Records from 2016 to 2026. Most recent: inspection, 6 May 2026.
Documentation record
Registered dimensions (L × B × D)177.9 ft × 34.0 ft × 13.5 ft
Registered tonnagegross 97 / net 66
ITC dimensions (L × B × D)177.9 ft × 34.0 ft × 13.5 ft
ITC tonnagegross 487 / net 146
BuilderHALIMAR SHIPHARD LLC · MORGAN CITY, LA, UNITED STATES · built 2015
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portGALLIANO, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 24 April 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it97 - Regulatory (Subpart C or D), Gross Ton
487 - Convention (Subpart B), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
146 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
6 May 2026
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8320107
29 April 2026
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8320096
18 June 2025
Appeal · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8163109
8 April 2025
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8106223
29 May 2024
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7912455
17 May 2024
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7912164
14 March 2023
Internal Structural Exam · Drydock Exam · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7648795
25 April 2022
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7436027
23 March 2021
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7161525
11 March 2021
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7154041
9 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7108890
7 April 2020
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6936286
21 March 2019
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6646461
13 March 2019
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6641573
16 August 2018
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6513580
8 March 2018
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6368615
5 April 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6118494
27 March 2017
Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6117105
23 June 2016
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5921299
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 8 April 2025
Resolved
Vessel must have an interconnected fire system in all enclosed areas routinely accessed by passengers and crew. Crew staterooms were found without fire detectors,audible and visual alarms within each crew quarters.
46 CFR 181.405 // 46 CFR 181.450
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 21 May 2025
Resolved 22 October 2025
Resolution: Vessel representative sent evidence that detectors and audible/ visual alarms installed in the staterooms.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 April 2025
Resolved
Fire pumps on vessels must be outfitted with a pressure gauge at the pump outlet. Fire pump on vessel did not have a functioning gauge to accurately measure pressure.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 22 April 2025
Resolved 8 April 2025
Resolution: Cleaned pipe to gauge tested sat.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 8 April 2025
Resolved
Vessels must be equipped with radio's capable of DSC. VHF radio was found without MMSI number entered, rendering it without DSC capabilities.
47 CFR 80
47 CFR 80.901 (3)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 22 April 2025
Resolved 8 April 2025
Resolution: Vessel owner entered MMSI number into radio and tech connected GPS, restoring DSC capabilities.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 23 March 2021
Resolved
Vessels over 400 gross tons (domestic or international) are required to have an approved non-tank vessel response plan. Vessel does not have an approved plan. Provide evidence of application or approved plan.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 April 2021
Resolved 9 April 2021
Resolution: Vessel representative submitted an application for Non-Tank Vessel Response Plan. Satisfactory to MI.