Records from 2016 to 2025. Most recent: inspection, 26 February 2025.
Inspection history · 5
26 February 2025
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8075147
20 October 2021
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7329936
13 March 2021
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7155458
18 June 2017
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6159366
10 March 2016
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5826108
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 26 February 2025
Resolved
THE LIFERAFT SHALL BE PACKED IN A CONTAINER THAT IS:...AS FAR AS PRACTICABLE WATERTIGHT, EXCEPT FOR DRAIN HOLES IN THE CONTAINER BOTTOM. PSCO OBSERVED PATCHES MADE TO THE PORT SIDE OUTBOARD LIFERAFT IMPACTING ITS WATERTIGHT INTEGRITY.
LSA 4.2.6.1.3
74SOLAS(20)III/34
17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 9 March 2025
Resolved 1 March 2025
Resolution: Liferaft repaired with an OEM approved patch procedure carried out by the crew IAW OEM. Class attended to observe efficacy of repair and attested to its satisfaction.
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 26 February 2025
Resolved
EVERY SHIP SHALL BE PROVIDED WITH RADIO INSTALLATIONS CAPABLE OF COMPLYING WITH THE FUNCTIONAL REQUIREMENTS PRESCRIBED BY REGULATION 4 THROUGHOUT ITS INTENDED VOYAGE. PSCO OBSERVED MF/HF RADIO INSTALLATION REPAIRS WERE NOT TO THE SATISFACTION OF FLAG DISPENSATION LETTER AND GMDSS LOGS DID NOT ACCURATELY REFLECT MALFUNCTION OF EQUIPMENT.
74SOLAS(20)IV/6.1
17ac
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 9 March 2025
Resolved 1 March 2025
Resolution: A RINA approved radio technician attended the vessel to attest to the repairs to the MF/HF radio.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 February 2025
Resolved
ELECTRICAL INSTALLATIONS SHALL BE SUCH THAT: THE SAFETY OF PASSENGERS, CREW AND SHIP FROM ELECTRICAL HAZARDS WILL BE ENSURED. PSCO OBSERVED TWO GROUNDING WIRES AND A DEGRADED GROUNDING WIRE ON VENTILATION MOTORS ON THE STERN OF THE VESSEL.
74SOLAS(20)II-1/40.1.3
10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 26 February 2025
Resolved 26 February 2025
Resolution: Grounding wires were added and fixed on the spot at time of inspection.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 26 February 2025
Resolved
SANITARY ACCOMODATION SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS:...COLD FRESH WATER AND HOT FRESH WATER AVAILABLE IN ALL SPACES. PSCO OBSERVED BROWN UNSANITARY HOT AND COLD WATER FROM FAUCETS IN BOTH PILOT ACCOMODATION SPACE AND HOSPITAL SPACE.
74USC70002
ILO p.37/21(c)
50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 March 2025
Resolved 1 March 2025
Resolution: A RINA surveyor attended the vessel to observe the issues of brown unsanitary water in the accomodation and hospital space. It was determined that the water needed to run for approximately one minute before it would run clear.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 February 2025
Resolved
CYLINDERS MUST ALWAYS BE SECURED AND, WHEN NOT IN USE, THEY MUST BE STOWED IN A RACK IN AN UPRIGHT POSITION, WITH THE VALVE PROTECTION CAP IN PLACE. PSCO OBSERVED 07 ACETYLENE BOTTLES MISSING VALVE PROTECTION CAPS.
46CFR147.60.b.1
10c
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 26 February 2025
Resolved 26 February 2025
Resolution: Valve protection caps were put on 07 cylinders at time of inspection.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 10 March 2016
Resolved
1099- Safety General. The machinery shall be of design and construction adequate for the service and shall be so installed and protected as to reduce to a minimumu any danger to persons onboard. PSCO observed exhaust gas leak from exhaust pipe on top of EDG when starting and running EDG. 74 SOLAS (2014) II-1 26.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 March 2016
Resolved 15 March 2016
Resolution: Received, reviewed and accepted class report from China [name withheld] attesting to repairs of EDG exhaust. Expansion joint on exhaust was cracked. Repaired with weld on crack. Tested with no leak detected.