Records from 2016 to 2021. Most recent: inspection, 27 July 2021.
Inspection history · 45
27 July 2021
Ballast Water Examination · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7268610
4 June 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7215308
7 May 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7191865
5 May 2021
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7190145
5 May 2021
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7191577
14 April 2021
Administrative Inspection · In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7175359
14 April 2021
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7205579
8 April 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7171009
12 March 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7154854
14 February 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7140579
10 February 2021
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7138810
20 January 2021
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7132869
18 January 2021
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7126114
15 January 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7124973
12 January 2021
PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7122903
18 December 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7113587
19 November 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7098664
23 October 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7082767
24 September 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7064328
29 August 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7045222
31 July 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7021195
5 July 2020
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6993696
11 May 2020
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6951681
19 March 2020
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6928951
14 February 2020
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6909298
6 January 2020
ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6883265
20 December 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6875445
29 November 2019
PII Safety Exam · ISPS III Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6862324
25 November 2019
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6862301
4 November 2019
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6848671
14 May 2019
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6683648
29 April 2019
ISPS III Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6672552
13 December 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6596961
13 December 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6598896
10 December 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6594693
2 February 2018
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6348294
30 January 2018
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6344815
18 January 2018
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6338244
7 December 2017
Deficiency Check · ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6318268
6 December 2017
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6319945
5 December 2017
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6318244
6 March 2017
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6099335
20 October 2016
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6026156
6 October 2016
NPV Safety Exam · ISPS II Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6017251
4 October 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6016242
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 14 April 2021
Resolved
74 SOLAS (04) III/31.1.2.2- In lieu of paragraph 1.1, cargo ships may carry one or more inflatable or rigid liferafts, on each side of the ship, of such aggregate capacity as will accommodate the total number of persons on board. Port side life rafts spontaneously inflated and fell in water. Vessel does not have enough life rafts to meet total capacity on either side, or to meet what is required on their certificate.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 April 2021
Resolved 16 April 2021
Resolution: Vessel sent in documentation to clear deficiency
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 20 January 2021
Resolved
Vessel reported that their radar was inoperable leaving Sector Delaware Bay. Repairs to be made in port.
Action required: 10 - Deficiency Rectified
Due 22 January 2021
Resolved 21 January 2021
Resolution: Repaired by technician. Report attached.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 18 January 2021
Resolved
Each vessel of 10,000 gross tons or more must have, in addition to the radar system under 164.25(a), a second marine radar system that operates indepenently of the first. Vessel's S-Band radar is inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 February 2021
Resolved 20 January 2021
Resolution: Received, reviewed and approved technician report attesting to repair and full operation of S band Radar.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 29 April 2019
Resolved
All items of rescue boat equipment, with the exception of boat hooks, shall be stowed within the rescue boat. Rescue boat inventory is stowed in a locked within super structure.
74 SOLAS (2014 CONS) III/ 32.3
LSA Code 5.1.2.1
40A
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 May 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 29 April 2019
Resolved
Guard rails or bulwarks shall be fitted around all exposed cargo decks. Cargo handling platforms were found to be missing fall protection.
ICLL 66 25 (2)
50A
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2019
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 29 April 2019
Resolved
Electrical installations shall be such that electrical services essential for safety shall be ensured under various emeergency conditions. Two (02) emergency light fixtures were found broke and zip tied on STBD side, forward, near the forecastle and deck workshop.
74SOLAS (2004 CONS) II-1/ 40.1.2
50A
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2019
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 29 April 2019
Resolved
General arrangement plans shall be permenantly exhibited for the guidance of the ship's officers, showing clearly each deck, the control station, the various fire sections enclosed by "A" class divisions, "B" class divisions, togeter with particulars of the fire detection and fire alarm systems. The doors to the cable and locker space on the poop deck were not fitted with the proper "A" or "B" class door as required on the fire control plan.
74SOLAS (2004 CONS) II-2/15.2.4.1
50A
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2019
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 10 December 2018
Resolved
30ac- The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. In meeting these requirements, the company should ensure that appropriate corrective action is taken. The company's protracted response to requisitions led to a culture of work-arounds in lieu of appropriate corrective measures. Nearly all light fixtures had only one of two bulbs despite a two month old requisition. Repair parts have rendered doors nearly inoperable.
