← All vessels
PRINCE TLP
PRINCE TLP is a 2000 industrial vessel. The Coast Guard has recorded 46 inspections since 2000, most recently in January 2026, along with 41 deficiencies and 1 operational control.
Records from 2000 to 2026. Most recent: inspection, 16 January 2026.
- Built
- 2000
- Last inspected
- 16 January 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 41 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
WDF 8662
12359
Flag
UNITED STATES
—
Maury page id
psix-12359
Inspections, by type
…with no type recorded4
Years with a record
24 calendar years (2000–2026)
The 46 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.
Documentation record
Tonnage as PSIX records itNot recorded
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 46
16 January 2026
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8297468
19 September 2025
Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8238860
26 June 2024
Administrative Inspection · Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7943732
2 February 2024
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7931651
20 March 2023
Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7654290
20 June 2022
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7482252
14 April 2022
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7431304
10 June 2021
Administrative Inspection · COI Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7214320
18 September 2020
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7062122
6 September 2019
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6804940
29 October 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6570298
16 August 2018
Annual Inspection · Administrative Inspection · MTSA/ISPS Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6514824
26 July 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6222152
1 March 2017
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6096984
27 February 2017
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6153636
26 May 2016
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5887781
13 August 2015
Annual Inspection
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5214247
20 June 2014
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4894016
12 July 2012
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4377703
13 January 2012
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4224571
29 January 2009
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3439359
7 August 2008
Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3292698
23 July 2007
Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3004522
23 July 2007
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3005225
26 October 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2808505
4 August 2006
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2735743
1 August 2006
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2732470
20 July 2006
COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2719001
26 August 2005
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2475412
5 October 2004
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2213788
24 August 2004
Re-Inspection · In-Service Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2181385
19 April 2004
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2054893
31 March 2004
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2037118
28 October 2003
Construction Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1943683
23 October 2003
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1934729
14 July 2003
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1846016
16 August 2002
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1666524
29 March 2002
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1598919
26 December 2001
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1473879
3 August 2001
Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1440556
18 July 2001
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1379519
15 May 2001
Construction Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1366418
15 March 2001
Construction Oversight · Hull Examination
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 1060492
1 February 2001
Construction Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1435149
31 October 2000
Construction Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1459649
26 July 2000
Initial Construction-Excluding Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1463607
Deficiency record · 41
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 June 2024
Resolved
All marine engineering details, such as boilers, pressure vessels, main and auxiliary machinery, piping, valves, and fittings, shall be designed, constructed, and installed in accordance with the provisions of this subchapter. Observed the Main Gas Turbine A had severely corroded enclosure walls leaving large gap on lower section rendering the enclosure ineffective for its respective CO2 fire fighting suppression system. Main Gas Turbien A shall not be used until the enclosure structure is restored to its original strength as designed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 April 2022
Resolved
Each applicant for approval of plans must submit three copies of each of the plans, specifications, and structural calculations concerning the construction, arrangement, required equipment, and safety features of the unit as described in 33 CFR 107.305. These include General Arrangement, Hull Structure, Stability, Fire Control, Marine Engineering, Electrical Engineering, Life Saving Equipment, Personnel Accommodations, Construction Portfolios, and the Operating Manual. The OCMI Office recognized on 4/14/22 that Portable Accommodation Modules (PAMs) were installed prior to CG Approval. Submit all approved plans for final review to the D8 OCMI Office and request inspection before occupying any of the three newly-installed PAMs.
01 - Certificates & Documentation › 012 - Crew Certificates › Record of employment
Issued 6 September 2019
Resolved
An employee may request an exemption from the restrictions of employment in 33 CFR 141.15..The operating company authorized Sonoco to bring out persons without citizenship requirements or exemption letter. Prince is not an authorized facility.
33 CFR 141.20(a)
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 6 September 2019
Resolved
Lifeboats which are also rescue boats are required to have a data plate which states they have been prototyped to 46 CFR 156. Provide required data plate.
46 CFR 160.156-17
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 6 September 2019
Resolved
The emergency equipment provided... shall be maintained in good condition at all times. Monthly maintenance of releasing gear is not being conducted IAW manufacturers recommendations. Implement and provide feedback.
