propulsion irregularity. Demonstrate operational reasiness of main diesel engine to satisfaction of certifiate issuing authority. 60 a,c
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 22 October 2020
Resolved 20 October 2020
Resolution: Received Class Report from BV attesting to fuctionality of main engine. Tested all Sat.