The company's protracted response to requisitions led to a culture of work-arounds in lieu of appropriate corrective measures. Nearly all light fixtures had only one of two bulbs despite a two month old requisition. Repair parts have rendered doors nearly inoperable. The safety management system should include procedures ensuring that non conformities, accidents and hazardous situations are reported to the company, investigated and analyzed with the objective of improving safety and pollution prevention. Five quick closing fuel valves were circumvented rather than serviced for proper operation. Any non-conformity is reported, with its possible cause, if known. All on deck fire-fighting hose boxes had faulty closures and were lashed shut with rope. The company should establish procedures for the implementation of corrective action, including measures intended to prevent recurrence. Two engine room EEBDs were not properly charged despite the vessel having received detainable deficiencies for engine room EEBDs 12 months ago. The SMS should provide for measures ensuring that the company's organization can respond at any time to hazards, accidents and emergencies involving ships. Crew did not produce non Tank Vessel Response Plan for two hours when requested.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 12 December 2018
Resolution: received flag report attesting to safety management system.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 10 December 2018
Resolved
Crew members shall be trained to be familiar with the arrangements of the ship as well as the location and operation of any fire-fightingsystems and appliances that they may be called upon to use. During the fire fighting drill: firefighters did not secure SCBA mask to face allowing air to escape; fire hose was tangled in a ball; lifeline handlers did not respond o fire fighters' line commands. The crew was given time to practice fire fighting before performing a second fire drill. Crew demonstrated adequate performance. 74SOLAS(2009) II-2/15.2.2.1
Action required: 10 - Deficiency Rectified
Resolved 10 December 2018
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 December 2018
Resolved
No change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the Administration. The sight glass for the freshwater tank in the steering gear space was leaking at a rate of 1 drop per 5 seconds. A makeshift containment was installed. 74SOLAS(2014) Ch I Reg 1.1b
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 December 2018
Resolution: Accepted BV class report attesting that the valve was repaired.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 10 December 2018
Resolved
Fire fighting systems and appliances shall be kept in good working order and readily available for immediate use. All hose boxes on weather decks have been lashed closed. Multiple hose boxes have deteriorated closure devices. 74SOLAS(2009) II-2 reg 14.2.1.2
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 December 2018
Resolution: Accepted flag report attesting that all rope lashings have been removed and 03 new hose boxes have been ordered.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 10 December 2018
Resolved
The minimum fire integrity of bulkheads and decks shall be as prescribed in tables 9.5 and 9.6. The emergency escape door in the engine room is lodged in the frame and is separating. 74SOLAS(2009) Ch II-2 Reg 9.2.3.3.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 December 2018
Resolution: Accepted BV class report attesting to the door was repaired.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 10 December 2018
Resolved
Electrical installations shall be such that electrical services essential for safety will be ensured under various emergency conditions. Multiple emergency lights in the engine room, house, and on deck are not operational. 74SOLAS(2004) Ch II-1 Reg 40.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 December 2018
Resolution: Accepted BV class report attesting that all emergency lighting was repaired.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 December 2018
Resolved
the condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. 2 of the provision reefer doors have severely deteriorated locking mechanisms making the doors extremely difficult or impossible to open. 74SOLAS(2014) Ch I Reg 11a
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 December 2018
Resolution: Accepted BV class report attesting that the door handles were overhauled.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 10 December 2018
Resolved
Every lifeboat shall consist of a food ration totaling not less than 10,000kj for each person the lifeboat is permitted to carry; these rations shall be kept in airtight packaging and stowed in a watertight container. Vessel has only 20 pieces of adequate food rations on board a lifeboat rated for 28. 74SOLAS(2014) Ch III Reg 13.1.4 LSA 4.4.8.12
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 December 2018
Resolution: Accepted BV class report attesting that the vessel recieved 10 food rations.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 December 2018
Resolved
Protective clothing of material to protect the skin from the heat radiating from the fire and from burns and scalding by steam. During the fire drill, it was observed that the fire team's skin was exposed while wearing the firefighting outfits.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 December 2018
Resolution: Accepted BV class report attesting that the vessel placed on board new FF helmets.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 10 December 2018
Resolved
30ac- Oil fill pipes shall be fitted with a cock or valve directly on the tank capable of being closed from a safe position outside the space in the event of a fire occurring in the space in which the tanks are situated. 5 quick closing valves have been disabled using fabricated devices or bolts.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 12 December 2018
Resolution: Accepted BV class report attesting to the function of the quick closing devices.
