Records from 2019 to 2026. Most recent: inspection, 24 June 2026.
Documentation record
Registered dimensions (L × B × D)250.0 ft × 57.0 ft × 20.0 ft
Registered tonnagegross 2,830 / net 2,049
ITC dimensions (L × B × D)250.0 ft × 57.0 ft × 20.0 ft
ITC tonnagegross 2,499 / net 1,117
BuilderBOLLINGER SHIPYARDS LOCKPORT LLC · AMELIA, LA, UNITED STATES · built 2019
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portGALLIANO, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 28 March 2026 · expires 30 April 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it374696 - Dead Weight, Ton
54564 - Displacement, Ton
2499 - Convention (Subpart B), Gross Ton
2830 - Regulatory (Subpart C or D), Gross Ton
1117 - Convention (Subpart B), Net Ton
2049 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
24 June 2026
Administrative Inspection · Periodic Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8405313
12 May 2026
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8367311
10 October 2025
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8255775
24 April 2025
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8118302
23 July 2024
Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7964865
15 April 2024
Administrative Inspection · COI Inspection · MARPOL Annex II Examination · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7881081
27 February 2024
Drydock Exam · Internal Structural Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7870528
22 June 2023
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7720540
10 June 2022
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7473457
22 February 2022
Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7400281
25 March 2021
Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7162503
9 November 2020
Plan Review (Other than "T") · Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7092405
1 June 2020
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6965750
6 December 2019
Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6868615
4 December 2019
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6886153
1 February 2019
MTSA/ISPS Verification · Administrative Inspection · Hull Examination · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6643206
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 24 April 2025
Resolved
Cargo tank relief-valve settings shall be a minimum of 0.02MPa gauge (2.9 PSI). Cargo tank relief-valve on board for #03 Port methanol tank was set to 2.5 PSI. Cargo tank relief-valve shall be set to a minimum of 2.9 PSI IAW IBC Code/ approved company mitigation plan prior to the carriage of methanol.
Action required: 705 - Other - as specified
Due 24 April 2025
Resolved 10 October 2025
Resolution: The relief-valve setting was changed to the correct pressure, 2.9 PSI.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 24 April 2025
Resolved
Owners and operators of applicable vessels shall provide clear and conspicuous signs on board the vessel notifying the crew of the presence of video and audio surveillance equipment. At the time of attendance required conspicuous signage was not present. Crew posted adequate signage prior to MI departure. 46 USC 4901(d)
Action required: 10 - Deficiency Rectified
Due 24 April 2025
Resolved 24 April 2025
Resolution: Crew posted adequate signage prior to MI departure.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 22 June 2023
Resolved
Each fixed fire-extinguishing system installed must comply wiht part 95 of this chapter. CO2 Room smelled of wintergreen odorizer. Provide servicing report for evidence of repair.
46 CFR 132.310(c)
Action required: 17 - Rectify deficiencies prior to departure
Due 22 June 2023
Resolved 22 June 2023
Resolution: Received CO2 wintergreen odorizer maintenance report from vessel rep.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 22 June 2023
Resolved
Each generator arranged for parallel operation must have reverse power trips. Port generator reverse power was INOP. ABS verified operation, sat.
46 CFR 111.12-11(f)
Action required: 10 - Deficiency Rectified
Due 22 June 2023
Resolved 22 June 2023
Resolution: ABS witnessed reverse power relay operation.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 22 June 2023
Resolved
Each vessel with watertight doors must be made watertight. Port side bridge wing was not watertight. Repairs were made. Corrected on the spot.
46 CFR 174.210(a)
Action required: 10 - Deficiency Rectified
Due 22 June 2023
Resolved 22 June 2023
14 - Pollution Prevention › 146 - MARPOL Annex VI › Quality of fuel oil
Issued 22 June 2023
Resolved
Vessel must carry fuel samples for a period of not less than 12 months. Vessel did not have sufficient amount of fuel oil samples. Verify sufficient amount of fuel oil samples at next COI inspection.
MARPOL ANNEX VI / Regulation 10
Action required: 705 - Other - as specified
Due 22 June 2023
Resolved 23 July 2024
Resolution: Operator provided pictures of fuel samples.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 22 June 2023
Resolved
Systems of fuel with power operated valves shall have local and remote closing capabilites. Remote closure did not work. Make proper repair.
46 CFR 56.50-60(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2023
Resolved 12 July 2023
Resolution: Recevied tech report for operable fuel shut off valve.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 10 June 2022
Resolved
The panel must visually and audibly signal the failure of each of these navigation lights. The panel alarm did not indicate when a fuse was pulled. Fix indicator and test.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2022
Resolved 24 June 2022
Resolution: Repaired panel and tested sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 June 2022
Resolved
The design, plan approval, installation, testing, and inspection of materials, machinery, automation, pressure vessels, and piping must comply with subchapter F of this chapter. Two branch line welds ruptured during pump test. Fix welds and pressure test to 1.5 x pump capacity.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 10 June 2022
Resolved 12 June 2022
Resolution: Conducted weld repairs of the piping and tested sat. ABS surveyor conducted test.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 25 March 2021
Resolved
Design, materials, and construction of all watertight doors and hatches shall be to the satisfaction of administration. The forward tank farm escape hatch were unable to seal properly.
