MAURY USCG vessel records
← All vessels

RIO BRAVO

RIO BRAVO is a 1973 towing vessel. The Coast Guard has recorded 14 inspections since 1994, most recently in September 2025, along with 16 deficiencies and 1 operational control.

Records from 1994 to 2025. Most recent: inspection, 11 September 2025.

Built
1973
Last inspected
11 September 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Inspection record

Last inspected 11 September 2025
…with no type recorded5
Operational controls None recorded without a removal date
Years with a record 9 calendar years (1994–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8333207
WDL7896
124357
Flag
UNITED STATES
Maury page id
psix-124357

Documentation record

Registered dimensions (L × B × D)99.9 ft × 29.5 ft × 15.9 ft
Registered tonnagegross 90 / net 61
ITC dimensions (L × B × D)99.9 ft × 29.5 ft × 15.9 ft
ITC tonnagegross 325 / net 97
BuilderHOUMA WELDERS, INC. · HOUMA, LA, UNITED STATES · built 1973
Hull materialSteel
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portJACKSONVILLE, FL
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 3 March 2026 · expires 31 March 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it325 - Convention (Subpart B), Gross Ton
90 - Regulatory (Subpart C or D), Gross Ton
97 - Convention (Subpart B), Net Ton
61 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1980 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 14

11 September 2025 Vessel Attendance · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8236372
10 September 2025 Administrative Inspection
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8230854
14 April 2025 Drydock Exam · Internal Structural Exam · COI Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8116144
10 June 2024 Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7932091
24 May 2023 Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7694801
29 March 2022 Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7420709
25 February 2022 COI Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7402011
7 September 2019 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6807741
21 September 2013 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4739733
4 September 2013 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 4705468
7 April 2011 Industry Initiated Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3981360
31 March 2011 MARPOL
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3989800
1 February 2001 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4713999
19 July 1994 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 211832

Deficiency record · 16

01 - Certificates & Documentation › 011 - Ships Certificates › Tonnage certificate
Issued 26 August 2025 Resolved
A compartment within an open structure is considered open to the weather only when an interior bulkhead of that compartment has an opening or openings that meet the requirements for end bulkheads under paragraphs (d)(2)(i) and (iii) of this section. Other compartments within the structure are not considered open to the weather. There are multiple tonnage plates that are not "in the clear", due to paneling and other carpentry. Vessel needs to modify the internal configuration of the bulkheads, as necessary, to meet the requirement for "open structures", to the satisfaction of the tonnage issuing authority (ABS), or have the vessel remeasured, to account for the current configuration.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2025
Resolved 31 October 2025
Resolution: Class report provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 26 August 2025 Resolved
Each towing vessel 79 feet or more in length operating on oceans and coastwise routes that does not have an installed fixed fire-extinguishing system must have two self-contained breathing apparatus of the pressure demand, open circuit type, approved by the National Institute for Occupational Safety and Health (NIOSH), under 42 CFR part 84. 01 SCBA pack has a broken strap and is inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 September 2025
Resolved 10 September 2025
Resolution: SCBA unit replaced with a new one
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 August 2025 Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. The valve must be operable from a safe place outside the space where the valve is installed. Prove to Coast Guard Marine Inspectors the proper operation of fuel shutoff valves, handles of which are located in the fiddley.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 September 2025
Resolved 27 February 2026
Resolution: The pull station set up was removed. This was for the f/o transfer system and not a f/o line directly to a mde or gen.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 August 2025 Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Forward generator has an exhaust leak.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 September 2025
Resolved 10 September 2025
Resolution: Master provided statement that his engineer has corrected the exhaust manifold leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 August 2025 Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Starboard fuel valve body is leaking.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 September 2025
Resolved 10 September 2025
Resolution: Master provided statement that stbd fuel valve stem leak has been repaired.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 August 2025 Resolved
A fixed fire pump must be capable of delivering water at a flow rate of 80 gpm and 50 psi, and of being energized remotely from a safe place outside the engine room and at the pump. Fixed fire pump does not work to full capacity when activated remotely.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2025
Resolved 18 September 2025
Resolution: E-mail recived, with statement and photo stating a new remote fire pump start switch was installed and tested satisfactory. Accepted company reps statement and cleared.
01 - Certificates & Documentation › 012 - Crew Certificates › Evidence of Basic Training
Issued 26 August 2025 Resolved
Individuals, who are not crewmembers, on board a towing vessel must receive a safety orientation prior to getting underway. Training should include the location, operation, and use of lifesaving equipment, emergency procedures, methods to notify crewmembers in the event of an emergency, and prevention of falls overboard. Procedures for conducting orientation for individuals that are not crewmembers is missing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2025
Resolved 10 September 2025
Resolution: Company rep emailed with update, vessel training is now captured in HELM.
01 - Certificates & Documentation › 012 - Crew Certificates › Evidence of Basic Training
Issued 26 August 2025 Resolved
The owner or managing operator must implement a health and safety plan. The health and safety plan must document compliance with this part and include recordkeeping procedures. Annual healthy and safety refresher not completed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2025
Resolved 10 September 2025
Resolution: Vessel rep provided email stating that HS&E training has been transitioned into HELM, to track annual training.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 26 August 2025 Resolved
Each towing vessel must have a fire-detection system installed to detect engine room fires. Heat sensor above aft generator was discovered to be hanging out. Vessel rectified on the spot.
Action required: 10 - Deficiency Rectified
Resolved 26 August 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 26 August 2025 Resolved
Each immersion suit must be fitted with Type I retroreflective material that meets subpart 164.018 of this chapter. Retroreflective tape on immersion suit was falling off and unserviceable. Was replaced prior to leaving the vessel.
Action required: 10 - Deficiency Rectified
Resolved 26 August 2025
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 April 2025 Resolved
Each towing vessel must perform the applicable tests in Table 143.245(b) of this section. Alarm setpoints Twice every 5 years, with no more than 3 years elapsing since last test. Set points to be completed upon return to home port.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2025
Resolved 2 March 2026
Resolution: Tests completed.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 24 May 2023 Resolved
Each towing vessel operating in oceans and coastwise service must have a line throwing appliance approved under approval series 160.040. Charge on line throwing device expired in 2022; vessel may not operate on coastwise or oceans route until rectified.
Due 24 May 2023
Resolved 24 May 2023
Resolution: Line throwing device purchased.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 May 2023 Resolved
The following systems must be equipped with gauges at the machinery location: (3) auxiliary generator RPM. Auxiliary generators did not have RPM gauges.
Due 23 June 2023
Resolved 14 September 2023
Resolution: RPM Gauge replaced
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 May 2023 Resolved
Each towing vessel must be equipped with an industrial type first aid cabinet or kit. Eye wash bottles were expired.
Due 23 June 2023
Resolved 14 September 2023
Resolution: Eyewash bottles replaced
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 24 May 2023 Resolved
The following list of items must be recorded in the TVR, Official logbook: (3) record of drills. Drills have not been recorded since feb 2023
Due 24 May 2023
Resolved 24 May 2023
Resolution: Drills conducted and recorded.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 29 March 2022 Resolved
Vessel must have on board a properly installed, operational Coast Guard type-approved AIS class A device. AIS is not functioning properly, provide MSU Port Arthur a copy of technician report attesting to satisfactory operation of the AIS.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 March 2022
Resolved 29 March 2022
Resolution: received tech report attesting to satisfactory repairs of the AIS

Ownership record