← All vessels
ALMI SKY
ALMI SKY is a 2012 tank ship. The Coast Guard has recorded 9 inspections since 2015, most recently in February 2023, along with 2 deficiencies and 1 operational control.
Records from 2015 to 2023. Most recent: inspection, 13 February 2023.
- Built
- 2012
- Last inspected
- 13 February 2023
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 2 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9579523 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
D5CQ7
1221211
Flag
LIBERIA
—
Maury page id
psix-1221211
Inspections, by type
The 9 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it84216 - Convention (Subpart B), Gross Ton
49805 - Convention (Subpart B), Net Ton
182527 - Displacement, Ton
157787 - Dead Weight, Ton
49805 - Convention (Subpart B), Net Ton
182527 - Displacement, Ton
157787 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 9
13 February 2023
Administrative Inspection · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7635955
14 May 2022
Administrative Inspection · Deficiency Check · PSC B · COC-TVE Renew
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7445310
13 May 2022
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7445449
10 May 2022
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7448027
14 January 2021
COC-TVE Renew · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7121525
6 June 2019
ISPS II Exam · Ballast Water Examination · COC-TVE Annual
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6704941
6 June 2018
COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6422171
7 November 2016
Ballast Water Examination · ISPS II Exam · COC-TVE Annual
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6032375
14 August 2015
COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 5212657
Deficiency record · 2
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 14 May 2022
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids; and ignition sources shall be separated from combustible materials and flammable liquids. PSCO observed an open bucket of oil and a bucket of oily rags behind the electrical panel in the purifier room and observed an oil pan full of oil under the #3 generator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 May 2022
Resolved
The machinery, boiler and other pressure vessels shall be of a design and construction adequate for the service for which they are intended and shall be installed and protected as to reduce to a minimum any danger. PSCO observed water spraying from the cooling system on the number 4 cylinder of the MDE.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.