33 CFR 146.15
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 6 September 2019
Resolved
Each unit must carry at least one rescue boat approved under 46 CFR 160.156..and must have a rapid recovery winch. Prove by documentation or demonstrable evidence that winch meets rapid recovery standards.
46 CFR 108.560 and 108.570 (d)
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 6 September 2019
Resolved
The emergency equipment provided, shall be maintained in good condition at all times. Lifeboat A and B have wastage at lowering/recovery sheaves and lifeboat B has a broken/modified cable pulley mount. Provide NDE and evaluation report from a third party to verify the integrity of welds and modifications/repairs.
33 CFR 146.15
Electrical › Electric Generation Source (emergency) › Generator
Issued 26 July 2017
Resolved
During testing of the emergency generator, MI's observed loose fuel rail brackets. Remove all fuel rail brackets, inspect fuel rail, and repair to the satisfaction of the attending USCG Marine Inspector.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 26 July 2017
Resolved
During the inspection of the newly installed portable quarters, MI's observed the doors were listed as A60 Fire doors. However, no label was found and insufficient gasket material. Provide documentation attesting to fire class designation/rating and install to the satisfaction of the attending USCG marine inspector.
Lifesaving › Launching Appliances › Falls
Issued 27 February 2017
Resolved
Lifeboats A&B are past 4 yr fall renewal date. Lifeboats taken out of service and standby vessel required until boats are placed back in service. Operational control issued.
Lifesaving › Lifeboat › Propulsion Starting System
Issued 27 February 2017
Resolved
Lifeboats A&B failed to start during inspection. Both boats already taken out of service due to fall renewal dates.
Lifesaving › Lifeboat › Propulsion Engine
Issued 27 February 2017
Resolved
Lifeboats A-C have multiple repairs called out during last 3rd party servicing report with no resolutions >30days. Most notable were bad alternators on boats A&B and fuel leak on lifeboat A. It was noted that several smaller issues were noted, but no resolution taken. This resulted in an expanded SMS exam with BSEE to ensure the safety management system properly tracked maintenance and repairs.
Lifesaving › Lifeboat › Fire Protection (general)
Issued 31 May 2016
Resolved
Lifeboat C is to be taken out of service until air bottle is changed out/recharged. Current bottle has no pressure therefore boat has no internal air supply and lacks adeqaute fire protection. 33 CFR 146.15
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 31 May 2016
Resolved
Compressor control panels in hazardous location area is not sealed properly. Install control panel to Class I Div II requirements. PAJB5 Box has bare electrical wires. Install stuffing tubes to meet Class I Div II. [46 CFR 111.105]
Fire Fighting › Fire Pumps › Power Source
Issued 31 May 2016
Resolved
Fire pumps A and B nitrogen bottles and guages are not functioning. Recharge bottles as needed (starting bottles) and replaces guages as needed. [46 CFR 108.415]
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 31 May 2016
Resolved
Post fire control plan [46 CFR 109.563(a)]
Fire Fighting › Structural - A Class Divisions › Main Galleys
Issued 31 May 2016
Resolved
Galley door does not latch. Install proper latch and remove hold back. [46 CFR 108.137]
Fire Fighting › Structural - B Class Divisions › Accommodation Spaces
Issued 31 May 2016
Resolved
B Class doors in accommodation spaces are modified (latches missing, handle plates/locks missing or modified) and are required to be restored to original. [46 CFR 108.143(a)]
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 31 May 2016
Resolved
Accommodation and TLP electrical distribution panels are not labeled properly. [46 CFR 111.40-11 (a + b)
Fire Fighting › Structural - A Class Divisions › Stairways
Issued 31 May 2016
Resolved
At least one door in the stairway is required to be self-closing/latching. Doors are modified and neither latch. Repair to original condition / replace. [46 CFR 108.143(a)]
Lifesaving › Lifeboat › Drain Valve
Issued 31 May 2016
Resolved
Remove diesel fuel from lifeboat A bilge, clear drain plug of obstructing debris.