14 SOLAS II-1 16.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 April 2021
Resolution: Vessel provide photographic and video evidence that the hatch is able to seal properly.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 25 March 2021
Resolved
Electrical installations on a vessel must ensure maintenance of services necessary for safety under normal conditions. The vsl starboard ground detection in engine room was illuminated.
46 CFR 111.01-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 March 2021
Resolution: Vsl provided photographic evidence that no ground was present for starboard panel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 March 2021
Resolved
All life-saving appliances shall be in working order and ready for immediate use. Port/ starboard bridge buoy and deck lifebuoy's grab lines were wasted.
14 SOLAS III 20.2
Action required: 10 - Deficiency Rectified
Resolved 25 March 2021
Resolution: Vessel change grab lines immediately.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 March 2021
Resolved
Pressure-indicating gauges shall be compatible with the relief valve's indicated settings. The upper range can't be less than 1.2 times nor more than 2 times the pressure at which the relieving device is set to function.
46 CFR 54.15-5(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 April 2021
Resolution: Vessel provide photographic evidence that they replaced pressure gauges for both air receivers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 June 2020
Resolved
POSITIVE SHUTOFF VALVES FOR FUEL SYSTEM DID NOT SEAT FULLY; VALVES MUST BE READILY ABLE TO CUT OFF FUEL AND MUST BE WITNESSED DOING SO.
46 CFR 56.50-60(d)
Action required: 17 - Rectify deficiencies prior to departure
Due 1 June 2020
Resolved 12 June 2020
Resolution: ABS Surveyor witnessed operation and provided evidence to attending MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 June 2020
Resolved
BALLAST WATER SYSTEM INOPERABLE DURING INSPECTION; VSL TO HAVE TECH ATTEND TO TROUBLESHOOT. EQUIPMENT MUST BE REPAIRED TO FUNCTION AS INTENDED.
33 CFR 151.2025(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2020
Resolved 12 June 2020
Resolution: ABS Surveyor witnessed operation and provided evidence to attending MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 June 2020
Resolved
OIL TRANSFER PROCEDURES AND DIAGRAM WERE NOT POSTED IN VICINITY OF FUEL PUMP TRANSFER STATION; MUST BE PROVIDED AND POSTED WITH CONTENTS AS REQUIRED BY 33 CFR 155.750.
33 CFR 155.720
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2020
Resolved 12 June 2020
Resolution: ABS Surveyor witnessed posting and provided evidence to attending MI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 1 June 2020
Resolved
WATERTIGHT DOORS ARE DESIGNED TO WITHSTAND A HEAD OF WATER EQUIVALENT TO THE DEPTH FROM THE SILL OF THE DOOR TO THE BULKHEAD DECK OR 10', WHICHEVER IS GREATER; WATERTIGHT DOORS LEADING TO ENGINE ROOM REQUIRED ADJUSTMENT, AS ONE DOG WAS NOT MAKING CONTACT WITH STRIKER PLATE AND AIR WAS BLOWING PAST KNIFE EDGE.
46 CFR 174.210(c)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2020
Resolved 12 June 2020
Resolution: ABS Surveyor witnessed operation and provided evidence to attending MI.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 1 June 2020
Resolved
PORT STEERING HYDRAULIC POWER UNIT CONTAINED CHAFED FLEXIBLE HOSES; MUST BE PROTECTED TO MINIMIZE WEAR AND PREVENT FIRE HAZARDS.
46 CFR 56.60-25(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2020
Resolved 12 June 2020
Resolution: ABS Surveyor witnessed addition of chafing gear and provided evidence to attending MI.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 1 June 2020
Resolved
FIRE DOORS LEADING TO LADDER FROM MAIN DECK AND 01 DECK WERE NOT LATCHING FULLY; DOORS SHALL BE ADJUSTED SUCH THAT THEY OPERATE AS SPECIFIED IN FIRE CONTROL PLAN.
46 CFR 127.210(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2020
Resolved 12 June 2020
Resolution: ABS Surveyor witnessed operation and provided evidence to attending MI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 1 June 2020
Resolved
EACH HATCH EXPOSED TO THE WEATHER MUST BE WATERTIGHT; ESCAPE HATCH FROM FOWARD HOLD WAS IMPROPERLY ADJUSTED AND WAS INOPERABLE FROM INSIDE. CREW RECTIFIED IN PRESENCE OF MI.
46 CFR 174.220(a)
Action required: 10 - Deficiency Rectified
Due 1 June 2020
Resolved 1 June 2020
Resolution: Recified in presence of attending MI.