Records from 2016 to 2026. Most recent: inspection, 20 April 2026.
Inspection history · 17
20 April 2026
Vessel Attendance · Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8340303
1 November 2025
Administrative Inspection · Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8261587
28 February 2025
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8086293
10 June 2024
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7931778
22 February 2024
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7868960
4 October 2023
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7803329
4 April 2023
Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7662353
6 April 2022
Annual Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7425821
22 October 2021
Drydock Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7337805
22 April 2021
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7176060
18 May 2020
Annual Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6955405
5 November 2019
In-Service Inspection · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6849425
2 April 2019
Administrative Inspection · COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6654448
3 April 2018
Annual Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6383969
9 November 2017
Hull Examination · In-Service Inspection · Deficiency Check · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6285885
5 April 2017
DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6118097
19 April 2016
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5855285
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 20 April 2026
Resolved
Fill pipes and sounding pipes must be so arranged that overflow of liquid or vapor cannot escape to the inside of the vessel. Fuel tank in machinery space was fitted with hose attached to an open valve at the bottom of the tank, then zip tied in a vertical direction to determine fuel level. Valve was closed by crew and will be removed now the TLI is operational.
46 CFR 182.445(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 May 2026
Resolved 27 April 2026
Resolution: Hose was removed valve was plugged
08 - Alarms › N/A - No Subsystem › Emergency signal
Issued 20 April 2026
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Visual indicator for the Machinery Bilge Pump was inoperable. Vessel will replace LED.
46 CFR 182.530(c)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 May 2026
Resolved 27 April 2026
Resolution: Vessel replaced entire bilge indicator at the op station
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 20 April 2026
Resolved
At each initial and subsequent COI, the owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment to include operation of the fire main system. Fire station valve on 2nd deck leaking from valve stem, tighten or replace packing.
46 CFR 176.810(a)(3)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 May 2026
Resolved 27 April 2026
Resolution: Crew added packing to valve all sat
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 April 2026
Resolved
Vessel must carry one floating waterlight, unless limited to daylight ops. Waterlight did not have lithium batteries as called for by manufacturer's instructions.
46 CFR 180.70(d)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 May 2026
Resolved 27 April 2026
Resolution: Replaced with lithium batteries
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 1 April 2025
Resolved
A hatch exposed to the weather must be watertight, except that the following hatches may be weathertight. A hatch on a vessel that operates only on protected waters. MI observed hatched leaking to engine room space. Rectify to the satisfaction of the Marine inspector. - 46 CFR 179.360(a)(3)
46 CFR 179.360(a)(3)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2025
Resolved 3 April 2025
Resolution: Crew tightened dogs and to complete the seal.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 April 2024
Resolved
Inspection of each portable fire extinguisher, semi-portable fire extinguisher, and fixed gas fire extinguishing system to check for excessive corrosion or general condition. Engine room fire system pressure was found to be near the minimal acceptable pressure range. Replace bottle or install new engine room fixed fire extinguishing system by 16 May 2024. The Master shall check engine room fire system gauge in accordance with manufactures technical information bulletin TIB 08-2001-001 to verify pressure is within acceptable limits prior to each voyage with passengers. Each fire system check prior to a voyage shall be logged and made available to the Coast Guard upon request.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 April 2024
Resolved 6 June 2024
Resolution: Cylinder has been replaced
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 2 April 2024
Resolved
A self priming, power driven fire pump must be installed on each vessel of not more than 65 feet in length that carries more than 49 passengers. The vessels fire pump electrical system was inoperable and fire pump was disconnected. The electrical box that the fire pump is connected to needs to be repaired or replaced to the satisfaction of the attending marine inspector prior to movement and prior to the carriage of passengers.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 3 April 2024
Resolution: Verified fire pump was properly connected to new electronic control module, verified pressure. operational test, sat
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 2 April 2024
Resolved
An engineered fixed gas fire extinguishing system must be installed in accordance with the manufacturers instructions. The fire system content needle was outside the green. When questioned the vessel rep stated the system has a very small leak. Upon receipt of the tech report from IFS Fire & Safety INC. the report states the cylinder has lost pressure and is 4% low. The fire system needs to be repaired or replaced to the satisfaction of the attending marine inspector prior to movement and prior to the carriage of passengers.
