MAURY USCG vessel records
← All vessels

THEA MARIE

THEA MARIE is a 2013 passenger vessel (inspected). The Coast Guard has recorded 18 inspections since 2016, most recently in July 2026, along with 27 deficiencies and 2 operational controls.

Records from 2016 to 2026. Most recent: inspection, 17 July 2026.

Built
2013
Last inspected
17 July 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

WDH3737
1226807
Flag
UNITED STATES
Maury page id
psix-1226807

Inspections, by type

…with no type recorded1
Years with a record 11 calendar years (2016–2026)
The 18 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Documentation record

Registered dimensions (L × B × D)49.0 ft × 31.0 ft × 8.0 ft
Registered tonnagegross 31 / net 31
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderRICHARD BROCHU · LAKE WORTH, FL, UNITED STATES · built 2013
Hull materialFRP (Fiberglass)
PropulsionGasoline Outboard
Hull shapeShip
Hull configurationTwin Hull
Hailing portPALM BEACH, FL
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational
DocumentationValid · issued 3 August 2026 · expires 30 September 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it31 - Simplified, Gross Ton
31 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.

Inspection history · 18

17 July 2026 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8440599
6 July 2025 Type not recorded
No type recorded · Station Lake Worth Inlet · USCG Southeast District (CGD-SE) · Activity 8177252
21 April 2025 Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8111788
12 March 2025 Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8092504
22 August 2024 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7986662
6 September 2023 Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7785991
6 March 2023 Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7646127
28 July 2022 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7518374
10 August 2021 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7282232
11 May 2021 Drydock Exam · Deficiency Check · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7194095
9 March 2020 DAPI Audit · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6923032
6 August 2019 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6774688
26 April 2019 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6671072
5 July 2018 Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6467147
23 August 2017 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6249313
15 May 2017 DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6146338
17 May 2016 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5879329
15 March 2016 Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5868224

Deficiency record · 27

10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 11 August 2021 Resolved
Port side navigation running light inoperable. Repair/replace light. 46 CFR 183.420
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 August 2021
Resolution: Running light repaired.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 11 August 2021 Resolved
Port hull bilge high water audible alarm inoperable. Repair audible alarm. 46 CFR 182.530
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2021
Resolved 24 August 2021
Resolution: Alarm operates SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 August 2021 Resolved
Port steering ram hydraulic hose kinked at fitting. Replace hose. 46 CFR 182.610
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2021
Resolved 24 August 2021
Resolution: Hose replaced.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 11 August 2021 Resolved
Automatic bilge pump visual alarms for both hulls inoperable. Repair/replace visual alarms. 46 CFR 182.520
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2021
Resolved 24 August 2021
Resolution: Alarms operate SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 June 2020 Resolved
Port hull automatic bilge pump and visual indicator inoperable. Repair automatic bilge pump and alarm to the satisfaction of marine inspector. 46 CFR 182.530(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2020
Resolved 31 July 2020
Resolution: Pump and alarm operate SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2020 Resolved
Life-ring lifeline weathered and non-serviceable. Replace lifeline with at least 60 feet of approved line. 46 CFR 180.70(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 July 2020
Resolved 31 July 2020
Resolution: Lifeline replaced.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 8 August 2019 Resolved
Stbd side steering ram hydaulic line kinked at fitting allowing water intrusion and possible loss of fluid. Repair prior to credit dry-dock. 46 CFR 182.610(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2019
Resolution: Hose replaced.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 8 August 2019 Resolved
Make repairs to port quarter inboard section of hull. 46 CFR 176.610
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 August 2019
Resolution: 7 sheets of FRP added at questionable area.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 8 August 2019 Resolved
Install stanchion to support overhead at stbd quarter embarkation station. 46 CFR 176.610
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 September 2019
Resolution: Stanchion installed SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 8 August 2019 Resolved
Secure all hand rails. 46 CFR 177.900
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 August 2019
Resolution: Rails secured.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 8 August 2019 Resolved
Provide securing devices/attachments to watertight deck hatches. 46 CFR 179.360
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 August 2019
Resolution: Cables attached.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 1 May 2019 Resolved
Prove proper operation of the bilge high level audible and visual alarms. 46 CFR 182.530()
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2019
Resolution: Bilge high level alarms SAT.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 1 May 2019 Resolved
Prove proper operation of automatic bilge pumps visual alarms. 46 CFR 182.530(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2019
Resolution: Auto bilge pump visual alarms SAT.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 1 May 2019 Resolved
Prove proper operation of fire detection alarm for port side hull. 46 CFR 177.410(c)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2019
Resolution: Fire detection alarms SAT.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 1 May 2019 Resolved
Replace expired EPIRB hydro-static release. 46 CFR 185.740
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2019
Resolution: EPIRB hydro-static release replaced.
01 - Certificates & Documentation › 013 - Documents › Ship specific plans for the recovery of persons from the water
Issued 1 May 2019 Resolved
Post emergency instructions. 46 CFR 185.510-512
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2019
Resolved 6 May 2019
Resolution: Emergency instructions posted.
09 - Working and Living Conditions › 092 - Working Conditions › Fitness for duty - intoxication
Issued 1 May 2019 Resolved
Provide Management Information System (MIS) report. 46 CFR 16.201
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2019
Resolved 6 May 2019
Resolution: MIS report provided.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 1 May 2019 Resolved
Provide drill log with proof of quarterly drills conducted. 46 CFR 185.520-524
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2019
Resolved 6 May 2019
Resolution: Drill log provided and drills conducted.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 1 May 2019 Resolved
Provide EPIRB maintenance log with proof of monthly checks. 46 CFR 185.728
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 May 2019
Resolved 6 May 2019
Resolution: EPIRB log provided.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 5 July 2018 Resolved
Alarm not operable
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 July 2018
Resolved 6 July 2018
Resolution: Repaired to satisfaction of CG
Construction/Loadline › Hull › Side Shell
Issued 23 August 2017 Resolved
Repair small chip in FRP amidship, STBD side above the water line.
Action required: 705 - Other - as specified
Resolved 28 August 2017
Resolution: Repaired dings in FRP.
Fire Fighting › Fixed Fire Detection System › Detector/Call Point Grouping
Issued 15 May 2017 Resolved
Replace fire detector in storage room/head.
Action required: 705 - Other - as specified
Resolved 5 June 2017
Resolution: Installed new detector.
Communications › Radio Communications › EPIRB
Issued 15 May 2017 Resolved
Replace hydrostatic release for epirb.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2017
Resolution: Installed new hydro.
Documentation › Certificates/Documents › FCC SSL
Issued 15 May 2017 Resolved
Provide current FCC SSL.
Action required: 705 - Other - as specified
Resolved 5 June 2017
Resolution: Provided current FCC SSL.
Navigation › Piloting/Steering › US Coast Pilot
Issued 15 May 2017 Resolved
Provide Coast pilot for operating area.
Action required: 705 - Other - as specified
Resolved 5 June 2017
Resolution: Provided Coast pilot.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 15 May 2017 Resolved
Provide List List.
Action required: 705 - Other - as specified
Resolved 5 June 2017
Resolution: Provided light list.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 15 May 2017 Resolved
Update expired items in first aid kit.
Action required: 705 - Other - as specified
Resolved 5 June 2017
Resolution: Updated items in first aid kit.

Ownership record