Records from 2017 to 2025. Most recent: inspection, 12 February 2025.
Inspection history · 5
12 February 2025
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8072078
19 November 2020
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7090986
10 October 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6549915
17 March 2017
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6101109
25 January 2017
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6065731
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 12 February 2025
Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the Oil Record Book Part I, so that all entries in the book appropriate to that operation are completed. PSCO observed missing entry in Oil Record Book Part I and was unable to verify with daily soundings due to them being unavailable. Transfer occured between 26JAN25 and 02FEB25 from the lube oil drain tank. MARPOL Annex I/17.4, Rectify deficiency prior to next U.S. port after sailing foreign, Code 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 February 2025
Resolved 14 February 2025
Resolution: Recieved flag state report attesting to the satisfactory rectification of deficiency.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 November 2020
Resolved
07109- FIRE PROTECTION SYSTEMS AND FIRE-FIGHTING SYSTEMS AND APPLIANCES SHALL BE MAINTAINED READY FOR USE. PSCO'S IDENTIFIED 02 CO2 BOTTLE HOSES KINKED, TWISTED, AND WORN THROUGH TO INNER CORE. 74SOLAS(09)II-2/14.1.1-17ac
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 19 November 2020
Resolved 20 November 2020
Resolution: The two damaged hoses are now replaced with like to like spare parts onboard and examined. On satisfactory completion, it is considered CO2 system in operation condition.
Lifesaving › Rescue Boat Equipment › Paddle/Oar
Issued 25 January 2017
Resolved
0616-Rescue Boat Inventory: All life saving appliances shall be in working order. Rescue boat oars showed significant wear and cracking. 74 SOLAS(14)III/20.2; LSA 5.1.2.2.1; 50ac
Action required: 705 - Other - as specified
Due 24 February 2017
Resolved 17 March 2017
Resolution: On board verification of oars on board the rescue boat was conducted. New oars provided to the vessel.
Engineering › Bilge Water Management System › Valve
Issued 25 January 2017
Resolved
1499-Other: The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons aboard. The cargo ballast line valve located in the engine room in the vicinity of the OWS labeled "line 2" was missing. 74 SOLAS(14)I/11.a; 50ac
Action required: 705 - Other - as specified
Due 24 February 2017
Resolved 17 March 2017
Resolution: Onboard verification of the ballast line was conducted. Crew fitted the ballast line with a new valve on the cargo ballast line.
Construction/Loadline › Markings › Load Line Mark
Issued 25 January 2017
Resolved
1220-Freeboard Marks: Load lines and deck line shall be painted in white or yellow on a dark ground. The deck line was not painted white or yellow and was same color as the hull. ICLL I/8; 16c
Action required: 705 - Other - as specified
Due 8 February 2017
Resolved 17 March 2017
Resolution: On board verification of the load line was conducted. Verified load line was painted a contrasting color from the hull.