Condition: Placed in Improper Service
Action required: 60 - Rectify deficiencies prior to movement
Resolved 3 April 2024
Resolution: Received technical bulletin from manufacture showing gauge readings are within tolerances and that the fire extinguishing system is operational. Tech bulletin will be added to documents
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 April 2024
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. The STBD generator belt guard is wasted away from rubbing on pulley and needs to be replaced. The port guard is also starting to waste away due to rubbing on pulley and needs to be repaired or replaced to the satisfaction of the attending marine inspector
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 April 2024
Resolved 17 April 2024
Resolution: Puley guard was replaced with new
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 April 2024
Resolved
A crew work space must be of adequate construction, and with suitable equipment to provide for the safe operation of the vessel and the protection and accommodation of the crew. The port-forward canopy leg on the bridge weather deck has separated from the wasted handrail on the port side upper deck. Repair or replace to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 April 2024
Resolved 17 April 2024
Resolution: Handrail was repaired.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 May 2023
Resolved
A self priming, power driven fire pump must be installed on each vessel of not more than 19.8 meters (65 feet) in length that carries more than 49 passengers. The power driven fire pump was inoperable, it worked for about 5 seconds then quit working and would not start back up.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 May 2023
Resolution: Fire pump was replaced; operational test was SAT.
Fire Fighting › Fire Hoses › Condition
Issued 3 April 2018
Resolved
Upper deck fire hose leaking through material. Replace fire hose to the satisfaction of the attending Marine Inspector.
Condition: Invalid
Action required: 705 - Other - as specified
Due 10 April 2018
Resolved 6 April 2018
Resolution: Fire Hose was replaced with a new hose
Fire Fighting › Fire Hoses › Connections
Issued 3 April 2018
Resolved
A spanner wrench must be provided where a fire hose of 1.5 inch is required. Two spanner wrences are required for each fore hydrant.
Condition: Invalid
Action required: 705 - Other - as specified
Due 10 April 2018
Resolved 6 April 2018
Resolution: Vessel purchased 02 spanner wrenches and placed them at the fire stations
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 3 April 2018
Resolved
Contents of the first aid kit were found expired. Replace items to meet requirments found in 46CFR184.710.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 April 2018
Resolved 6 April 2018
Resolution: Vessel replaced all contents that were expired with new items
Engineering › Thrusters › Motor
Issued 24 November 2017
Resolved
24NOV2017 - Prior to carrying passengers all items of the ship's outfit shall be ready for testing and inspection. The burnt cable for Stern thruster was replaced along with associated thruster unit(s) & equipment making both thrusters, Bow & Stern, operational. Conducted underway operational test of thrusters and noticed that the motor for Stern thruster was creating sparks as it was operated. Notified vessel captain of the situation and secured from further operational testing. Identify cause and repair / replace Stern thruster motor by a certified marine electrician to the satisfaction of attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 November 2017
Resolution: Installed new thruster and satisfactory ops check.
Engineering › Thrusters › Motor
Issued 14 November 2017
Resolved
14 NOV 17 - Prior to carrying passengers all items of the ships outfit shall be ready for testing and inspection. Vessel's bow and stern thrusters have become inoperable after removing burnt cable leading to the stern thruster. Repair/replace cable and associated thruster unit(s) and equipment. Provide documentation identifying the cause of burnt cable and equipment failure. Have a certified marine electrician install cable and equipment in accordance with manufacturer's instructions to the satisfaction of the attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 November 2017
Resolution: Amended deficiency to incorporate sparks coming from thruster during operation. See amendment in deficiency #6 of this activity.
Engineering › Sea-water System (primary cooling) › Piping
Issued 9 November 2017
Resolved
Noticed running rust on starboard exhaust pipe in lazarette. Repair to satisfaction of attending CG marine inspector.
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 14 November 2017
Resolution: Satisfactory weld repair
Electrical › Electrical Distribution System (service) › Cable
Issued 9 November 2017
Resolved
Identified burned wiring and cable insulation on power cable for stern thruster power. Identify cause and replace cable.
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 24 November 2017
Resolution: Cable was replaced.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 9 November 2017
Resolved
Cable through-runs were not packed, allowing free movement of vapors and gases between spaces. Pack through-runs to satisfaction of attending CG marine inspector.
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 14 November 2017
Resolution: Packed through runs w/ 5200
Engineering › Steering Gear System › Rudder Stock
Issued 9 November 2017
Resolved
Noticed rust on port rudder post. Identify cause and repair to satisfaction of attending CG marine inspector.
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 14 November 2017
Resolution: Repacked port rudder post
Fire Fighting › Structural - B Class Divisions › Machinery Spaces
Issued 5 April 2017
Resolved
Wiring in aft steering gear room does not have fire stop leading through overhead bulkhead to bridge console. Fire hazards to be minimized. the general construction of the vessel must be such as to minimize fire hazards in so far as it is reasonable. PRIOR TO CARRYING PASSENGERS.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 April 2017
Resolved 6 April 2017
Resolution: deficiency cleared to the satisfaction of the attending marine inspector.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 April 2017
Resolved
battery charger terminal conductor not enclosed. (wire to plug connector)Each connection to a conductor or terminal port must be made within an enclosure. Due April 14, 2017.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 April 2017
Resolved 13 April 2017
Resolution: deficiency cleared to the satisfaction of the attending marine inspector.