PAC SEGINUS is a 2012 freight ship. The Coast Guard has recorded 32 inspections since 2016, most recently in January 2026, along with 12 deficiencies and 6 operational controls.
Records from 2016 to 2026. Most recent: inspection, 16 January 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it21094 - Convention (Subpart B), Gross Ton 10246 - Convention (Subpart B), Net Ton 27725 - Dead Weight, Ton 38361 - Displacement, Ton 21094 - Regulatory (Subpart C or D), Gross Ton 10246 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 32
16 January 2026Explosive Handling Operation-Commercial
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8294859
4 April 2025Explosive Handling Operation-Commercial
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8096751
10 March 2025PSC B
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 8091063
12 September 2024Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8001419
12 September 2024Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8003981
27 August 2024MARPOL Annex I Examination
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7986785
26 March 2024MARPOL Annex I Examination
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7885031
14 November 2023MARPOL Annex I Examination
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7824421
25 May 2023PSC B
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7691975
8 September 2022Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7554188
26 January 2022Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7386327
12 January 2022Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7379182
25 July 2021PSC B
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7262454
14 July 2021PSC B
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7253242
25 February 2021MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7146142
24 February 2021Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7152721
23 February 2021PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7144400
1 October 2020Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7069181
14 September 2020PSC B
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7047749
27 April 2020PSC B
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6941753
2 December 2019PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6861823
10 July 2019Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6744618
4 July 2019Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6735249
10 June 2019Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6711937
8 November 2018ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6574494
29 May 2018Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6427891
29 May 2018Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6428193
26 July 2017ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6219451
14 July 2017Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6207452
25 February 2017Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 6095731
13 June 2016ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5905751
17 February 2016Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5817193
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 July 2021Resolved
Electrical equipment and wiring shall not be fitted in enclosed cargo spaces. However, if electrical equipment is fitted in such spaces, it shall be of a certified safe type. PSCO obeserved multiple explosion proof lighting fictures in cargo area with cracked or missing covers and with water inside covers.
74 SOLAS (04) II-2/19.3.2
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 25 October 2021
Resolved 12 January 2022
Resolution: To the satifaction of the Coast Guard
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 27 April 2020Resolved
02199 Efficient Guard rails or bulwarks shall be fitted to all exposed parts of the freeboard and superstructure decks. PSCO observed guard rails on the port side main deck and the engine room were broken and corroded. ICLL (88) I/25 40 A/C
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 April 2020
Resolved 2 September 2020
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 27 April 2020Resolved
0710 The purpose of this regulation is to contain a fire in the space of origin. The divisions shall be maintained at the openings and penetrations. PSCO observed a penetration in the cable trunk room without insulation to maintain proper fire boundary compromising the fire integrity of the space. 74 SOLAS (14) II-2 9.1.3 10C
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 27 April 2020
Resolved 27 April 2020
Resolution: Satisfactory to the attendig PSCO.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 27 April 2020Resolved
04103 During preparation and launching, the survival craft, its launching appliances and the area of the water into which it is to be launched shall be adequately illuminated by lighting supplied from the emergency source of electrical power. PSCO observed the emergency embarkation flood light next to the rescue boat inoperable. 74 SOLAS (14) III/16.7 10C
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 27 April 2020
Resolved 27 April 2020
Resolution: Satisfactory to the attending PSCO.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 27 April 2020Resolved
15109 The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea. PSCO noted a quick closing valves on the fuel oil day tank that was modified. Provide concurrence from class to the acceptance of this arrangement. 74 SOLAS (04) I/11(a) 40A/C
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 April 2020
Resolved 2 September 2020
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 April 2020Resolved
07199 The purpose of this regulation is to prevent ignition of combustible material or flammable liquids. PSCO noted a gasoline tank from the rescue boat stored near the boiler in the engine room . 74 SOLAS (14) II-2 4.1.5 10C
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 27 April 2020
Resolved 27 April 2020
Resolution: Satisfactory to the attending PSCO.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 April 2020Resolved
15109 The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea. PSCO noted the supply valve for jacket water cooling was modified on the #2 SSDG. 74 SOLAS (04) I/11 (a) 40 A/C
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 April 2020
Resolved 2 September 2020
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 2 December 2019Resolved
07111 - Fire protection systems and fire-fighting systems and appliances shall be maintained and ready for use. PSCO noted gage on SCBA with 2 screws loose. SCBA was used in fire drill. Ship is required to have 3 fireman suits onboard. This SCBA was removed from service. Ship in compliance w/ fire control plan w/ 3 additional SCBA onboard. *Note: Crew repaired guage onboard, but replacement ordered.
74 SOLAS 04 con. II-2/14.1
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 2 December 2019
Resolved 2 December 2019
Resolution: Removed from ready service. Crew disassembled gauge and replaced screws, but Captain stated replacement would be ordered.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 8 November 2018Resolved
07123-Operation of Fire Protection Systems-PCSO observed valve on water mist system secured. During expanded exam, pump was leaking and motor controller kept tripping during examination, not operating as designed. SOLAS 74 (2014) II-2/14.2.1.2
Action required: 17 - Rectify deficiencies prior to departure
Due 8 November 2018
Resolved 10 November 2018
Resolution: Received class report from ABS attesting to rectification of above deficiency.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 8 November 2018Resolved
11129-PCSO observed during testing of lifeboat engine, that primary power source was unable to start engine. SOLAS 74 (2014) III/20.2
Action required: 17 - Rectify deficiencies prior to departure
Due 8 November 2018
Resolved 10 November 2018
Resolution: Received class report from ABS attesting to rectification of above deficiency.
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Action required: 10 - Deficiency Rectified
Due 8 November 2018
Resolved 8 November 2018
Resolution: Crew had inventory of washers and was able to rectify deficiency on the spot.
Fire Fighting › Fixed Fire Detection System › Flame Detectors
Issued 26 July 2017Resolved
0715- Maintenance, testing and inspections shall be carried out based on the guidelines developed by the Organization and in a manner having due regard to ensuring the reliability of fire fighting systems and appliances. PSCO obsevered inoperable flame detector over number 3 generator.Vessel crew replaced the flame detector and conducted a successful operational test.SOLAS74(2014 con)II-2/14.2.2.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 July 2017
Resolved 26 July 2017
Resolution: Vessel crew replaced the flame detector over Number 3 generator and were able to demonstrate successful operation.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.