← All vessels
ADRE
ADRE is a freight ship. The Coast Guard has recorded 6 inspections since 2017, most recently in May 2025, along with 7 deficiencies and 1 operational control.
Records from 2017 to 2025. Most recent: inspection, 4 May 2025.
- Built
- Not recorded
- Last inspected
- 4 May 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 7 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9575199 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
9V8641
1229162
Flag
LIBERIA
—
Maury page id
psix-1229162
Inspections, by type
The 6 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it35812 - Convention (Subpart B), Gross Ton
63301 - Dead Weight, Ton
21224 - Convention (Subpart B), Net Ton
63301 - Dead Weight, Ton
21224 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 6
4 May 2025
PSC B
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 8123944
10 April 2025
Deficiency Check · PSC B
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8100125
12 March 2024
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7878046
10 July 2023
PSC B
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 7727145
16 August 2019
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6776215
14 December 2017
PII Safety Exam · ISPS III Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6318719
Deficiency record · 7
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 April 2025
Resolved
74 SOLAS II-1/32.5 Amended Boilers shall be provided with means to supervise and control the quality of the feedwater. Suitable arrangements shall be provided to preclude, as far as practicable, the entry of oil or other contaminants which may adversely affect the boiler; vessel’s cascade tank has fuel oil intrusion. Tank must be free from petroleum products and prima facia evidence must be provided that waterside of boiler is free from petroleum products.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 April 2025
Resolved
74 SOLAS Amended II-2/10.5.6.2 Machinery spaces of category A above 500 m3 in volume shall, in addition to the fixed fire-extinguishing system required in paragraph 5.1.1, be protected by an approved type of fixed water-based or equivalent local application fire-extinguishing system; vessel’s hypermist system failed to operate in incinerator and purifier room when tested by PSCO and Flag State Inspector.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 April 2025
Resolved
74 SOLAS Amended II-2/4.1 means shall be provided to control leaks of flammable liquids; several leaks on main engine, #2 Generator and fuel boost pump for main engine in purifier room.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 10 April 2025
Resolved
74 SOLAS Amended III/20.2 Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use; crew was unable to keep rescue boat running when directed by PSCO to start.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 April 2025
Resolved
74 SOLAS Amended II-1/26.7 Provision shall be made to facilitate cleaning, inspection and maintenance of auxiliary machinery; Engine room crew was unable to open incinerator door when directed by PSCO
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 10 July 2023
Resolved
74 SOLAS (14) II-2/2.1.1
THE MAIN INLET AND OUTLET OF ALL VENTILATION SYSTEMS SHALL BE CAPABLE OF BEING CLOSED FROM OUTSIDE THE SPACED BEING VENTILATED. THE MEANS OF CLOSING SHALL BE EASILY ACCESSIBLE AS WELL AS PROMINENTLY AND PERMANENTLY MARKED AND SHALL INDICATE WHETHER THE SHUT-OFF IS OPEN OR CLOSED.
PSCO OBSERVED 02 VENTILATION DAMPERS TO NOT BE CAPABLE OF BEING FULLY CLOSED FOR THE EMERGENCY GENERATOR ROOM VENTILATION SYSTEM.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 10 July 2023
Resolved
74 SOLAS (20) I/11(a)
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD.
PSCO OBSERVED REFRACTORY WITHIN INCINERATOR TO HAVE LARGE SECTIONS MISSING.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.