Lifesaving › Launching Appliances › Davit
Issued 31 May 2016
Resolved
Grease sheaves IAW plan; provide maintenance plan for sheaves and falls. Sheaves squeeled excessveily during tests. BS stated that they never grease sheaves and solely rely on annaul maintenance by 3rd party. It had been 6 months + since last maintenance or inspection of davit, sheaves, falls, etc. [46 CFR 109.301(b)]
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 31 May 2016
Resolved
A-60 door in washroom TLQ does not latch; modified. Repair to original condition. [46 CFR 108.137]
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 31 May 2016
Resolved
Properly execute lock-out / tag-out procedures w/ distrubtion panels. [46 CFR 111.01-1(a)]
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 13 August 2015
Resolved
Multiple electrical panels on the production deck inside hazardous area do not meet classification requirments. Required to provide documentaion that panle are classified or meet classified requirements.46CFR111.105-3
Fire Fighting › Fire Pumps › Arrangement
Issued 13 August 2015
Resolved
Both fire pumps were leaking cooling water. Repair to original condition. 33CFR145.15
Lifesaving › Lifeboat › Rigid Cover
Issued 13 August 2015
Resolved
Lifeboats b and c had water in hull of boat from leaking windows. Return boat to original condition. 33CFR146.15
Lifesaving › Launching Appliances › Release Mechanism
Issued 12 July 2012
Resolved
Release Hook on lifeboat B is not operating properly. Required to have 3rd party service the release hook and provide satisfactory report upon completion of service.
Lifesaving › Lifeboat › Propulsion Starting System
Issued 12 July 2012
Resolved
Engine in Lifeboat B will not start. Required to repair the starting system and have 3rd party verify condition and provide report to USCG upon service/repairs.
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 12 July 2012
Resolved
Lifeboat A has one bottle in the air support system that is extremely low. Reviewed reports from 3rd party servicing conducted in JAN12, which reported the same issue. Required to verify condition of bottle, and air lines, find the problem/air leak and complete proper repair to the system and recharge the bottle.
Lifesaving › Lifebuoys › Serviceable
Issued 12 July 2012
Resolved
02 Lifebuoys on the Cellar Deck are inserviceable (severly faded). Required to replace lifebuoys with serviceable ones.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 12 July 2012
Resolved
A new pressure vessel was installed on Fire pump #2. No CG stamp is on the tank, required to provide U1A form to verify construction of p/v.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 12 July 2012
Resolved
Supports on P/V for Fire pump #1 are severly wasted. Required to repair supports on p/v.
Lifesaving
Issued 3 August 2001
Resolved
Provide copy of Nabors Drilling final report of installation of work over drilling package.
Fire Fighting
Issued 3 August 2001
Resolved
Prove proper operation of fire pump"A" (diesel) fire pump must be operational prior to introduction of hydrocarbons.
Lifesaving
Issued 3 August 2001
Resolved
Complete installation of drilling package, make ready for Coast Guard inspection. Complete to the satisfaction of an attending Coast Guard inspector prior to commencing drilling operations. See attached list
Engineering
Issued 3 August 2001
Resolved
Prove proper operation of gas turbine generators operating on natural gas to the satisfaction of an attending Coast Guard inspector or ABS Surveyer.
Fire Fighting
Issued 3 August 2001
Resolved
Ensure proper operation and adequate water pressure from all fire hose stations for diesel powered fire water pumps.
Fire Fighting
Issued 3 August 2001
Resolved
Trouble-shoot & repair fire and gas detection system. Test to the satisfaction of an attending of an attending Coast Guard inspector or ABS Surveyor. Hourly rounds of affected areas to be made until this requirementis cleared. Log the same
Lifesaving
Issued 3 August 2001
Resolved
Ensure proper operation of PCP Controls prior to commencement of introduction of hydrocarbons. Provide documentation of satisfactory tests.
Documentation
Issued 3 August 2001
Resolved
Submit revised fire control and safety/ haz class area plans to reflect theinstallation of the drilling package and components.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National