Engineering › Generator (propulsion/auxiliary-electric) › Winding
Issued 7 December 2017
Resolved
Each emergency generating set arranged to be automatically started shall be equipped with starting devices approved by the administration with a stored energy capable of at least three consecutive starts. A second source of energy shall be provided for an additional three starts within 30 min unless manual starting can be demonstrated to be effective. At the time of inspection, the PSCO found only one operable source of stored energy capable of starting the emergency generator. The secondary means employed by the vessel through a manual cranking system was not operable. 74SOLAS (2014) CH II-I / REG 44.2
Action required: 705 - Other - as specified
Due 7 February 2018
Resolved 2 February 2018
Resolution: Received Class Report attesting to the successful repairs made to ships Emergency Diesel Generator.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 7 December 2017
Resolved
On all ships, within the machinery spaces, emergency escape breathing devices shall be situated ready for use at easily visible places which can be reached quickly and easily at any time in the event of a fire. It was found that five out of the eleven EEBDs required on the ships fire control plan had no charge. 74SOLAS (2014) CH II-2 / REG 4.3.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 January 2018
Resolution: Vessel provided proper documentation and inspection report regarded the EEBD's.
Fire Fighting › Nozzles › Condition
Issued 7 December 2017
Resolved
Each hose shall be provided with a nozzle and the necessary coupling. Two fire station hoses were missing nozzles. 74SOLAS (2014) II-2 / REG 10.2.3.2.3.1.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 2 January 2018
Resolution: Received invoice from ship's Captain attesting to the purchase of necessary fire nozzles.
Operations/Management › Vessel Safety Management › Company Responsibilities/Authority
Issued 7 December 2017
Resolved
In meeting the requirements of 10.1, the Company should ensure that: appropriate corrective action is taken. A requisition for the parts to fix the emergency generator was submitted to the company on 04 DEC 2017 and is still outstanding. The five out of eleven empty EEBDs were made aware to the company on 29 NOV 2017 via email from the contractor servicing the vessel’s EEBDs. A requisition for the two missing fire hose nozzles was submitted to the company shortly after the drydock preformed in October 2017. The vessel was allowed by the company to make multiple port calls with no communicated expected delivery date of supplies necessary to repair vital systems. Recommend the company conduct an internal audit. 74SOLAS (2014) IX / 3.1 ISM 10.2.3 / 12.3 / 12.7
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 January 2018
Resolution: Received internal audit report from ship's Captain detailing the steps taken to ensure proper implementation of SMS.
Deck/Cargo › Holds/Tanks › Ventilation Air Intake
Issued 6 October 2016
Resolved
74 SOLAS (14 Cons)II-2 Reg 19.3.4.2 - 1160 - Suitable wire mesh guards shall be fitted over inlet and otlet ventilation openings. Cargo hold 3 and 4 inlet ventilation openings are deterioted.
Action required: 705 - Other - as specified
Due 20 October 2016
Resolved 20 October 2016
Lifesaving › Lifebuoys › Quantity
Issued 6 October 2016
Resolved
74Solas (14Cons) III/Reg32.1.1 - 0650 - Vessels 150 and under 200 meters are requried to have a minimum of 12 lifebuoys. The vessel is carrying 11 lifebuoys.
Action required: 705 - Other - as specified
Due 20 October 2016
Resolved 20 October 2016
Lifesaving › Lifebuoys › Size
Issued 6 October 2016
Resolved
74 SOLAS (14Cons) 111 Reg.7.1.1 LSA Code 2.1.1.8 Code 0650 Lifebuoys must be fitted with a grabline not less than 9.5 MM in diameter. The grablines on 11 lifebuoys are dry rotted.
Action required: 705 - Other - as specified
Due 20 October 2016
Resolved 20 October 2016